The following is a list of documents which have been completed or are planned
for the Eagle Lake Field Office in fiscal year 2003. If you need more information, please call the Project Leader at (530)257-0456.
EA # EIS # DNACX # | EA NAME | EAEIS ADCX FONSIROD SIGNED | PROJECT LOCATION | PROJ LEAD | Status of Project |
2003-01 | Swarn Singh-Road Right-of-Way Wendel area | EA 03/03/03 | T29N, R16E, Sec 32 N ½ | S. Wannebo | |
2003-02 | Turn of the Road Trailhead Modification | EA | | J. Sippel | |
2003-03 | Shrock Memorial | CX 02/24/03 | T33N, R15E, Sec 28, SW | J. Sippel | |
2003-04 | Integrated Weed Management | EA | NV Lands Portion of | C. Gibbs | |
2003-05 | Ox Road - Hog Draw Reservoir Mantenance | EA 07/31/03 | T30N, R16E, Sec 12 T30N, R17E, Sec 23 | J. Mata | |
2003-06 | Permit Renewal - Eagle Lake Basin Allotments | EA | T33N, R11E | R. Mauck | |
2003-07 | Cattle GPS Project South Horse Lake Allotments | EA 05/12/03 | T30N, R13E | R. Mauck | |
2003-08 | Vehicle Control Rock Placement – Rocky Point | DNA | T.33N., R.11E., Sec. 32 & 33 | S. Bales | |
2003-09 | Sierra Ghost Riders Wagon Trail Permit | CX 07/29/03 | T.21N.,R.17E., Section 30 | J. Sippel | |
2003-10 | Shinn Fire Rehab | EA 09/25/03 | T.32., R.15E, Section 35 | D. Manuel | |
2003-11 | Smoke Complex Fire Rehab | EA 09/25/03 | T.33N., R.17E. | S. Surian | |
2003-12 | VOID | | | | |
2003-13 | Skedaddle Fire Rehab | EA 09/25/03 | T.30N., R.16E. | C. Gibbs | |
2003-14 | Chilcoot Complex Fire Rehab | EA 09/26/03 | T.32N., R.15E., Sec. 35 | D. Armentrout | |
2003-15 | Fort Sage Fence | EA | T.25N., R.17E., | J. Sippel | |
2003-16 | Tiny Thompson B.J. Trail Bike Ride | CX 09/1903 | B.J.Trail | S. Bales | |