Link to USGS home page
USGS Home
Contact USGS
Search USGS
Coastal & Marine Geology InfoBank

USGS CMG InfoBank: Old River Channel

Skip navigational links
Search InfoBank
Home tab FACS tab Activities tab Atlas tab Geology School tab More tab More tab Geology School tabs
   
Dictionaries: The USGS and Science Education   USGS Fact Sheets   Topics   Keywords   Data Dictionary   Metadata Dictionary   Computer Terminology   Digital Formats
InfoBank Terms: Activity ID   activity overview   crew   formal metadata   lines   metadata   NGDC   port stops   project/theme   region   ship   stations   time   virtual globe   year  
Data Types: bathymetry   geodetic positioning   gravity   ground penetrating radar   imagery   LIDAR   magnetics   metering equipment   navigation   samples   seismic   definitions disclaimer  
Data Formats: ARC coverage   E00   FGDC metadata   gridded/image   imaging   material   scattered/swath   Shapefile   vector/polygon  
   
Comment: 16:52 - 17:32 (00:40)

Source: Annenberg/CPB Resources - Earth Revealed - 20. Running Water II: Landscape Evolution

Keywords: "Old River", dam, "U.S. Army Corps of Engineers", "Old River Control Project", river, "Mississippi River", "Atchafalaya River", "navigational lock", flow-rate

Our transcription: First, the Old River channel was dammed; this meant that the only natural connection between the Atchafalaya and the Mississippi was closed.

Since the Corps did not want to disrupt boat traffic between the two Rivers, a navigational lock was built on Old River at a cost of $15 million.

To enforce the mandated 70/30 flow-rate, construction began on two control structures at a combined cost of $15 million.

These structures were completed and operational by 1963.

Geology School Keywords

Skip footer navigational links


InfoBank   Menlo Park & Santa Cruz Centers   St. Petersburg Center   Woods Hole Center   Coastal and Marine Geology Program   Geologic Information   Ask-A-Geologist   USGS Disclaimer  

FirstGov button   Take Pride in America button