[Federal Register: April 18, 2001 (Volume 66, Number 75)]
[Notices]               
[Page 19925-19926]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr18ap01-46]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Docket Nos. FE C&E 01-52, C&E 01-53, C&E 01-54, C&E 01-55, C&E 01-56, 
C&E 01-57, and C&E 01-58 Certification Notice--198]

 
Office of Fossil Energy; Notice of Filings of Coal Capability of 
GenPower Earley LLC, et al.; Powerplant and Industrial Fuel Use Act

AGENCY: Office of Fossil Energy, Department of Energy.

ACTION: Notice of filing.

-----------------------------------------------------------------------

SUMMARY: GenPower Earley LLC, Oglethorpe Power Corporation, Columbia 
Energy LLC, GenPower Anderson LLC, Attala Generating Company, LLC, 
Harquahala Generating Company, LLC, and CPV Gulfcoast, Ltd. submitted 
coal capability self-certifications pursuant to section 201 of the 
Powerplant and Industrial Fuel Use Act of 1978, as amended.

ADDRESSES: Copies of self-certification filings are available for 
public inspection, upon request, in the Office of Coal & Power Im/Ex, 
Fossil Energy, Room 4G-039, FE-27, Forrestal Building, 1000 
Independence Avenue, SW., Washington, D.C. 20585.

FOR FURTHER INFORMATION CONTACT: Ellen Russell at (202) 586-9624.

SUPPLEMENTARY INFORMATION: Title II of the Powerplant and Industrial 
Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8301 et seq.), 
provides that no new baseload electric powerplant may

[[Page 19926]]

be constructed or operated without the capability to use coal or 
another alternate fuel as a primary energy source. In order to meet the 
requirement of coal capability, the owner or operator of such 
facilities proposing to use natural gas or petroleum as its primary 
energy source shall certify, pursuant to FUA section 201(d), to the 
Secretary of Energy prior to construction, or prior to operation as a 
base load powerplant, that such powerplant has the capability to use 
coal or another alternate fuel. Such certification establishes 
compliance with section 201(a) as of the date filed with the Department 
of Energy. The Secretary is required to publish a notice in the Federal 
Register that a certification has been filed. The following owners/
operators of the proposed new baseload powerplants have filed a self-
certification in accordance with section 201(d).

    Owner: GenPower Earleys, LLC (C&E 01-52).
    Operator: General Electric International, Inc.
    Location: Hertford County, North Carolina.
    Plant Configuration: Combined-cycle.
    Capacity: 640 MW.
    Fuel: Natural gas.
    Purchasing Entities: Wholesale power market.
    In-Service Date: October, 2003.

    Owner: Oglethorpe Power Corporation (C&E 01-53).
    Operator: Oglethorpe Power Corporation.
    Location: Franklin, Georgia.
    Plant Configuration: Combined-cycle.
    Capacity: 520 MW.
    Fuel: Natural gas.
    Purchasing Entities: Oglethorpe Power Corporation's Electric 
Membership.
    In-Service Date: March 1, 2003.

    Owner: Columbia Energy LLC (C&E 01-54).
    Operator: Calpine Eastern Inc.
    Location: Calhoun County, South Carolina.
    Plant Configuration: Combined-cycle.
    Capacity: 600 MW.
    Fuel: Natural gas.
    Purchasing Entities: Wholesale electric market.
    In-Service Date: June 1, 2003.

    Owner: GenPower Andrson, LLC (C&E 01-55).
    Operator: General Electric International, Inc.
    Location: Anderson, South Carolina.
    Plant Configuration: Combined-cycle.
    Capacity: 640 MW.
    Fuel: Natural gas.
    Purchasing Entities: Wholesale power market.
    In-Service Date: December, 2002.

    Owner: Attala Generating Company, LLC (C&E 01-56).
    Operator: Attala Generating Company, LLC.
    Location: Attala County, Mississippi.
    Plant Configuration: Combined-cycle.
    Capacity: 500 MW.
    Fuel: Natural gas.
    Purchasing Entities: Wholesale power market.
    In-Service Date: 2001.

    Owner: Harquahala Generating Company, LLC (C&E 01-57).
    Operator: Harquahala Generating Company, LLC.
    Location: Maricopah County, Arizona.
    Plant Configuration: Combined-cycle.
    Capacity: 1050 MW.
    Fuel: Natural gas.
    Purchasing Entities: Wholesale power market.
    In-Service Date: 2003.

    Owner: CPV Gulfcoast, Ltd. (C&E 01-58).
    Operator: CPV Gulfcoast, Ltd.
    Location: Manatee County, Florida.
    Plant Configuration: Combined-cycle.
    Capacity: 250 MW.
    Fuel: Natural gas.
    Purchasing Entities: Florida wholesale power market.
    In-Service Date: June 2003.

    Issued in Washington, DC., April 12, 2001.
Anthony J. Como,
Deputy Director, Electric Power Regulation, Office of Coal & Power Im/
Ex, Office of Coal & Power Systems, Office of Fossil Energy.
[FR Doc. 01-9609 Filed 4-17-01; 8:45 am]
BILLING CODE 6450-01-U