Title 10--Energy

CHAPTER II--DEPARTMENT OF ENERGY

PART 503--NEW FACILITIES


TEXT PDF503.1 Purpose and scope.
TEXT PDF503.2 Prohibition.
TEXT PDF503.4 Purpose and scope.
TEXT PDF503.5 Contents of petition.
TEXT PDF503.6 Cost calculations for new powerplants and installations.
TEXT PDF503.7 State approval--general requirement for new powerplants.
TEXT PDF503.8 No alternate power supply--general requirement for certain exemptions for new powerplants.
TEXT PDF503.9 Use of mixtures--general requirement for certain permanent exemptions.
TEXT PDF503.10 Use of fluidized bed combustion not feasible--general requirement for permanent exemptions.
TEXT PDF503.11 Alternative sites--general requirement for permanent exemptions for new powerplants.
TEXT PDF503.12 Terms and conditions; compliance plans.
TEXT PDF503.13 Environmental impact analysis.
TEXT PDF503.14 Fuels search.
TEXT PDF503.20 Purpose and scope.
TEXT PDF503.21 Lack of alternate fuel supply.
TEXT PDF503.22 Site limitations.
TEXT PDF503.23 Inability to comply with applicable environmental requirements.
TEXT PDF503.24 Future use of synthetic fuels.
TEXT PDF503.25 Public interest.
TEXT PDF503.30 Purpose and scope.
TEXT PDF503.31 Lack of alternate fuel supply for the first 10 years of useful life.
TEXT PDF503.32 Lack of alternate fuel supply at a cost which does not substantially exceed the cost of using imported petroleum.
TEXT PDF503.33 Site limitations.
TEXT PDF503.34 Inability to comply with applicable environmental requirements.
TEXT PDF503.35 Inability to obtain adequate capital.
TEXT PDF503.36 State or local requirements.
TEXT PDF503.37 Cogeneration.
TEXT PDF503.38 Permanent exemption for certain fuel mixtures containing natural gas or petroleum.



---------------------------------------------------------------------

-----------

[BACK ][BACK ]