Sec. 230.116  Oil tanks.

    The oil tanks on oil burning steam locomotives shall be maintained 
free from leaks. The oil supply pipe shall be equipped with a safety 
cut-off device that:
    (a) Is located adjacent to the fuel supply tank or in another safe 
location;
    (b) Closes automatically when tripped and that can be reset without 
hazard; and
    (c) Can be hand operated from clearly marked locations, one inside 
the cab and one accessible from the ground on

[[Page 346]]

each exterior side of the steam locomotive.

             Appendix A to Part 230--Inspection Requirements

    The lists in this appendix are intended as guidance only. Adherence 
to this list does not relieve the steam locomotive owner and/or operator 
of responsibility for either: (1) Completing the inspection and 
maintenance requirements described in this part; or (2) ensuring that 
the steam locomotive, tender and its parts and appurtenances are safe 
and suitable for service.

               Daily Inspection Requirements; Sec. 230.13

    1. Observance of lifting pressure of the lowest safety valve.
    2. Testing of water glasses and gauge cocks.*
    3. Inspection of tubular water glass shields.
    4. Inspection of all cab lamps.*
    5. Inspection of boiler feedwater delivery systems.*
    6. Inspection of lagging for indication of leaks.
    7. Inspection for leaks obstructing vision of engine crew.
    8. Observance of compressor(s) and governor to ascertain proper 
operation.*
    9. Inspection of brake and signal equipment.*
    10. Inspection of brake cylinders for piston travel.
    11. Inspection of foundation brake gear.
    12. Inspection of sanders.*
    13. Inspection of draw gear and chafing irons.
    14. Inspection of draft gear.
    15. Inspection of crossheads and guides.
    16. Inspection of piston rods and fasteners.
    17. Inspection of main, side, and valve motion rods.
    18. Inspection of headlights and classification lamps.*
    19. Inspection of running gear.
    20. Inspection of tender frames and tanks.
    21. Inspection of tender trucks for amount of side bearing 
clearance.

    Note: All items marked (*) should be checked at the beginning of 
each day the locomotive is used.

           31 Service Day Inspection Requirements; Sec. 230.14

    1. Washing of boiler.
    2. Cleaning and inspection of water glass valves and gauge cocks.
    3. Cleaning, washing and inspection of arch tubes, water bar tubes, 
circulators and siphons.
    4. Removal and inspection of all washout and water tube plugs.
    5. Testing of all staybolts.
    6. Removal, cleaning and inspection of fusible plugs (if any).

           92 Service Day Inspection Requirements; Sec. 230.15

    1. Removal and testing of all air and steam gauges.
    2. Cleaning of steam gauge siphon pipe.
    3. Renewal of tubular water glasses.
    4. Testing and adjusting of safety relief valves.
    5. Testing of main reservoir and brake cylinder leakage.
    6. Entering and inspection of tender tank interior.

               Annual Inspection Requirements; Sec. 230.16

    1. Testing of thickness of arch and water bar tubes (arch brick to 
be removed)
    2. Hydrostatic testing of boiler.
    3. Testing of all staybolts.
    4. Interior inspection of boiler.
    5. Thickness verification of dry pipes.
    6. Smoke box inspection.
    7. Main reservoir hammer or UT testing and hydrostatic testing (for 
non-welded and drilled main reservoirs)
    8. Removal and inspection of steam locomotive drawbar(s) and pins 
(NDE testing other than merely visual)
    9. Inspection of longitudinal lap joint boiler seams.

               5 Year Inspection Requirements; Sec. 230.16

    1. Inspection of flexible staybolt caps and sleeves.

          1472 Service Day Inspection Requirements; Sec. 230.17

    1. Removal of boiler flues (as necessary) and cleaning of boiler 
interior.
    2. Removal of jacket and lagging and inspection of boiler interior 
and exterior.
    3. Hydrostatic testing of boiler.
    4. Thickness verification (boiler survey) and recomputation and 
update of steam locomotive specification card, (FRA Form No. 4).

