Title 40--Protection of Environment
CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
PART 75--CONTINUOUS EMISSION MONITORING
|
|
| 75.1 |
Purpose and scope. |
|
| 75.2 |
Applicability. |
|
| 75.3 |
General Acid Rain Program provisions. |
|
| 75.4 |
Compliance dates. |
|
| 75.5 |
Prohibitions. |
|
| 75.6 |
Incorporation by reference. |
|
| 75.10 |
General operating requirements. |
|
| 75.11 |
Specific provisions for monitoring SO2 emissions (SO2 and flow monitors).
|
|
| 75.12 |
Specific provisions for monitoring NOX emission rate (NOX and diluent gas monitors). |
|
| 75.13 |
Specific provisions for monitoring CO2 emissions. |
|
| 75.14 |
Specific provisions for monitoring opacity. |
|
| 75.15 |
Specific provisions for monitoring SO2 emissions removal by qualifying Phase I technology. |
|
| 75.16 |
Special provisions for monitoring emissions from common, by-pass, and multiple stacks for SO2 emissions and heat input determinations. |
|
| 75.17 |
Specific provisions for monitoring emissions from common, by-pass, and multiple stacks for NOx emission rate. |
|
| 75.18 |
Specific provisions for monitoring emissions from common and by-pass stacks for opacity. |
|
| 75.19 |
Optional SO2, NOX, and CO2 emissions calculation for low mass emissions units. |
|
| 75.20 |
Initial certification and recertification procedures. |
|
| 75.21 |
Quality assurance and quality control requirements. |
|
| 75.22 |
Reference test methods. |
|
| 75.23 |
Alternatives to standards incorporated by reference. |
|
| 75.24 |
Out-of-control periods and adjustment for system bias.
|
|
| 75.30 |
General provisions. |
|
| 75.31 |
Initial missing data procedures. |
|
| 75.32 |
Determination of monitor data availability for standard missing data procedures.
|
|
| 75.33 |
Standard missing data procedures for SO2, NOX and flow rate.
|
|
| 75.34 |
Units with add-on emission controls. |
|
| 75.35 |
Missing data procedures for CO2 data.
|
|
| 75.36 |
Missing data procedures for heat input determinations.
|
|
| 75.37 |
Missing data procedures for moisture. |
|
| 75.40 |
General demonstration requirements. |
|
| 75.41 |
Precision criteria. |
|
| 75.42 |
Reliability criteria. |
|
| 75.43 |
Accessibility criteria. |
|
| 75.44 |
Timeliness criteria. |
|
| 75.45 |
Daily quality assurance criteria. |
|
| 75.46 |
Missing data substitution criteria. |
|
| 75.47 |
Criteria for a class of affected units. |
|
| 75.48 |
Petition for an alternative monitoring system. |
|
| 75.53 |
Monitoring plan.
|
|
| 75.54 |
General recordkeeping provisions. |
|
| 75.55 |
General recordkeeping provisions for specific situations. |
|
| 75.56 |
Certification, quality assurance and quality control record provisions. |
|
| 75.57 |
General recordkeeping provisions. |
|
| 75.58 |
General recordkeeping provisions for specific situations. |
|
| 75.59 |
Certification, quality assurance, and quality control record provisions. |
|
| 75.60 |
General provisions.
|
|
| 75.61 |
Notifications.
|
|
| 75.62 |
Monitoring plan submittals. |
|
| 75.63 |
Initial certification or recertification application submittals. |
|
| 75.64 |
Quarterly reports. |
|
| 75.65 |
Opacity reports. |
|
| 75.66 |
Petitions to the Administrator.
|
|
| 75.67 |
Retired units petitions. |
|
| 75.70 |
NOX mass emissions provisions. |
|
| 75.71 |
Specific provisions for monitoring NOX emission rate and heat input for the purpose of calculating NOX mass emissions. |
|
| 75.72 |
Determination of NOX mass emissions. |
|
| 75.73 |
Recordkeeping and reporting. |
|
| 75.74 |
Annual and ozone season monitoring and reporting requirements. |
|
| 75.75 |
Additional ozone season calculation procedures for special circumstances. |