Tulsa District Library Document Information |
Project Name: | John Redmond Feasibility Study |
Document Name: | REVIEW PLAN - JOHN REDMOND DAM AND RESERVOIR, KANSAS, INTERIM FEASIBILITY STUDY |
Information: |
The purpose of the study is to identify the best options for providing, aquatic ecosystem restoration, water quality improvements, water supply conservation and improvement, and other related water resources needs within the study area. The decision document will be an interim feasibility report. At this time, the National Environmental Policy Act process is expected to result in an Environmental Assessment, not an Environmental Impact Statement. Purpose of Review Plan. This review plan outlines the level of review needed for the study, the timing of reviews, and the qualifications of the reviewers. The approved review plan will be included as a component of the Project Management Plan.
|
Web Link: | |
Document Date: | November 2008 |
Author | U.S. ARMY CORPS OF ENGINEERS, TULSA DISTRICT |
Added to the Library | December 15, 2008 |
Electronic Size: | 284 Kb |
Document Format: |