[Federal Register: March 21, 2001 (Volume 66, Number 55)]
[Notices]               
[Page 15855-15856]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr21mr01-53]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 
Notice of Applications for Amendment of License and Soliciting 
Comments, Motions to Intervene, and Protests

March 15, 2001.
    Take notice that the following applications have been filed with 
the Commission and are available for public inspection:
    a. Application Type: Non-Project Use of Project Lands and Waters.
    b. Project No: 2210-052, -053, -054, -055, -056, -057, -058, -059, 
-060, -061, and -064.
    c. Date Filed: January 23, 2001 and February 21, 2001 (- 64).
    d. Applicant: American Electric Power (AEP).
    e. Name of Project: Smith Mountain.
    f. Location: The project is located on the Roanoke River, in 
Bedford, Pittsylvania, Franklin, and Roanoke Counties, Virginia.
    g. Filed Pursuant to: Federal Power Act, 16 USC 791(a) 825(r) and 
Secs. 799 and 801.
    h. Applicant Contact: Frank M. Simms, Fossil and Hydro Operations, 
American Electric Power, 1 Riverside Plaza, Columbus, Ohio 43215, (614) 
223-2918.
    i. FERC Contact: Any questions on this notice should be addressed 
to Mr. Brian Romanek at (202) 219-3076.
    j. Deadline for filing comments and or motions: April 20, 2001.
    All documents (original and eight copies) should be filed with: 
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
First Street, N.W., Washington DC 20426. Comments, protests and 
interventions may be filed electronically via the Internet in lieu of 
paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's web site at http://www.ferc.fed.us/efi/doorbell.htm
    Please include the specific project number (P-2210-052, -053, -054, 
-055, -056, -057, -058, -059, -060, -061, or -064) on any comments or 
motions filed. Use only the project number for which you are making 
reference.
    k. Description of Request: The following applications are filed by 
American Electric Power for the purpose of obtaining Commission 
authorization to allow the indicated uses of project lands and waters 
at the Smith Mountain Project. The described facilities are in various 
stages of development from fully to partially completed.
    P-2210-052--Bass Cove New Properties, located adjacent to the Bass

[[Page 15856]]

Cove subdivision, located east of Tom Branch Cove off Craddock Creek in 
Bedford County. As-built, the facility includes eight new covered boat 
slips added to an existing stationary dock containing 16 covered boat 
slips.
    P-2210-053--Bernard's Landing Comprehensive Property Owners 
Association facilities, located at the terminus of Route 616 peninsula 
accessing both the Roanoke and Blackwater Rivers in Franklin County. 
As-built, the facilities include three new adjacent boathouses with a 
total of twenty boat slips.
    P-2210-054--Blue Ridge Recreation Inc. facilities, located at Bay 
Roc Marina on the south side of the Roanoke River at its intersection 
with Route 634 in Franklin County. As-built, the facilities include 
nine new commercial boat slips and a walkway making a total of 80 boat 
slips at the site.
    P-2210-055--Highland Pointe Condominium Unit facilities, located on 
a small cove west of Bull Run tributary in Franklin County. As-built, 
the facilities include a 206 square foot stationary dock.
    P-2210-056--J.W. Development, Inc. facilities, located near the end 
of Craddock Creek (just north of the C-6 Channel marker) in Bedford 
County. As-built, the facilities include two new boathouses with 24 
boat slips each.
    P-2210-057--Marina Bay Condo Unit Owners (Edie Greene) facilities, 
located near the end of little Bull Run in Franklin County. As-built, 
the facilities include a new stationary dock, floating dock, and a 
gazebo.
    P-2210-058--Marina Bay Condo Unit Owners (Willard Construction 
Company) facilities, located near the end of little Bull Run in 
Franklin County. As-built, the facilities include two (2) new boat 
slips and an existing boathouse with 36 boat slips.
    P-2210-059--Ryals-Jordan Inc. facilities, located north of Walton 
Creek at its confluence with Merriman's Creek (north of the R-21 
channel maker) in Bedford County. As-built, the facilities include a 
new addition to an existing commercial dock that serves the Virginia 
Dare dinner boat.
    P-2210-060--Webster Marine Center, Inc. facilities, located on the 
Roanoke River northeast of its intersection with Route 122 (Hales Ford 
Bridge) in Bedford County. As-built, the facilities include three new 
boat slips added to an existing complex of 41 boat slips.
    P-2210-061--Westlake Properties facilities, located on the south 
side of Indian Creek, east of the Roanoke River in Franklin County. As-
built, the facilities include seven sets of docks with six boat slips 
and two floating docks, one set of four boat slips, and two additional 
floating docks, one with 46 boat slips and the other with 16 slips.
    P-2210-064--Mariner's Landing at the 6th Fairway (J.W. Holdings) 
located on a small cove off of Craddock Creek in Bedford County. As-
built, the facilities include a covered stationary boathouse with 8 
boat slips.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room, located at 888 First Street, NE, Room 2A, Washington, 
D.C. 20426, or by calling 202) 208-1371. This filing may be viewed on 
http://www.ferc.fed.us/online/rims.htm (call (202) 208-2222 for 
assistance). A copy is also available for inspection and reproduction 
at the address in item (h) above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    n. Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFS 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    o. Filing and Service of Responsive Documents--Any filings must 
bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
FOR TERMS AND CONDITIONS'', ``PROTEST'', or ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. A copy of any motion to intervene must also be 
served upon each representative of the Applicant specified in the 
particular application.
    p. Agency comments--Federal, state, and local agencies are invited 
to file comments on the described application. A copy of the 
application may be obtained by agencies directly from the Applicant. If 
an agency does not file comments within the time specified for filing 
comments, it will be presumed to have no comments. One copy of an 
agency's comments must also be sent to the Applicant's representatives.

David P. Boergers,
Secretary.
[FR Doc. 01-6957 Filed 3-20-01; 8:45 am]
BILLING CODE 6717-01-M