[[Page 347]]

              Appendix B to Part 230--Diagrams and Drawings
      [GRAPHIC] [TIFF OMITTED] TR17NO99.015
      

[[Page 348]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.016


[[Page 349]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.017


[[Page 350]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.018


[[Page 351]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.019


[[Page 352]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.020


[[Page 353]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.021


[[Page 354]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.022


[[Page 355]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.023


[[Page 356]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.024


[[Page 357]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.025


[[Page 358]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.026


[[Page 359]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.027


[[Page 360]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.028


[[Page 361]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.029


[[Page 362]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.030


[[Page 363]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.031


[[Page 364]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.032


[[Page 365]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.033


[[Page 366]]


              Appendix C to Part 230--FRA Inspection Forms
      [GRAPHIC] [TIFF OMITTED] TR17NO99.034
      

[[Page 367]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.035


[[Page 368]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.036


[[Page 369]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.037


[[Page 370]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.038


[[Page 371]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.039


[[Page 372]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.040


[[Page 373]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.041


[[Page 374]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.042


[[Page 375]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.043


[[Page 376]]


[GRAPHIC] [TIFF OMITTED] TR17NO99.044


[[Page 377]]


             Appendix D to Part 230--Civil Penalty Schedule

------------------------------------------------------------------------
                                                               Willful
                   Section                      Violation     violation
------------------------------------------------------------------------
             Subpart A--General

230.11 Repair of non-complying conditions:
    (a) Failure to repair non-complying            $1,000        $2,500
     steam locomotive prior to use in
     service................................
    (b) Failure of owner and/or operator to         1,000         1,500
     approve repairs made prior to use of
     steam locomotive.......................
230.12 Movement of non-complying steam              (\1\)         (\1\)
 locomotive:
230.13 Daily inspection:
    (a) (b):
        (1) Inspection overdue..............        1,500         3,000
        (2) Inspection not performed by             1,000         1,500
         qualified person...................
    (c) Inspection report not made,                 1,000         1,500
     improperly executed or not retained....
230.14 Thirty-one service day inspection:
    (a):
        (1) Inspection overdue..............        1,500         3,000
        (2) Inspection not performed by       ............  ............
         qualified person...................
    (b) Failure to notify FRA...............        1,000         1,500
    (c) Inspection report not made,                 1,000         1,500
     improperly executed, not properly filed
230.15 Ninety-two service day inspection:
    (a):
        (1) Inspection overdue..............        1,500         3,000
        (2) Inspection not performed by             1,000         1,500
         qualified person...................
    (b) Inspection report not made,                 1,000         1,500
     improperly executed, not properly filed
230.16 Annual inspection:
    (a):
        (1) Inspection overdue..............        1,500         3,000
        (2) Inspection not performed by             1,000         1,500
         qualified person...................
    (b) Failure to notify FRA...............        1,000         1,500
    (c) Inspection report not made,                 1,000         1,500
     improperly executed, not properly filed
230.17 One thousand four hundred seventy-two
 service day inspection:
    (a):
        (1) Inspection overdue..............        1,500         3,000
        (2) Inspection not performed by             1,250         2,000
         qualified person...................
    (b) Inspection report not made,                 1,000         1,500
     improperly executed, not properly
     maintained, not properly filed.........
230.18 Service days:
    (a) Service day record not available for        1,000         1,500
     inspection.............................
    (b) Failure to file service day report          1,000         1,500
     with FRA Regional Administrator........
    (c) Failure to complete all 1,472               1,500         3,000
     service day inspection items prior to
     returning retired steam locomotive to
     service................................
230.19 Posting of forms:
    (a) FRA Form No. 1:
        (1) FRA Form No. 1 not properly             1,000         1,500
         filled out.........................
        (2) FRA Form No. 1 not properly             1,000         1,500
         displayed..........................
    (b) FRA Form No. 3:
        (1) FRA Form No. 3 not properly             1,000         1,500
         filled out.........................
        (2) FRA Form No. 3 not properly             1,000         1,500
         displayed..........................
230.20 Alteration and repair reports:
    (a) Alterations:
        (1) Failure to properly file FRA            1,000         1,500
         Form No. 19 with FRA Regional
         Administrator......................
        (2) FRA Form No. 19 not properly            1,000         1,500
         filled out.........................
        (3) FRA Form No. 19 not properly            1,000         1,500
         maintained.........................
    (b) Repairs to unstayed portions of the
     boiler:
        (1) FRA Form No. 19 not properly            1,000         1,500
         filled out.........................
        (2) FRA Form No. 19 not properly            1,000         1,500
         maintained.........................
    (c) Repairs to stayed portions of the
     boiler:
        (1) FRA Form No. 19 not properly            1,000         1,500
         filled out.........................
        (2) FRA Form No. 19 not properly            1,000         1,500
         maintained.........................
230.21 Failure to properly document steam           1,000         1,500
 locomotive number Change...................

