[Code of Federal Regulations] [Title 40, Volume 25] [Revised as of July 1, 2008] From the U.S. Government Printing Office via GPO Access [CITE: 40CFR265.116] [Page 535] TITLE 40--PROTECTION OF ENVIRONMENT CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) PART 265_INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE Subpart G_Closure and Post-Closure Sec. 265.116 Survey plat. No later than the submission of the certification of closure of each hazardous waste disposal unit, an owner or operator must submit to the local zoning authority, or the authority with jurisdiction over local land use, and to the Regional Administrator, a survey plat indicating the location and dimensions of landfill cells or other hazardous waste disposal units with respect to permanently surveyed benchmarks. This plat must be prepared and certified by a professional land surveyor. The plat filed with the local zoning authority, or the authority with jurisdiction over local land use must contain a note, prominently displayed, which states the owner's or operator's obligation to restrict disturbance of the hazardous waste disposal unit in ac cord ance with the applicable subpart G regulations.