NEPA 2006

The following is a list of ongoing and completed projects for the Alturas Field Office. The level of analysis are:

  • CX=Categorical Exclusion-The project falls into one of several categories of minor, routine projects excluded from needing more
    analysis. Each time a specific categorical exclusion is used, the required review must be prepared.
  • EA=Environmental Assessment-An EA must be prepared for proposed actions that (1) are not exempt from NEPA, (2) have not
    been categorically excluded, (3) have not been covered in an existing Resource Management Plan EIS or other environmental
    analysis, or (4) do not normally or obviously required an EIS. An EA may be prepared for any action at any time to assist in
    planning and decision making. A Finding of No Significant Impact (FONSI) is prepared if the criteria are met.
  • EIS=Environmental Impact Statement-When a proposed action, including a proposed policy or legislative recommendation, is
    projected to have a significant impact on the quality of the human environment, an EIS must be prepared. An EIS is intended to
    provide decision makers and the public with a complete and objective evaluation of significant environmental impacts, both
    beneficial and adverse, resulting from a proposed action and all reasonable alternatives. An EIS is a major vehicle for fulfilling the
    substantive environmental goals set forth in NEPA.
Comment/Appeal Period

The Field Office Manager has the discretion to determine whether or not the EA and FONSI should be made available for public review prior to making a final decision, as defined in the CEQ regulations (40 CFR 1501.4(e)(2)). Program-specific guidance should also be consulted to determine if the EA and FONSI must be reviewed by the public prior to a decision. The manager must notify the public, including affected State and local governments and Indian tribes, of the review period (40 CFR 1506.6). The comment period for an EA is generally 30 days. If a public review is determined unnecessary, the affected and interested public must be notified of the availability of the EA and the FONSI (40 CFR 1501.4(e)(1) and 1506.6). The manager responsible for authorizing the action determines the appropriate means for notifying the public and ensuring availability based on the extent of concern and interest in the action. Any person who is adversely affected by the decision has the right to appeal within 30 days of the signing of the Decision Record (DR) (43CFR 4.410(a) and 43 CRF 4.411(a)).

Number
 Type
 Project
Name
 Project
Description
 Project
Lead
 Start
Date
Staff
Comments
Due
FONSI/
DR/CX
Signed
Appeal
Period
Over
Comments/
Status
CA320-
NEPA-06-01
EA
Cold Springs
RX Fire &
Fence
Relocation
Prescribed Fire and Fence Construction
 Lowrey
11/2/2005
Sent to
Staff
11/03/05
03/13/06
05/08/06
 06/28/2006
Burn Completed 10/06
Fence to be
Constructed FY 08
CA320-
NEPA-06-02
CX
Fitzhugh
Creek Water
Gap Fencing
Improve & Maintain
Existing Water Gap
Fencing
Lowrey
11/09/05
 N/A
 11/09/05
 N/A
 To Be Constructed
FY07
CA320-
NEPA-06-03
 
EA
Mahogany
Ridge Stock
Trail Springs
Juniper Removal &
Improve Rebuild
Existing Springs
 
Lowrey
11/9/2005
Sent to
Staff 
 08/30/06
 11/06/06
 01/03/07
 To Be Constructed
FY08
CA320-
NEPA-06-04
 CX
North Coble
Free Use
Firewood
 FWCU
 Hall
12/06/05
N/A
 12/19/05
 N/A
Firewood Cutting Area
Open
CA320-
NEPA-06-05
 CX
Parks 2
Forest Health
Thinning
Hall
 
 
 N/A
 07/12/06
 N/A
 
 
CA320-
NEPA-06-06

 CX 

12KV Electric Transmission Line Renewal 

 ROW 

Rhinehart 

N/A 

01/22/06 

 01/22/06 

 N/A 

 ROW Issued 

CA320-
NEPA-06-07 

CX 

12KV Electric TransmissionLine Renewal 

 ROW 

 Rhinehart 

01/11/06 

 N/A 

 01/22/06 

N/A 

 ROW Issued 

CA320-
NEPA-06-08

 CX 

12KV Electric Transmission Line Renewal & 6.9 KV Electric Distribution Line Renewal 

 ROW 

 

 Rhinehart 

 

01/11/06 

 

 N/A

 01/22/06 

 

 N/A 

 

 ROW Issued 

 

CA320-
NEPA-06-09 

 CX 

12KV Electric Transmission Line Renewal 

 ROW 

 Rhinehart 

01/11/06 

N/A 

 01/22/06 

N/A 

 ROW Issued 

CA320-
NEPA-06-10 

 CX 

 

12KV Electric Transmission Line Renewal & 6.9 KV Electric Distribution Line Renewal

 ROW 

 

Rhinehart 

 

 01/11/06 

 

N/A  

 

 01/22/06 

 

 N/A 

 

 ROW Issued 

 

