Barstow NEPA DocumentsThe table below shows the Barstow NEPA documents that are currently being developed or have recently been completed. Some of the documents in that table are available on-line and can be downloaded by clicking the entry in the Type column. There is a legend available which describes NEPA terms. To sort the documents, click on a column header. You can also narrow results through a custom search by clicking here. To view documents from another office, select an office in the box below.
Your search found records. Prev 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Next
Project Number |
Type |
Program |
Description |
Geographic Location |
Contact |
Status |
Initiated |
Completed |
Field Office |
Fiscal Year |
CA-680-07-23 | EA | Lands and Realty | Oak Creek Energy Black Butte 4 Met Tower & Wind Study Area Reservation | SBBM T8N, R6E & R7E, T7N, R7E | Joan Patrovsky 760-252-6032 | On hold pending WO policy review. Awaiting possible receipt of Type 1 application for met towers outside of ACEC | 01/08/2007 | | Barstow | |
CA-680-06-45 | CX | Lands and Realty | SCE Baroid 33kV R/W Renewal & FLPMA Conversion | SBBM T8N, R3E, Sec6 & T9N, R3E, Sec31 | Joan Patrovsky 760-252-6032 | R/W Letter to go out in early 2007 | 04/24/2006 | 06/08/2006 | Barstow | 2006 |
CA-680-06-04 | EA | Public Safety | Newberry Pit Human Health & Safety Fence, Reclamation of Erosion Channel, and Trash Cleanup | SBBM T8N, R3E, Sec 11 | Jamie Livingood 760-252-6029 | Fence and Trash Cleanup Completed, erosion channel reclam pending Jun 2007 | 10/24/2005 | 05/07/2007 | Barstow | 2007 |
CA-680-07-03 | EA | Minerals | Azucar Mine Exploratory Drilling & associated Access Routes | SBBM T8N, R2E, Sec. 18 & 19 | Jamie Livingood 760-252-6029 | Awaiting Bio & Cult Field Surveys | 10/11/2006 | | Barstow | |
CA-680-06-12 | EA | Public Safety | El Mirage OHV Area-6 Shaft PUF Closures or Protection Grates/Fences | SBBM T7N, R6E, Secs. 20 & 28 | Jamie Livingood 760-252-6029 | Completed | 11/28/2005 | 07/21/2006 | Barstow | 2006 |
CA-680-06-21 | CX | Wildlife | El Mirage Mine Shaft Bat Surveys | SBBM T7N, R6E, Secs. 20 & 28 | Jamie Livingood 760-252-6029 | Completed | | 01/06/2006 | Barstow | 2006 |
CA-680-06-20 | EA | Hazardous materials | K-M Pipeline Testing & Repairs at Anomoly (Possible Leak) Locations | SBBM T7N, R4W, Sec 28; T12N, R6E, Sec 34; T12N, R7E, Sec 21 &15; T15N, R10E, Sec13; T15N, R11E, Sec 18; T16N, R14E, Sec 10, 31, 32. | Janice Davis 760-252-6023 | Completed | | 12/20/2005 | Barstow | 2006 |
CA-680-06-73 | EA | Lands and Realty | Rancho Road R/W | SBBM T6N, R4W, S. 32 | Rich Rotte 760-252-6026 | Not yet scoped--2009 or 2010 Construction Date | 07/12/2006 | | Barstow | |
CA-680-06-74 | CX | Lands and Realty | Rancho Road Construction Temporary R/W | SBBM T6N, R4W, S. 32 | Rich Rotte 760-252-6026 | Not yet scoped--2009 Construction Date | 07/12/2006 | | Barstow | |
CA-680-06-46 | CX | Lands and Realty | MCI Easement for existing Fiberoptic line through acquired lands | SBBM T6N, R3W, Sec 1, Lot 2 | Joan Patrovsky 760-252-6032 | Completed | 04/24/2006 | 04/28/2006 | Barstow | 2006 |
Prev 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Next
|
|