Site Profile
- Introduction
(Revised May 11, 2007)
PDF 61 KB (11 pages)
Revision Includes: Includes Attribution and Annotation
section. Constitutes a total rewrite of the document. Incorporates
formal internal review comments. This revision results in no change
to the assigned dose and no PER is required.
- Site
Description
(Revised May 8, 2007)
PDF 1.1 MB (21 pages)
Revision Includes: Incorporates Attributions and Annotations,
Purpose and Scope Sections. Constitutes a total rewrite of the
document. Incorporates formal internal review comments. This
revision results in no change to the assigned dose and no PER is
required.
- Occupational
Medical Dose
(Revised February 1, 2007)
PDF 99 KB (20 pages)
Revision Includes: Approved Revision
02 for organ dose assignment based on site specific
information. Added Section 3-5, Skin Dose Method Description
and Section 3-8, Attributions and Annotations. Incorporates
internal formal and NIOSH formal review comments. Constitutes
a total rewrite of document. This revision results in
an increase in assigned dose and a PER is required.
- Occupational
Environmental Dose
(Revised June 22, 2007)
PDF 660 KB (43 pages)
Revision Includes: Incorporates Attributions and Annotations. Constitutes a total
rewrite of the document. Incorporates formal internal review
comments. No changes were needed as a result of formal NIOSH
review. This revision results in no change to the assigned dose and
no PER is required.
- Occupational Internal
Dose
(Revised June 22, 2007)
PDF 404 KB (72 pages)
Revision Includes: Incorporates Attributions and Annotations
and additional references. No sections were deleted. Minor editorial
changes were made in Sections 5.2.1, 5.2.1.1, 5.2.1.1.4, 5.2.2.5, and
5.2.2.6.2. Constitutes a total rewrite of the document. Incorporates
formal internal and NIOSH review comments. This revision results in
no change to the assigned dose and no PER is required.
- Occupational External
Dose
(Revised June 22, 2007)
PDF 597 KB (74 pages)
Revision Includes: Incorporates Attributions and
Annotations section. Constitutes a total rewrite of the document.
Added references and made editorial changes. Modified Table 6-1
average total dose for 1958, 1977, 1983, and 1997. Modified Table
6-9 to add Radiography NDE. No further changes occurred as a
result of formal internal review. Incorporates formal NIOSH review
comments. This revision results in no change to the assigned dose
and no PER is required. Training required: As determined by the
Task Manager. Initiated
Top of Page
Technical Information Bulletins (TIBs)
At the current time, there are no TIBs for the Pantex Plant.
Top of Page
Program Evaluation Reports (PERs) and Program Evaluation Plans (PEPs)
NIOSH is committed to applying the best available science in dose reconstructions. In keeping with this commitment, completed cases with probabilities of causation less than 50% are reviewed as relevant new information becomes available. The results of these reviews are described in a Program Evaluation Report (PER). The PER details the effect, if any, of the new information on the completed dose reconstruction. If it appears that the compensability of a completed dose reconstruction may be effected, NIOSH is committed to working with the Department of Labor to reopen and rework the dose reconstruction, as appropriate. A Program Evaluation Plan (PEP) describes plans for evaluating specific program details or issues.
- PER 26: Pantex TBD Revision - ORAUT-TKBS-0013
PDF 16 KB (2 pages)
Document Number: OCAS-PER-026 Rev-00
About this Document: New document to determine which
previously completed claims require
evaluation for the effect of revising the
Pantex TBD.
Approved: October 31, 2007
Summary: There were 50 Pantex claims meeting the employment dates and target organ criteria above that were completed with a probability of causation below 50% prior to February 1, 2007. NIOSH will review the records of each claim to determine if the dose assigned in the revised TBD is higher than that assigned in the dose reconstruction. NIOSH will provide DOL with the list of 50 claims as well as a determination on each claim as to whether a new Dose Estimate is required. Documentation for each claim not requiring a new dose reconstruction will provide the basis for that determination.
Top of Page
Worker Outreach Activities
Based on a recommendation from the Advisory Board to provide workers and site experts with opportunities to participate in developing the technical documents used in dose reconstruction, NIOSH established a Worker Outreach Program.
At Worker Outreach Meetings, current and former DOE and AWE employees have opportunities to obtain information about Site Profiles, Technical Basis Documents, and Technical Information Bulletins, and to provide information for consideration and possible use in dose reconstruction. This process is valuable to ensure that the technical documents used in dose reconstruction contain correct and useful information.
