[Code of Federal Regulations]
[Title 49, Volume 4]
[Revised as of October 1, 2002]
From the U.S. Government Printing Office via GPO Access
[CITE: 49CFR230.20]

[Page 326]
 
                        TITLE 49--TRANSPORTATION
 
       CHAPTER II--FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF 
                             TRANSPORTATION
 
PART 230--STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS--Table of Contents
 
                           Subpart A--General
 
Sec. 230.20  Alteration and repair report for steam locomotive boilers.

    (a) Alterations. When an alteration is made to a steam locomotive 
boiler, the steam locomotive owner and/or operator shall file an 
alteration report (FRA Form No. 19), detailing the changes to the 
locomotive with the FRA Regional Administrator within 30 days from the 
date the work was completed. This form shall be attached to, and 
maintained with, the FRA Form No. 4 until such time as a new FRA Form 
No. 4 reflecting the alteration is submitted to the Regional 
Administrator. Alteration reports shall be filed and maintained for the 
life of the boiler. (See appendix B of this part.)
    (b) Welded and riveted repairs to unstayed portions of the boiler. 
Whenever welded or riveted repairs are performed on unstayed portions of 
a steam locomotive boiler, the steam locomotive owner and/or operator 
shall file with the FRA Regional Administrator, within 30 days from the 
time the work was completed, a repair report, FRA Form No. 19, that 
details the work done to the steam locomotive. Repair reports shall be 
filed and maintained for the life of the boiler. (See appendix B of this 
part.)
    (c) Welded and riveted repairs to stayed portions of the boiler. 
Whenever welded or riveted repairs are performed on stayed portions of a 
steam locomotive boiler, the steam locomotive owner and/or operator 
shall complete a repair report (FRA Form No. 19), detailing the work 
done. Repair reports shall be maintained for the life of the boiler. 
(See appendix C of this part.)