[Federal Register: October 22, 2004 (Volume 69, Number 204)]
[Notices]               
[Page 62042-62043]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr22oc04-47]                         

=======================================================================
-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6656-8]

 
Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.


Weekly receipt of Environmental Impact Statements filed October 11, 
2004, through October 15, 2004, pursuant to 40 CFR 1506.9.

EIS No. 040486, Final Supplement, BLM, NV, Clark County Regional Flood 
Control Master Plan, Updated and Replaced the Original 1991 FEIS, 
Facilities Construction and Operation, Right-of-Way Approval and U.S. 
Army COE Section 404 Permit, Clark County, NV, Wait Period Ends: 
November 22, 2004, Contact: Adrian Garcia (702) 515-5089.
EIS No. 040487, Final EIS, AFS, OR, Crooked River National Grassland 
Vegetation Management/Grazing, Vegetation Treatments and Grazing 
Disposition, Ochoco National Forest, Jefferson County, OR, Wait Period 
Ends: November 22, 2004, Contact: Steve Gibson (541) 416-6440. This 
document is available on the Internet at: http://www.fs.fed.us/r6/centraloregon
.

EIS No. 040488, Final EIS, EPA, RI, MA, Rhode Island Region Long-Term 
Dredged Material Disposal Site Evaluation Project, Designation of One 
or More Long-Term Ocean Disposal Sites, RI and MA, Wait Period Ends: 
November 22, 2004, Contact: Olga Guza (617) 918-1542.
EIS No. 040489, Final EIS, COE, FL, Central and Southern Florida 
Project, Comprehensive Everglades Restoration Plan, Aquifer Storage and 
Recovery (ASR) Pilot Operation, Aquifer Storage and Recovery Pilot 
Project, To Test the Feasibility Utilizing ASR Technology for Water 
Storage at Seven Well Sites, Right-of-Way and NPDES Permits, Several 
Counties, Wait Period Ends: November 22, 2004, Contact: Rebecca Weiss 
(904) 232-1577.
EIS No. 040490, Final EIS, FRC, WA, ID, Box Canyon Hydroelectric 
Project, (FERC Project No. 2042-013), New License Application for an 
existing 72-megawatt (Mw) Hydroelectric Project, Public Utility 
District (PUD) No. 1, Pend Oreille River, Pend Oreille County, WA and 
Bonner County, ID, Wait Period Ends: November 22, 2004, Contact: Jon 
Cofrancesco (202) 502-8951.
EIS No. 040491, Draft EIS, NIH, MA, National Emerging Infectious 
Diseases Laboratories, Construction of a National Biocontainment 
Laboratory, BioSquare Research Park, Boston University Medical Center 
Campus, Boston, MA, Comment Period Ends: January 3, 2005, Contact: 
Valerie Nottingham (301) 480-8056.
EIS No. 040492, Final EIS, NPS, MI, Pictured Rocks National Lakeshore, 
General Management Plan and Wilderness Study, Implementation, Lake 
Superior, Munising and Grand Marais, Alger County, MI, Wait Period 
Ends: November 22, 2004, Contact: Karen Gustin (906) 387-2607.
EIS No. 040493, Draft Supplement, STB, MT, Tongue River Railroad 
Construction and Operation of the Proposed Western Alignment Tongue 
River III Southernmost Portion of the 41-mile Ashland to Decker 
Alignment, Rosebud and Bighorn Counties, MT, Comment Period Ends: 
December 06, 2004, Contact: Kenneth Blodgett (202) 565-1554.
EIS No. 040494, Final EIS, FAA, IN, Gary/Chicago International Airport 
Master Plan Development Including Runway Safety Area Enhancement/
Extension of Runway 12-30, Funding, Lake County, IN, Wait Period Ends: 
November 22, 2004, Contact: Prescott C. Snyder (847) 294-7538.

Amended Notices

EIS No. 040204, Draft EIS, FHW, NJ, Cross Harbor Freight Movement 
Project, Improve the Movements of Goods Throughout Northern New Jersey 
and Southern New York, Funding, Kings, Richmond, Queens, New York 
Counties, NJ, Comment Period: November 30, 2004, Contact: Richard 
Backlund (212) 668-2205. Published FR-05-07-04 Review Period Reopened, 
From 09-30-2004 to 11-30-2004.
EIS No. 040322, Draft EIS, BLM, CA, Clear Creek Resource Management 
Area Plan Amendment, Hollister Resource Management Plan, Implement the 
Decision Made in the 1999 CCMA ROD, San Benito and Fresno Counties, CA, 
Comment Period Ends: November 15, 2004, Contact: Robert Beehler (831) 
630-

[[Page 62043]]

5000. Revision of Federal Register notice published on 7/16/2004: CEQ 
Comment Period ending on 10/15/2004 has been extended to 11/15/2004.
EIS No. 040338, Draft EIS, BLM, UT, Price Field Office Resource 
Management Plan, Implementation, Proposed Areas of Critical 
Environmental Concerns Suitable Wild and Scenic River Segments and 
Special Recreation Management Area, Carbon and Emery Counties, UT, 
Comment Period Ends: November 29, 2004, Contact: Floyd Johnson (435) 
636-3600. Revision of Federal Register notice published on 7/23/04: CEQ 
Comment Period ending 10/15/2004 has been extended to 11/29/2004.
EIS No. 040463, Final EIS, COE, MS, IA, MO, IL, MN, WI, Programmatic 
EIS--Upper Mississippi River and Illinois Waterway System Navigation 
Feasibility Study (UMR-IWW), Addressing Navigation Improvement Planning 
and Ecological Restoration Needs, MS, IL, IA, MN, MO, WI, Wait Period 
Ends: November 12, 2004, Contact: Denny Lunderberg (309) 794-5632. 
Revision of Federal Register notice published on 10/08/2004: CEQ 
Comment Period ending 11/08/2004 corrected 11/12/2004.
EIS No. 040465, Draft EIS, NPS, AZ, Colorado River Management Plan, To 
Provide a Wilderness-Type River Experience for Visitors, General 
Management Plan, Grand Canyon National Park, Colorado River, Coconino 
County, AZ, Comment Period Ends: January 6, 2005, Contact: Rick 
Ernenwein (928) 779-6279. Revision of Federal Register notice published 
on 10/8/2004: CEQ Comment Period ending 01/06/2004 corrected to 01/06/
2005.

    Dated: October 19, 2004.
Ken Mittelholtz,
Environmental Protection Specialist, Office of Federal Activities.
[FR Doc. 04-23690 Filed 10-21-04; 8:45 am]

BILLING CODE 6560-50-P