U.S. DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT
California
 

Barstow NEPA Documents

The table below shows the Barstow NEPA documents that are currently being developed or have recently been completed. Some of the documents in that table are available on-line and can be downloaded by clicking the entry in the Type column.

There is a legend available which describes NEPA terms.

To sort the documents, click on a column header. You can also narrow results through a custom search by clicking here. To view documents from another office, select an office in the box below.

Your search found records.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Next

Project Number Type Program Description Geographic Location Contact Status Initiated Completed Field Office Fiscal Year
CA-680-2009-0006CXLands and RealtyGTP Comm Towers ReassignmentYermo Quad: T10N, R1E, Sec 2; T11N, R1E, Sec 35 Birgit Hoover
760-252-6035
Awaiting prep and circulation of CX for review11/24/2008Barstow
CA-680-08-16CXPublic SafetyCalico Mtns Clean-up; 516 DM 11.9 J(10) Within and adjacent to Mule and Odessa Canyons Brad Mastin
760-252-6050
Cleanup Completed01/14/200802/07/2008Barstow 2008
CA-680-06-85CXRecreationOpen Route Signing in 5 restoration areasWithin 5 West Mojave Restoration areas in DWMAsBrad Mastin
760-252-6050
Awaiting funding determinations08/09/2006Barstow 2006
CA-680-2009-0004CXLands and RealtyRoyal St. Comm. Site at existing Rasor Rd site CACA-50398West of Soda Lake Quad: T12N, R7E, Sec 14 NE Rich Rotte
760-252-6026
Awaiting receipt of cost recovery $10/14/2008Barstow
CA-680-08-21EALands and RealtyWaterman Hills Horizon Wind Testing--Addition of One AnometerWaterman Hills (Fremont-Kramer DWMA) T11N, R2W, Sec 35 SBBMRich Rotte
760-252-6026
On Hold pending WO Policy Review01/28/2008Barstow
CA-680-2009-0007CXLands and RealtyRoyal Street Comm Site Renewal at Zzyzx Rd. W. of Soda Lake Quad: T13N, R8E, Sec 20 Birgit Hoover
760-252-6035
Awaiting prep and circulation of CX for review11/24/2008Barstow
CA-680-06-62EARecreationOHV Grant II-El Mirage Campground Developmts.Twin Hills AreaBrad Mastin
760-252-6050
Awaiting funding determinations06/27/200607/28/2006Barstow 2006
CA-680-08-68CXLands and RealtyFirst Wind (UPC) Granite Mtns new met tower location (type 1)Turtle Valley South Quad, T5N, R2W, Sec 22Rich Rotte
760-252-6026
CX dependent upon staff field and access review 09/10/2008Barstow
CA-680-08-42CXLands and RealtyPPSW ENXCO Solar Testing Facility (40 ft. x 50 ft)T9N, R4E, Sec 28, SBBM--Troy Lake areaJoan Patrovsky
760-252-6032
Tech reports under preparation to determine scope of EA04/28/200810/23/2008Barstow 2009
CA-680-07-59CXLands and Realty516 DM 11.9 E(12): R/W Amendment--PPM (PWD) 1 Additional Anometer--Elephant Mountain Site T9N, R1W, Sec. 8Joan Patrovsky
760-252-6032
Awaiting CX for Staff Review08/13/2007Barstow 2007

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Next