    Subpart B--Boilers and Appurtenances

230.22 Failure to properly report accident          1,500         2,500
 resulting from failure of steam locomotive
 boiler or part or appurtenance thereof.....
230.23 Responsibility for general
 construction and safe working pressure:
    (a) Failure to properly establish safe          5,000        10,000
     working pressure for steam locomotive
     boiler.................................
    (b) Placing steam locomotive in service         5,000        10,000
     before safe working pressure for boiler
     has been established...................
230.24 Maximum allowable stress values on
 boiler components:
    (a) Use of materials not of sufficient          1,000         2,000
     tensile strength.......................
    (b) Use of a safety factor value of less        2,000         4,000
     than 4 when using the code of original
     construction in boiler calculations....
230.25 Maximum allowable stresses on stays
 and braces:
    (a) Exceeding allowable stress values on        1,000         2,000
     fire box and/or combustion chamber.....
    (b) Exceeding allowable stress values on        1,000         2,000
     round, rectangular or gusset braces....

[[Page 378]]


230.29 Inspection and repair:
    (a):
        (1) Failure of owner and/or operator        1,500         3,000
         to inspect and repair any steam
         locomotive boiler and/or
         appurtenance under control thereof.
        (2) Failure to remove steam                 2,500         5,000
         locomotive from service when
         considered necessary to do so......
    (b):
        (1) Failure of perform repairs in           2,000         4,000
         accordance with accepted industry
         standards..........................
        (2) Owner and/or operator returning         2,000         4,000
         steam locomotive boiler and/or
         appurtenances to service before
         they are in good condition and safe
         and suitable for service...........
230.30 Lap-joint seam boilers, Failure to           2,000         4,000
 properly inspect...........................
230.31 Flues to be removed:
    (a):
        (1) Failure to remove all flues when        1,500         3,000
         inspecting boiler..................
        (2) Failure to enter boiler and             1,500         3,000
         clean and inspect..................
    (b) Failure to remove superheater flues         1,000         2,000
     when deemed necessary to do so.........
230.32 Time and method of inspection:
    (a) Failure to perform 1,472 service day        1,500         3,000
     inspection when required to do so......
    (b) Failure to properly inspect boiler          1,500         3,000
     during 1,472 service day inspection....
230.33 Welded repairs and alterations:
    (a) Failure to obtain permission before         1,500         3,000
     welding on unstayed portions of boiler
     containing alloy or carbon steel with
     carbon content over .25 percent carbon.
    (b) Failure to perform welding on               1,500         3,000
     unstayed portions of boiler containing
     carbon steel not exceeding .25 percent
     carbon in accordance with a nationally
     accepted standard for boiler repairs...
    (c):
        (1) Failure to submit written               1,500         3,000
         request for approval before
         performing weld buildup on wasted
         areas of unstayed boiler surfaces
         that exceed 100 square inches or
         the smaller of 25 percent of
         minimum required wall thickness or
         \1/2\ inch.........................
        (2) Repairing wasted sheets.........        1,500         3,000
230.34 Riveted repairs and alterations:
    (a) Failure to obtain approval before           1,500         3,000
     making riveted alterations on unstayed
     portions of the boiler; failure to do
     riveting in accordance with established
     railroad practices or accepted national
