[Federal Register: January 16, 2001 (Volume 66, Number 10)]
[Notices]               
[Page 3576]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr16ja01-58]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. RP-20-000]

 
Texas Eastern Transmission Corporation; Notice of Proposed 
Changes in FERC Gas Tariff

January 9, 2001.
    Take notice that on December 29, 2000 Texas Eastern Transmission 
Corporation (Texas Eastern) tendered for filing as part of its FERC Gas 
Tariff, Sixth Revised Volume No. 1 and Original Volume No. 2, revised 
tariff sheets listed on Appendix A to the filing to become effective 
February 1, 2001.
    Texas Eastern states that these revised tariff sheets are filed 
pursuant to Section 15.1, Electric Power Cost (EPC) Adjustment, of the 
General Terms and Conditions of Texas Eastern's FERC Gas Tariff, Sixth 
Revised Volume No. 1.
    Texas Eastern states that Section 15.1 provides that Texas Eastern 
shall file to be effective each February 1 revised rates for each 
applicable zone and rate schedule based upon the projected annual 
electric power costs required for the operation of transmission 
compressor stations with electric motor prime movers and to also 
reflect the EPC Surcharge which is designed to clear the balance in the 
Deferred EPC Account.
    Texas Eastern states that the rate changes proposed to the primary 
firm capacity reservation charges, usage rates and 10% load factor 
average costs for full Access Area Boundary service from the Access 
Area Zone, East Louisiana, to the three market area zones are as 
follows:

----------------------------------------------------------------------------------------------------------------
                Zone                        Reservation                  Usage                   100%  LF
----------------------------------------------------------------------------------------------------------------
Market 1...........................  $0.017/dth..............  $.0001/dth..............  $.0007/dth.
Market 2...........................  $0.051/dth..............  $.0002/dth..............  $.0019/dth.
Market 3...........................  $0.074/dth..............  $.0002/dth..............  $.0026/dth.
----------------------------------------------------------------------------------------------------------------

    Texas Eastern states that copies of its filing have been mailed to 
all affected customers and interested state commissions.
    Any person desiring to be heard or to protest said filing should 
file a motion to intervene or a protest with the Federal Energy 
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in 
accordance with Sections 385.214 or 385.211 of the Commission's Rules 
and Regulations. All such motions or protests must be filed in 
accordance with Section 154.210 of the Commission's Regulations. 
Protests will be considered by the Commission in determining the 
appropriate action to be taken, but will not serve to make protestants 
parties to the proceedings. Any person wishing to become a party must 
file a motion to intervene. Copies of this filing are on file with with 
Commission and are available for public inspection in the Public 
Reference Room. This filing may be viewed on the web at http://
www.ferc.fed.us/online/rims.htm (call 202-208-2222 for assistance). 
Comments and protests may be filed electronically via the internet in 
lieu of paper. See, 18 CFR 385.2001(a)(1)(ii) and the instructions on 
the Commission's web site at http://www.ferc.fed.us/efi/doorbell.htm.

David P. Boergers,
Secretary.
[FR Doc. 01-1141 Filed 1-12-01; 8:45 am]
BILLING CODE 6717-01-M