[Code of Federal Regulations] [Title 14, Volume 2] [Revised as of January 1, 2008] From the U.S. Government Printing Office via GPO Access [CITE: 14CFR135.417] [Page 1149] TITLE 14--AERONAUTICS AND SPACE CHAPTER I--FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PART 135_OPERATING REQUIREMENTS: COMMUTER AND ON DEMAND OPERATIONS AND RULES Subpart J_Maintenance, Preventive Maintenance, and Alterations Sec. 135.417 Mechanical interruption summary report. Each certificate holder shall mail or deliver, before the end of the 10th day of the following month, a summary report of the following occurrences in multiengine aircraft for the preceding month to the certificate-holding district office: (a) Each interruption to a flight, unscheduled change of aircraft en route, or unscheduled stop or diversion from a route, caused by known or suspected mechanical difficulties or malfunctions that are not required to be reported under Sec. 135.415. (b) The number of propeller featherings in flight, listed by type of propeller and engine and aircraft on which it was installed. Propeller featherings for training, demonstration, or flight check purposes need not be reported. [Doc. No. 16097, 43 FR 46783, Oct. 10, 1978, as amended by Amdt. 135-60, 61 FR 2616, Jan. 26, 1996]