A seagull flies over the California Coastal National Monument which stretches along the entire coast of California and extends 12 miles into the Pacific Ocean.  The Monument includes 20,000 rocks, islands, pinnacles and reefs.
BLM
U.S. DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
Wagon wheel in the Carrizo Plain National Monument Geothermal Well Rock Climbing Wild Horses River Rafters on Cache Creek
California
BLM>California>El Centro>NEPA
Print Page
El Centro Field Office

Environmental Documents

Environmental Impact Statement (EIS) - An EIS evaluates actions that are likely to have significant environmental impacts. It analyzes a range of reasonable alternatives to accomplish the purpose and need for Federal action.  A draft EIS is released to the public for comment followed by a final EIS and then a Record of Decision (ROD).

Draft Environmental Impact Statement (DEIS) - A draft EIS is released to the public for comment prior to a final EIS.

Final Environmental Impact Statement (FEIS) - A final EIS is released prior to a Record of Decision.

Environmental Assessment (EA) – An EA is typically a shorter document than an EIS.  An EA’s analysis of expected environmental impacts is used to determine if there may be significant impacts which would require the preparation of an EIS and to facilitate reasoned decision making.  If the analysis in the EA shows no significant impact, a Finding of No Significant Impact (FONSI) is made by the manager.  EAs may or may not include alternatives to the proposed action.

Categorical Exclusion (CX) - The Department of the Interior and BLM maintain lists of actions that are categorically excluded from analysis under an EA or EIS. These are generally routine actions with minor impacts.

Determination of NEPA Adequacy (DNA) - Existing environmental documentation can and should be used whenever possible. If previous documents fully encompass a proposed action, then no further review is needed. This finding is documented by a Determination of NEPA Adequacy (DNA).



Recent Documents

Document No.

Title

CA-670-2008-107Sunrise Powerlink Helicopter Surveys FONSI, DR & EA
CA-670-2008-76Pyramid Construction Environmental Assessment
CA-670-2005-95Green Hunter FONSI, DR & EA
CA-670-2007-93SES Solar Two Project Geotechnical Investigation FONSI, DR & EA
CA-670-2007-88Verizon Sunrise Butte Communication Site EA
FES-08-10USG Expansion & Modernization Project FEIS
DES-07-43Truckhaven Geothermal Leasing Area FEIS


Quick Links