CA320-
NEPA-06-11

 CX 

6KV Electric Transmission Line Renewal 

 ROW 

 Rhinehart 

01/11/06 

 N/A 

01/22/06 

 N/A 

ROW Issued 

CA320-
NEPA-06-12 

 CX 

12KV Electric Transmission Line Renewal 

 ROW 

Rhinehart 

01/11/06 

N/A 

01/22/06 

N/A 

ROW Issued 

CA320-
NEPA-06-13 

 CX 

12KV Electric Transmission Line Renewal 

ROW 

Rhinehart 

01/11/06 

 N/A 

01/22/06 

N/A 

 ROW Issued 

CA320-
NEPA-06-14 

 CX 

12KV Electric Transmission Line Renewal 

ROW 

 Rhinehart 

01/11/06 

 N/A 

01/22/06 

 N/A 

 ROW Issued 

CA320-
NEPA-06-15 

CX 

Thompson ROW 

ROW 

Rhinehart 

 

N/A  

02/06/06 

N/A 

ROW Issued 

CA320-
NEPA-06-16 

 CX

Widow Peak Thinning 

Forest Health Thinning 

Hall 

11/15/05 

 

 

 

 

CA320-
NEPA-06-17 

 EA 

Mt. Dome Group Grazing Lease Renewal 

 Grazing Lease Renewal 

Lowrey 

01/05/06 

01/31/06 

03/08/06 

04/27/06 

10 Year GrazingLeases Issued for 11 Allotments 5/06 

CA320-
NEPA-06-18
 

EA 

Grazing Permit Renewal Clark’s Valley Allotment #00309 Warm Springs Allotment 00312
Dry Cow Allotment #00306 South Fork Allotment #00325 Rim Rock Allotment #10123

 Grazing Permit Renewal

 Butow 

11/19/04

01/17/06

04/04/06

05/25/06 

10 Year Grazing Permit Issued for 5 Allotments 8/06 

CA320-
NEPA-06-19 

EA 

Grazing Permit Renewal North Tablelands Allotment #00137 Yankee Jim Allotment #00138 

Grazing Permit Renewal

Lowrey 

9/27/05 

2/14/06 

07/13/06 

09/01/06 

Two 10 Year Grazing Permit Issued for North Tablelands 9/06 

CA320-
NEPA-06-20 

CX 

Foster ROW 

ROW 

Rhinehart 

 

 

 

 

 

CA320-
NEPA-06-21 

 EA 

Eastside Group Grazing Permit Renewal EA 

Grazing Permit Renewal 

Butow/Lowrey 

02/08/06 

07/05/06 

08/14/06 

10/09/06

10 Year Grazing Permits Issued for 15 Allotments 10/06 

CA320-
NEPA-06-22 

 CX 

Box Springs Exclosure 

Riparian Exclosure

Ludwig 

03/21/06 

 

 03/22/06 

N/A 

To Be Constructed FY07 

CA320-
NEPA-06-23 

CX 

Findleton ROW 

ROW 

Rhinehart 

03/22/06 

 

 

 

 

CA320-
NEPA-06-24 

 EA 

Timbered Crater Shaded Fuel Break 

Fuels Reduction 

Savage 

02/22//06 

2/15//06 

04/03/06 

05/12/06 

Project Completed FY06 

CA320-
NEPA-06-25 

EA 

Scorpion Point Fence 

Cultural Resource Protection Fence 

Foster-Curley 

03/26/06 

07/30/06  

 

 

Ongoing 

CA320-
NEPA-06-26 

EA 

Pinnio Springs Restoration 

Riparian Protection & Juniper Cut 

Ludwig 

04/11/06 

07/20/06  

 

 

To Be Constructed FY07 

CA320-
NEPA-06-27 

EA 

Coyote Ridge Road Improvement 

Existing Road Improvement 

Lowrey 

02/16/06 

09/30/06 

 

 

Ongoing 

CA320-
NEPA-06-28 

 CX 

Whitewater Family Adventures 

Guide Permit 

Singleton 

05/25/06 

N/A 

07/07/06 

N/A 

Permit Issued 

CA320-
NEPA-06-29 

CX 

Invenergy MET Tower 

MET Tower 

Rhinehart 

06/01/06 

 

 

 

 

CA320-
NEPA-06-30 

EA 

McKabe Spring Complex Restoration 

Riparian Restoration/Juniper Treatment 

Ludwig 

06/12/06 

09/30/06 

 

 

To Be Constructed FY07 

CA320-
NEPA-06-31 

EA 

Westside Group Grazing Permit Renewal 

Grazing Permit Renewal 

Aarstad/
Lowrey 

03/01/06 

08/15/06 

09/19/06 

11/13/06 

10 Year Grazing Permits Issued for 14 Allotments 11/06 

CA320-NEPA-0631b

CX 

Cedar Creek Springs Juniper Cut 

Riparian Restoration/
Juniper Treatment 

Ludwig 

08/29/06 

.

.

.

Ongoing