[Federal Register: January 10, 2001 (Volume 66, Number 7)]
[Notices]               
[Page 1974-1975]
From the Federal Register Online via GPO Access [wais.access.gpo.gov]
[DOCID:fr10ja01-86]                         

-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 
Notice of Petition for Declaratory Order and Soliciting Comments, 
Motions To Intervene, and Protests

January 4, 2001.
    Take notice that the following application has been filed with the 
Commission and is available for public inspection:
    a. Application Type: Petition for Declaratory Order.
    b. Docket No.: D101-3-000.
    c. Date Filed: December 21, 2000.
    d. Applicant: R. Kim and Else R. Ireland.
    e. Name of Project: Ireland Hydroelectric Project.
    f. Location: On an Unnamed Stream (Wolf-Hannaman random ditch), 
tributary to the Bear River, Nevada County, California. (T. 14 N., R. 7 
E, Mount Diablo Meridian). Project would not utilize federal lands or 
reservations.
    g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 
U.S.C. Secs. 817(b).
    h. Applicant Contact: R. Kim and Else R. Ireland, 25855 Sweet Road, 
Grass Valley, California 95949, telephone (530) 268-2689, (530) 268-
1364 (FAX), E-mail kimireland@bigplanet.com.
    i. FERC Contact: Any questions on this notice should be addressed 
to Diane M. Murray at (202) 219-2682, or E-mail address: 
diane.murray@ferc.fed.us.
    j. Deadline for filing comments and/or motions: February 12, 2001.
    All documents (original and eight copies) should be filed with: 
David P. Boergers, Secretary, Federal Energy Regulatory Commission, 888 
First street, NE., Washington, DC 20426. Comments

[[Page 1975]]

and protests may be filed electronically via the Internet in lieu of 
paper. See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the 
Commission's web site at http://www.ferc.fed.us/efi/doorbell.htm.
    Please include the docket number (DI01-3-000) on any comments or 
motions filed.
    k. Description of Project: The existing project consists of: (1) A 
four-foot-wide by 5-foot-long diversion structure; (2) a 400-foot-long 
penstock; (3) a powerhouse containing one generating unit, with a total 
rated capacity of 17 kW; and (4) appurtenant facilities.
    When a Petition for Declaratory Order is filed with the Federal 
Energy Regulatory Commission, the Federal Power Act requires the 
Commission to investigate and determine if the interests of interstate 
or foreign commerce would be affected by the project. The Commission 
also determines whether or not the project: (1) Would be located on a 
navigable waterway; (2) would occupy or affect public lands or 
reservations of the United States; (3) would utilize surplus water or 
water power from a government dam; or (4) if applicable, has involved 
or would involve any construction subsequent to 1935 that may have 
increased or would increase the project's head or generating capacity, 
or have otherwise significantly modified the project's pre-1935 design 
or operation.
    l. Locations of the Application: A copy of the application is 
available for inspection and reproduction at the Commission's Public 
Reference Room located at 888 First Street, NE., Room 2A, Washington, 
DC 20426, or by calling (202) 208-1371. This filing may be viewed on 
http://www.ferc.fed.us/online/rims.htm (call (202) 208-2222 for 
assistance). A copy is also available for inspection and reproduction 
at the address in item h. above.
    m. Individuals desiring to be included on the Commission's mailing 
list should so indicate by writing to the Secretary of the Commission.
    Comments, Protests, or Motions to Intervene--Anyone may submit 
comments, a protest, or a motion to intervene in accordance with the 
requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
.214. In determining the appropriate action to take, the Commission 
will consider all protests or other comments filed, but only those who 
file a motion to intervene in accordance with the Commission's Rules 
may become a party to the proceeding. Any comments, protests, or 
motions to intervene must be received on or before the specified 
comment date for the particular application.
    Filing and Service of Responsive Documents--Any filings must bear 
in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS FOR 
TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as 
applicable, and the Project Number of the particular application to 
which the filing refers. Any of the above-named documents must be filed 
by providing the original and the number of copies provided by the 
Commission's regulations to: The Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426. A copy of any 
motion to intervene must also be served upon each representative of the 
Applicant specified in the particular application.
    Agency Comments--Federal, state, and local agencies are invited to 
file comments on the described application. A copy of the application 
may be obtained by agencies directly from the Applicant. If an agency 
does not file comments within the time specified for filing comments, 
it will be presumed to have no comments. One copy of an agency's 
comments must also be sent to the Applicant's representatives.

David P. Boergers,
Secretary.
[FR Doc. 01-641 Filed 1-9-01; 8:45 am]
BILLING CODE 6717-01-M