     standards for boiler repairs...........
    (b) Failure to perform riveted repairs          1,500         3,000
     on unstayed boiler portions in
     accordance with established railroad
     practices or accepted national
     standards for boiler repairs...........
    (c) Failure to perform riveted repairs          1,000         2,000
     on stayed boiler portions in accordance
     with established railroad practices or
     accepted national standards for boiler
     repairs................................
230.35 Failure to raise temperature of steam        1,000         2,000
 locomotive boiler to 70 degrees F. before
 applying hydrostatic pressure to the boiler
230.36 Hydrostatic testing of boilers:
    (a) Failure to perform hydrostatic test         1,500         3,000
     of boiler as required..................
    (b) Failure to properly perform                 1,500         3,000
     hydrostatic test.......................
    (c) Failure to properly inspect boiler          1,500         3,000
     after conducting hydrostatic test above
     MAWP...................................
230.37 Failure to perform proper steam test         1,000         2,000
 or inspection of boiler after completion of
 repair or alteration to boiler.............
230.38 Telltale holes:
    (a) Failure to have telltale holes as           1,000         2,000
     required in staybolts..................
    (b) Failure to have proper telltale             1,000         2,000
     holes in reduced body staybolts........
    (c) Failure to keep telltales holes when        1,000         2,000
     so required............................
230.39 Broken staybolts:
    (a) Boiler in service with excess number        1,500         3,000
     of broken staybolts....................
    (b) Failure to replace staybolts when           1,500         3,000
     required to do so; to properly replace
     staybolts when so required; to inspect
     adjacent staybolts when replacing
     broken staybolts.......................
    (c) Failure to count leaking, plugged,          1,500         3,000
     or missing telltale holes as broken
     staybolts..............................
    (d) Closing telltale holes by prohibited        1,500         3,000
     means..................................
230.40 Time and method of staybolt testing:
    (a) Failure to hammer test staybolts            1,000         2,000
     when so required.......................
    (b) Failure to properly hammer test             1,000         2,000
     staybolts..............................
230.41 Flexible staybolts with caps:
    (a) Failure to inspect flexible                 1,000         2,000
     staybolts as required..................
    (b) Failure to replace broken flexible          1,000         2,000
     staybolts; failure to close inner ends
     of telltale holes as required..........
    (c) Failure to report removal of                1,000         2,000
     flexible staybolts caps and other tests
     on FRA Form No. 3 when so required.....
    (d) Failure to remove staybolt caps or          1,000         2,000
     otherwise test when FRA inspector or
     steam locomotive owner and/or operator
     consider it necessary to do so.........
230.42 Failure to have accurate boiler steam        2,000         4,000
 gauge where engine crew can conveniently
 read.......................................
230.43 Failure to have gauge siphon of              1,000         2,000
 proper capacity on steam gauge supply pipe;
 failure to properly clean, maintain the
 steam gauge supply pipe....................
230.44 Failure to test steam gauge when so          1,000         2,000
 required...................................
230.45 Failure to properly test and/or set          1,000         2,000
 steam gauge................................
230.46 Failure to attach to boiler backhead         1,000         1,500
 metal badge plate showing allowable steam
 pressure...................................
230.47 Boiler Number:

[[Page 379]]


