Civil Works Branch |
|
Chief, Civil Works Branch |
|
Contact Information |
U.S. Army Corps of Engineers |
ATTN: CESWF-PM-C |
P.O. Box 17300 |
Fort Worth, TX 76102-0300 |
|
TEL: (817) 886-1473 |
FAX: (817) 886-6443 |
Marcia R. Hackett
|
Study/Project |
Authority |
Phase |
Cypress Valley Watershed | GI | Recon |
Nueces River Watershed | GI | Feasibility |
Sulphur River Basin | GI | Feasibility |
Gene T. Rice, Jr.
|
Study/Project |
Authority |
Phase |
Lower Trinity Basin (not started) | GI | Recon |
Upper Trinity Basin - Dallas Floodway | GI | Feasibility |
Upper Trinity Basin - Big Fossil Creek | GI | Feasibility |
Upper Trinity Basin - Regional Resource Inventory | GI | Feasibility |
Upper Trinity Basin - Irving Northwest Levee | GI | Feasibility |
Riverside Oxbow | GI | PED |
Central City, Fort Worth | CG | Construction |
Dallas Floodway Extension | CG | Construction |
Johnson Creek, Arlington | CG | Construction |
|
Thomas R. Vogt
|
Study/Project |
Authority |
Phase |
Upper Colorado River Basin Study (not started) | GI | Recon |
Lower Colorado - Highland Lakes | GI | Feasibility |
Lower Colorado - Williamson Creek | GI | Feasibility |
Lower Colorado - Shoal Creek | GI | Feasibility |
Lower Colorado - Walnut Creek | GI | Feasibility |
Lower Colorado - Bastrop County | GI | Feasibility |
Lower Colorado - Wharton/Orion | GI | PED |
Brazos River Basin - Systems Assessment | GI | Feasibility |
Abilene (Brazos River Basin) | GI | Feasibility |
Rio Grande | GI | Feasibility |
Cedar Ridge Reservoir, Abilene | GI | Feasibility |
San Antonio Channel Improvement - Mission Reach | CG | Construction |
San Antonio Channel Improvement - Woodlawn | CG | Feasibility |
Graham (Brazos River Basin) | CG | Construction |
Proctor Lake Dam Safety | CG | Construction |
Whitney Lake Powerhouse Rehab | CG | Construction |
Edward C. Foo
|
Study/Project |
Authority |
Phase |
GSAR - Salado Creek | GI | Feasibility |
GSAR - Alamo Heights | GI | Feasibility |
GSAR - Cibolo Creek | GI | Feasibility |
GSAR - Leon Creek | GI | Feasibility |
Lower San Antonio (Tri-County) Flood Study | GI | Feasibility |
|
Continuing Authorities Projects
Local Flood Damage Reduction
|
|
Study/Project |
Authority |
Phase |
Little Fossil Creek, Haltom City - Sec 205
Farmers Branch, White Settlement - Sec 205
Pecan Creek, Gainesville - Sec 205
Little Brazos, Hearne - Sec 205
Many, LA - Sec 205
Everman - Sec 205
Robinson - Sec 205
|
CG/CAP
CG/CAP
CG/CAP
CG/CAP
CG/CAP
CG/CAP
CG/CAP
|
Construction
P&S
P&S
Feasibility
Feasibility
Feasibility
Feasibility
|
|
Environmental Restoration
|
|
Study/Project |
Authority |
Phase |
WWTP, Meridian - Sec 206
WWTP, Stephenville - Sec 206
Big Cypress Bayou, Jefferson - Sec 1135
Eagleland Habitat, San Antonio - Sec 1135
O.C. Fisher Lake - Sec 1135
|
CG/CAP
CG/CAP
CG/CAP
CG/CAP
CG/CAP
|
Feasibility
Feasibility
Construction
Construction
Construction
|
|
Flood Plain Management Services
|
|
Study/Project |
Authority |
Phase |
Nokomis Road, Lancaster
Water Treatment Intake, Seguin
Colorado River at Caldwell Lane, Travis County |
CG/CAP
CG/CAP
CG/CAP |
PDA
Construction
Feasibility |
|
Streambank Protection Projects
|
|
Study/Project |
Authority |
Phase |
Nokomis Road, Lancaster
Water Treatment Intake, Seguin
Colorado River at Caldwell Lane, Travis County |
CG/CAP
CG/CAP
CG/CAP |
PDA
Construction
Feasibility |
|
Planning Assistance to States
|
|
Study/Project |
Authority |
Phase |
Wright Patman Cultural Survey
Lake Palo Pinto Hydro Survey
Lake Cypress Springs Hydro Survey
Lewisville Lake Volumetric Survey
Ray Roberts Lake Volumetric Survey
Lake Travis Sediment Survey
Cypress Bayou Cross Sections Survey
Lake Mexia Sediment Survey
Lake Weatherford Sediment Survey
Miller Creek Res Breach Analysis
Navarro Mills Sediment Survey
EAA/Guadalupe Basin
|
GI
GI
GI
GI
GI
GI
GI
GI
GI
GI
GI
GI
|
PAS
PAS
PAS
PAS
PAS
PAS
PAS
PAS
PAS
PAS
PAS
PAS
|
|
|
Peer Review Plans of Fort Worth District Planning Studies
|