[Federal Register: February 21, 2001 (Volume 66, Number 35)]
[Notices]               
[Page 11009-11010]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr21fe01-45]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

[Docket Nos. FE C&E 01-44, C&E 01-45, C&E 01-46 and C&E 01-47 and 
Certification Notice-196]

 
Office of Fossil Energy; Notice of Filings of Coal Capability of 
Wise County Power Company, LLC, Panda Gila River, LP, CPV Atlantic, 
Ltd, Partnership and Baytown Energy Center, LP Parntership Powerplant 
and Industrial Fuel Use Act

AGENCY: Office of Fossil Energy, Department of Energy.

ACTION: Notice of filing.

-----------------------------------------------------------------------

SUMMARY: Wise County Power Company, LLC, Panda Gila River, LP, CPV 
Atlantic, Ltd, Partnership, and Baytown Energy Center, LP, Partnership 
submitted coal capability self-certifications pursuant to section 201 
of the Powerplant and Industrial Fuel Use Act of 1978, as amended.

ADDRESSES: Copies of self-certification filings are available for 
public inspection, upon request, in the Office of Coal & Power Im/Ex, 
Fossil Energy, Room 4G-039, FE-27, Forrestal Building, 1000 
Independence Avenue, SW., Washington, DC 20585.

FOR FURTHER INFORMATION CONTACT: Ellen Russell at (202) 586-9624.

SUPPLEMENTARY INFORMATION: Title II of the Powerplant and Industrial 
Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8301 et seq.), 
provides that no new baseload electric powerplant may be constructed or 
operated without the capability to use coal or another alternate fuel 
as a primary energy source. In order to meet the requirement of coal 
capability, the owner or operator of such facilities proposing to use 
natural gas or petroleum as its primary energy source shall certify, 
pursuant to FUA section 201(d), to the Secretary of Energy prior to 
construction, or prior to operation as a base load powerplant, that 
such powerplant has the capability to use coal or another alternate 
fuel. Such certification establishes compliance with section 201(a) as 
of the date filed with the Department of Energy. The Secretary is 
required to publish a notice in the Federal Register that a 
certification has been filed. The following owners/operators of the 
proposed new baseload powerplants have filed a self-certification in 
acccordance with section 201(d).
    Owner: Wise County Power Company, LLC (C&E 01-44).
    Operator: Wise County Power Company, LLC.
    Location: Wise County, Texas.
    Plant Configuration: Combined-cycle.
    Capacity: 700 MW.
    Fuel: Natural gas.
    Purchasing Entities: Electric Reliability Council of Texas (ERCOT).
    In-service Date: January 1, 2003.
    Owner: Panda Gila River, L.P.(C&E 01-45).
    Operator: Panda Gila River, L.P.
    Location: Gila Bend, Arizona.
    Plant Configuration: Combined-cycle.
    Capacity: 2300 MW.
    Fuel: Natural gas.
    Purchasing Entities: To be determined.
    In-service Date: March 2003.
    Owner: CPV Atlantic, Ltd (C&E 01-46).
    Operator: CPV Atlantic, Ltd.
    Location: St. Lucie County, Florida.
    Plant Configuration: Combined-cycle.
    Capacity: 250 MW.

[[Page 11010]]

    Fuel: Natural gas.
    Purchasing Entities: Sold into Florida's wholesale power market.
    In-service Date: 4th quarter of 2003 or the 1st quarter of 2004.
    Owner: Baytown Energy Center, LP (C&E 01-47).
    Operator: Calpine Central, L.P.
    Location: Chambers County, Texas.
    Plant Configuration: Combined-cycle.
    Capacity: 722 MW.
    Fuel: Natural gas.
    Purchasing Entities: 290 MW-340 MW to Bayer; excess sold into the 
ERCOT wholesale market.
    In-service Date: January 2004.

    Issued in Washington, D.C., February 13, 2001.
Anthony J. Como,
Deputy Director, Electric Power Regulation, Office of Coal & Power Im/
Ex, Office of Coal & Power Systems, Office of Fossil Energy.
[FR Doc. 01-4237 Filed 2-20-01; 8:45 am]
BILLING CODE 6450-01-P