    (a) (b) (c) Failure to stamp builder's          1,000         1,500
     number on boiler when number is known..
230.48 Number and capacity of safety relief
 valves:
    (a) Failure to equip steam locomotive           2,500         5,000
     boiler with proper safety relief valves
    (b) Failure to provide additional safety        3,000         6,000
     relief valve capacity when so required.
230.49 Setting of safety relief valves:
    (a) Safety relief valve(s) set and/or           2,500         5,000
     adjusted by person not competent to do
     so.....................................
    (b) Safety relief valve(s) not set to           2,500         5,000
     open at prescribed pressure(s).........
    (c) Safety relief valve(s) not properly         3,000         6,000
     set....................................
    (d) Set pressure of lowest safety relief        1,000         2,000
     valve not properly indicated...........
230.50 Failure to test and adjust safety            1,500         3,000
 relief valves when required to do so.......
230.51 Failure to equip steam locomotive            1,000         2,000
 boiler with at least 2 properly installed
 water glasses..............................
230.52 Failure to properly equip water              2,000         4,000
 glasses....................................
230.53 Failure to properly clean water glass        1,000         2,000
 valves and/or gauge cocks when required to
 do so......................................
230.54 Testing and maintenance:
    (a) Failure to properly test water              1,000         2,000
     glasses and/or gauge cocks.............
    (b) Failure to properly maintain gauge          1,500         3,000
     cocks, water column drain valves, and/
     or water glass valves..................
230.55 Tubular type water and lubricator
 glasses and shields:
    (a) Failure to renew tubular type water         1,000         2,000
     glasses as required....................
    (b) Failure to properly shield tubular          1,000         2,000
     water glasses and/or lubricator glasses
    (c) Failure to properly locate and/or           1,000         2,000
     maintain water glasses and/or water
     glass shields..........................
230.56 Failure to equip water glass with            1,000         2,000
 suitable lamp..............................
230.57 Injectors and feedwater pumps:
    (a) Failure to equip steam locomotive           3,000         6,000
     with proper means for delivering water
     to the boiler..........................
    (b) Failure to properly test and/or             2,500         5,000
     maintain injectors, feedwater pumps,
     boiler checks, delivery pipes, feed
     water pipes, tank hose, tank valves....
    (c) Failure to properly brace injectors,        1,000         2,000
     feedwater pumps, and/or associated
     piping.................................
230.58 Flue plugs:
    (a) Plugging flue plugs when not                1,000         2,000
     otherwise permitted....................
    (b) Improperly plugging flue plugs, when        1,000         2,000
     otherwise permitted....................
230.59 Failure to remove and properly clean         1,500         3,000
 fusible boiler plugs when required to do
 so; failure to properly note removal.......
230.60 Time of washing:
    (a) Failure to thoroughly wash boiler           1,000         2,000
     when required to do so.................
    (b) Failure to remove washout plugs,            1,500         3,000
     arch tube plugs, thermic siphon plugs,
     circulator plugs, water bar plugs when
     washing locomotive boiler..............
    (c) Failure to examine and/or properly          1,500         3,000
     maintain washout plugs washout plug
     sleeves, threaded openings.............
    (d) Failure to clean fusible plugs when         1,500         3,000
     required to do so......................
230.61 Arch tubes, water bar tubes,
 circulators and thermic siphons:
    (a) Failure to clean, wash, inspect arch        1,000         2,000
     tubes, water bar tubes, circulators and
     thermic siphons as required............
    (b) Failure to renew arch tubes, water          1,500         3,000
     bar tubes; failure to repair or renew
     circulators, thermic siphons when
     required...............................
    (c) Failure to properly inspect and/or          1,500         3,000
     replace as necessary arch tubes, water
     bar tubes, circulators.................
230.62 Failure to properly inspect and/or           2,500         5,000
 repair or replace as necessary dry pipes
 subject to pressure........................
230.63 Failure to properly inspect smoke            1,500         3,000
 box, steam pipes, pressure parts when
 required to do so..........................
230.64 Failure to remove from service steam         1,500         3,000
 locomotive boiler leaking under lagging
 from condition which may reduce safety and/
 or repair the boiler before returning to
 service....................................
230.65 Failure to keep steam locomotive             1,000         2,000
 boiler, piping, appurtenances in repair so
 steam does not obscure vision..............
230.66 Failure to properly oversee general          1,000         2,000
 design, construction, maintenance of steam
 locomotive(s) and tender(s)................
230.67 Failure to ensure all steam                  2,500         5,000
 locomotives and tenders are properly
 inspected and repaired and/or all defects
 are properly repaired and steam locomotive
 and/or tender are in good condition, safe
 and suitable for service before being
 returned to service........................
230.68 Failure to equip steam locomotive            1,000         1,500
 that operates in excess of 20 miles per
 hour over the general system with speed
 indicator maintained to ensure accurate
 functioning................................
230.69 Failure to equip steam locomotive            1,000         2,000
 with properly supported ash pan with
 operating mechanism that may be safely
 operated and securely closed...............
230.70 Safe condition:
    (a) Failure to perform proper pre-              1,000         2,000
     departure inspection when so required..
    (b) Failure to properly equip steam             1,000         2,000
     locomotive with brake pipe valve
     clearly identified as ``Emergency Brake
     Valve''................................
230.71 Orifice testing of air compressors:..
    (a)(b):
        Failure to properly test and/or             1,000         2,000
         maintain air compressor(s) capacity
230.72 Testing main reservoirs:
    (a) Failure to properly test main               1,000         2,000
     reservoir(s) when required.............
    (b) Impermissibly or improperly drilling        1,000         2,000
     main reservoir.........................