Below are the Worker Outreach Activities for the Pantex Plant:
- June 3, 2004
Meeting with the Metal Trades Council
Final Minutes
PDF 52 KB (11 pages)
Top of Page
Comments on Pantex Plant Documents
How to Submit Comments
Comments on Pantex Plant documents can be submitted to the NIOSH Docket Officer electronically by e-mail at NIOCINDOCKET@cdc.gov or printed comments can be mailed to NIOSH Docket Office, Robert A. Taft Laboratories, MS-C34, 4676 Columbia Parkway, Cincinnati, OH 45226. Please include the Site Profile Number (031) on all comments.
Comments Received
Top of Page
Special Exposure Cohort Petition Information for the Pantex Plant
- Petition Information
Location: Amarillo, Texas
Job Titles and/or Job Duties: Production workers, technicians,
including radiography, guards, physical
plant, maintenance, administrative and
support staff, contractors, and Atomic
Energy Commission staff
Period of Employment: January 1,
1950 through December 31, 1991
- Federal Register Notice Announcing that the Pantex Plant SEC Petition has met the Minimum Qualifications for Review and Evaluation
December 17, 2007
PDF 45 KB (1 page)
- Copy of the Petition Received
Pantex Plant Petition
PDF 1.3 MB (33 pages)
- SEC Petition Evaluation Report
Pantex Plant Evaluation Report
PDF 603 KB (67 pages)
- Petition to be Discussed by the Advisory Board
The petition will be discussed by the Advisory Board at its September 2-4, 2008, meeting.
- Advisory Board Recommendation on SEC Petition
The Advisory Board has not discussed the petition at this time.
- HHS Letter to Congress Regarding the SEC Petition
Not applicable at this time.
(Note: this only applies if the class is added to the SEC.)
- Federal Register Notice: Designation of a Class of Employees
for Addition to the Special Exposure Cohort
Not applicable at this time.
(Note: this only applies if the class is added to the SEC.)
- HHS Designation of Additional Members to the SEC
Not applicable at this time.
(Note: this only applies if the class is added to the SEC.)
- Effective Date for the SEC Class
Not applicable at this time.
(Note: this only applies if the class is added to the SEC.)
- Federal Register Notice: Final Effect of Designation of a Class of Employees for Addition to the Special Exposure Cohort
Not applicable at this time.
(Note: this only applies if the class is added to the SEC.)
- Letter to DOL Regarding the Addition of a New Class of Employees to the SEC
Not applicable at this time.
(Note: this only applies if the class is added to the SEC.)
- Letter from DOL Regarding the Return of All Cases for the New SEC Class
Not applicable at this time.
(Note: this only applies if the class is added to the SEC.)
Top of Page
Previous Versions of Pantex Plant Technical Documents
Site Profile: Introduction section
Revised July 27, 2006
PDF 118 KB (10 pages)
Revision Includes: Constitutes a total rewrite of document. Revised as a result of the biennial document review. Incorporates NIOSH formal review comments. This revision results in no change to the assigned dose.
Approved February 18, 2004
PDF 78 KB (7 pages)
Site Profile: Site Description section
Revised July 27, 2006
PDF 1.06 MB (18 pages)
Revision Includes: Constitutes a total rewrite of document. Revised as a result of the
biennial document review. Incorporates NIOSH formal review
comments. This revision results in no change to the assigned dose.
Approved March 30, 2004
PDF 1.07 MB (17 pages)
Site Profile: Occupational Medical Dose
Revised December 23, 2005
PDF 155 KB (19 pages)
Revision Includes: Document Publication Record contains no detailed description of revision details.
Approved August 24, 2004
PDF 177 KB (15 pages)
Site Profile: Occupational
Environmental Dose
(Approved August 24, 2004)
PDF 690 KB (36 pages)
Site Profile: Occupational Internal
Page Change Revision February 8, 2007
PDF 360 KB (55 pages)
Page Change Revision Includes: Page change revision to change the date for the first DU-laden
hydroshot from 1952 to 1959 on page 31. Updated the text in
Section 5.2.2.6 on page 28 and updated Table 5-11 on page 32 and
5-19 on page 48. Added reference on page 49 for the telephone
conversation that confirmed the actual date. Table 5-1 was moved
from page 9 to page 10. Results in a decrease in the intake of DU
and resultant dose for the years 1952 to 1959. Text was modified or
added in Section 5 and References (pages 9-12, 28, 31-32, 48-49,
and 53). No sections were deleted. Incorporates internal formal
review comments and NIOSH formal review comments. This
revision results in a reduction in assigned dose and no PER is
required.
Approved July 27, 2006
PDF 390 KB (54 pages)
Site Profile: Occupational External
Dose
(Approved July 27, 2006)
PDF 481 KB (60 pages)
Top of Page
Page last updated: August 20, 2008
Page last reviewed: May 30, 2008
Content Source: National Institute for Occupational Safety and Health (NIOSH)
|