Tableland Project Priorities
1. North Fitzhugh diversion pipe (Ditch Liner completed 2002) 2. Little Juniper and Juniper Hill stockponds (Completed) 3. Neckdown/close gaps (Completed) 4. Rim fence maintenance (Completed) 5. Antelope Trap fence replacement (Completed) 6. Yankee Jim ponds/ditch system/duck ponds (First stage completed) 7. Indian/Roberts Spring development and fencing (Completed 2003) 8. East/West Spring development and fencing (Scheduled for 2004 construction) 9. Yankee Jim Pasture and perimeter fencing (Perimeter Completed) 10. Millward fence removal/division fencing/spring exclosure/pond (Pasture fence to be constructed 2003/2004) 11. Dobe Swale Reservoir/fencing/division rocks (Division rocks not completed) 12. Prospect Spring development and fencing 13. Rock Spring development and fencing (Scheduled for 2004 construction) 14. Ranch House dispositon (based on public input) 15. Tablelands signing 16. Cab Field fence realignment (Completed) 17. Signal Butte Well repair (Scheduled for propane fired generator - 2004)) 18. Yankee Jim juniper cuts (Jim Creek completed) 19. Yankee Jim road closure/reroute: a. Near pond 2 b. South side of Yankee Jim meadow c. Road crossing on W. Spring d. Eckland boundary gate culvert e. Jim Creek/Ranch House crossing f. East Spring crossing g. Hershey Spring/Fitzhugh Creek 20. Rock armor headcut below `78 exclosure 21. Fitzhugh Creek juniper cuts 22. Feasibility study on mineral withdrawals 23. Install cattleguards at Signal Butte and Big Juniper Creek (Signal Butte completed) 24. Millward Field stockpond 25. Pine Creek Mesa north fence 26. Pine Creek Mesa CDF&G boundary fence (Completed) 27. Corbie Field exchange 28. Stevens Allotment exchange 29. Dispose of land west of highway 395 30. Clean up debris around ranch 31. Burn drug lab (Completed) 32. Repair/rebuild nesting islands 33. Fence nesting islands 34. North Fork/Jim Creek diversion study 35. Riparian planting at Fitzhugh Creek 36. Fitzhugh Creek Canyon prescribed burn
|
|