[[Page 380]]


    (c) Impermissibly using NDE method to           1,000         2,000
     measure wall thickness of main
     reservoir..............................
    (d) Failure to use appropriate method of        1,500         3,000
     NDE testing of wall thickness of welded
     or riveted longitudinal lap seam main
     reservoir(s); failure to withdraw main
     reservoir(s) from service when testing
     reveals insufficient wall thickness....
230.73 Air gauges:
    (a) Failure to equip steam locomotive           1,000         1,500
     with properly located air gauge(s) that
     are no more than 3 psi in error........
    (b) Failure to test air gauge(s) when so        1,000         1,500
     required...............................
    (c) Failure to properly test air                1,000         1,500
     gauge(s)...............................
230.74 Failure to properly clean and/or test        1,000         1,500
 all air brake valves, related dirt
 collectors, filters when required to do so.
230.75 Failure to properly stencil or               1,000         1,500
 display date of testing and cleaning and
 initials of shop or station performing work
230.76 Piston travel:
    (a) Insufficient minimum piston travel..        1,000         1,500
    (b) Excessive piston travel when steam          1,000         2,000
     locomotive is stationary...............
230.77 Foundation brake gear:
    (a) Failure to properly maintain                1,000         2,000
     foundation brake gear..................
    (b) Foundation brake gear less than 2.5         1,000         2,000
     inches above rail......................
230.78 Leakage:
    (a):
        (1) Failure to test for leakage from        1,000         1,500
         main reservoir or related piping as
         required...........................
        (2) Failure to repair excessive             1,000         2,000
         leakage from main reservoir or
         related piping leakage.............
    (b) Failure to test for brake cylinder          1,000         1,500
     as required............................
    (c):
        (1) Failure to test for leakage from        1,000         2,000
         steam locomotive brake pipe as
         required...........................
        (2) Failure to repair excessive             1,000         2,000
         brake pipe leakage.................
230.79 Train signal system:
        (1) Failure to test the train signal        1,000         1,500
         system or other form of on-board
         communication as required..........
        (2) Failure to repair train signal          1,000         1,500
         system or other on-board
         communication when not safe or
         suitable for service...............
230.80 Cabs:
    (a) Steam locomotive cab not safe and           1,000         2,000
     suitable for service...................
    (b) Steam pipes: Construction,                  1,000         2,000
     attachment.............................
    (c) Oil-burning steam locomotive, cab-          1,000         1,500
     enclosed...............................
230.81 Cab aprons:
    (a) Cab apron, general provisions.......        1,000         1,500
    (b) Cab apron, insufficient width.......        1,000         1,500
230.82 Fire doors:
    (a) Safe and suitable for service,              1,000         2,000
     general provisions.....................
    (b) Construction and maintenance of             1,000         2,000
     mechanically operated fire doors.......
    (c) Construction and maintenance of hand-       1,000         2,000
     operated fire doors....................
230.83 Cylinder cocks:
        (1) Failure to properly equip with          1,000         1,500
         cylinder cocks.....................
        (2) Failure to properly maintain            1,000         1,500
         cylinder cocks.....................
230.84 Sanders:
        (1) Inoperable sanders..............        1,000         1,500
        (2) Failure to test sanders.........        1,000         1,500
230.85 Audible warning devices:
    (a) General provisions..................        1,000         1,500
    (b) Sound level measurements, Failure to        1,000         1,500
     properly take..........................
230.86 Required illumination:
    (a) General provisions..................        1,000         1,500
    (b) Dimming device, Failure to properly         1,000         1,500
     equip with.............................
    (c) Multiple locomotives, Failure of            1,000         1,500
     lead locomotive to display headlight...
230.87 Cab lights: Failure to properly equip        1,000         2,000
 with.......................................
230.88 Throttles: Failure to properly               1,000         2,000
 maintain, equip............................
230.89 Reverse gear:
    (a) General provisions..................        1,000         2,000
    (b) Air-operated power reverse gear.....        1,000         2,000
    (c) Power reverse gear reservoirs.......        1,000         2,000
230.90 Draw gear and draft systems:
    (a) Maintenance and testing.............        1,000         1,500
    (b) Safety bars and chains, general.....        1,000         1,500
    (c) Safety bars and chains, minimum             1,000         1,500
     length.................................
    (d) Lost motion between steam locomotive        1,000         1,500
     and tender.............................
    (e) Spring buffers: Improper                    1,000         1,500
     application, compression...............
230.91 Chafing irons: Improper application,         1,000         1,500
 maintenance................................
230.92 Draw gear, draft systems: Improperly         1,000         1,500
 maintained, fastened.......................
230.93 Pistons and piston rods:
    (a) Failure to properly inspect,                1,000         2,000
     maintain, renew........................
    (b) Fasteners: Failure to keep tight,           1,000         2,000
     properly equip.........................

[[Page 381]]


230.94 Crossheads: Improperly maintained,           1,000         2,000
 excess clearance...........................
230.95 Guides: Failure to securely fasten,          1,000         2,000
 properly maintain..........................
230.96 Main, side, valve motion rods:
    (a) General.............................        1,000         2,000
    (b) Repairs.............................
        (1) Failure to make in accordance           1,000         2,000
         with accepted national standard....
        (2) Failure to submit written               1,000         2,000
         request for approval prior to
         welding............................
        (c) Bearings and bushings...........        1,000         1,500
    (d) Rod side motion: Excessive motion...        1,000         1,500
    (e) Oil, grease cups: Failure to                1,000         1,500
     securely fasten, properly equip........
    (f) Main rod bearings:
        (1) excessive bore..................        1,000         1,500
        (2) excessive lost motion...........        1,000         1,500
    (g) Side rod bearings, excessive bore...        1,000         1,500
230.97 Crank pins:
    (a) General provisions..................        1,000         2,000
    (b) Maintenance: Failure to maintain in         1,000         2,000
     safe, suitable condition...............
230.98 Driving, trailing, engine truck
 axles:
    (a) Condemning defects..................        1,000         2,000
    (b) Journal diameter: Failure to stamp            750         1,000
     on end of axle.........................
230.99 Tender truck axle: Insufficient              1,000         2,000
 diameter...................................
230.100 Defects in tender truck axles and
 journals:
    (a) Tender truck axle condemning defects        1,000         2,000
    (b) Tender truck journal condemning             1,000         2,000
     defects................................
230.101 Steam locomotive driving journal
 boxes:
    (a) Driving journal boxes: Failure to           1,000         2,000
     properly maintain......................
    (b) Broken bearings: Failure to renew...        1,000         2,000
    (c) Loose bearings: Failure to repair or        1,000         2,000
     renew..................................
230.102 Tender plain bearing journal boxes:         1,000         1,500
 Failure to repair..........................
230.103 Tender roller bearing journal boxes:        1,000         1,500
 Failure to properly maintain...............
230.104 Driving box shoes and wedges:               1,000         1,500
 Failure to properly maintain...............
230.105 Lateral motion:
    (a) Condemning limits: Total lateral            1,000         1,500
     motion in excess of....................
    (b) Limits exceeded, failure to                 1,000         1,500
     demonstrate conditions require
     additional lateral motion..............
    (c) Interferes with other parts of steam        1,000         1,500
     locomotive.............................
230.106 Steam locomotive frame:
    (a) Failure to properly inspect and/or          1,000         2,000
     maintain...............................
    (b) Broken frames, not properly patched         2,500         5,000
     or secured.............................
230.107 Tender frame and body:
    (a) Failure to properly maintain........        1,000         1,500
    (b) Height difference between tender            1,000         1,500
     deck and steam locomotive cab floor or
     deck excessive.........................
    (c) Gangway minimum width excessive.....        1,000         1,500
    (d) Tender frame condemning defects.....        1,500         3,000
230.108 Steam locomotive leading and
 trailing trucks:
    (a) Failure to properly maintain........        1,000         1,500
    (b) Safety chain, suitable safety chain         1,000         1,500
     not provided...........................
    (c) Insufficient truck clearance........        1,000         2,000
230.109 Tender trucks:
    (a):
        (1) Tender truck frames.............        1,000         2,000
        (2) Tender truck center plate.......        1,000         2,000
    (b) Tender truck bolsters: Failure to           1,500         3,000
     properly maintain......................
    (c) Condemning defects, springs and/or          1,000         2,000
     spring rigging.........................
    (d) Truck securing arrangement: Not             1,000         1,500
     properly maintained....................
    (e) Side bearings, truck centering              1,000         2,000
     devices................................
    (f) Friction side bearings: Run in              1,000         2,000
     contact................................
    (g):
        (1) Side bearings, failure to equip         1,000         2,000
         rear trucks with...................
        (2) Insufficient clearance of.......        1,000         2,000
230.110 Pilots:
    (a) General provisions..................        1,000         1,500
    (b) Clearance, insufficient or excessive        1,000         1,500
230.111 Spring rigging:
    (a) Arrangement of springs and                  1,000         2,000
     equalizers.............................
    (b) Spring or spring rigging condemning         1,000         2,000
     defects................................
230.112 Wheels and tires:
    (a) Improperly Mounted, excess variance         1,500         3,000
     in axle diameter.......................
    (b) Out of gage.........................        1,000         2,000
    (c) Flange distance variance, excessive.        1,000         2,000
    (d) Tire thickness, insufficient........        1,000         2,000
    (e) Tire width, insufficient............        1,000         2,000
230.113 Wheels and tire defects:
        (1) Failure to repair...............        1,000         2,000

[[Page 382]]


        (2) Welding on, except as otherwise         1,500         3,000
         provided for.......................
    (a) Cracks or breaks in.................        1,000         2,000
    (b) Flat spots..........................        1,000         2,000
    (c) Chipped flange......................        1,000         2,000
    (d) Broken rim..........................        1,000         2,000
    (e) Shelled-out spots...................        1,000         2,000
    (f) Seams...............................        1,000         2,000
    (g) Worn flanges, excessive wear........        1,000         2,000
    (h) Worn treads, excessive wear.........        1,000         2,000
    (i) Flange height, insufficient or              1,000         2,000
     excessive..............................
    (j) Rim thickness, insufficient.........        1,000         2,000
    (k) Wheel diameter, excessive variance..        1,000         2,000
230.114 Wheel centers:
    (a) Filling blocks and shims............        1,000         2,000
    (b) Wheel center condemning limits,             1,000         2,000
     failure to repair......................
    (c) Wheel center repairs................        1,000         2,000
    (d) Counterbalance maintenance..........        1,000         2,000
230.115 Feed water tanks:
    (a) General provisions..................        1,000         2,000
    (b) Inspection frequency, failure to            1,000         1,500
     inspect as required....................
    (c) Top of tender: Improperly maintained        1,000         1,500
     and/or equipped........................
230.116 Oil tanks:
        (1) Failure to properly maintain....        2,500         5,000
        (2) Failure to equip with complying         5,000         7,500
         safety cut-off device..............
------------------------------------------------------------------------
\1\ Failure to observe any condition for movement set forth in Sec.
  230.12 will deprive the railroad of the benefit of the movement-for-
  repair provision and make the railroad and any responsible individuals
  liable for penalty under the particular regulatory section(s)
  concerning the substantive defect(s) present on the locomotive at the
  time of movement. Failure to comply with Sec.  230.12 will result in
  the lapse of any affected waiver.