Selected Bibliography (1)

Basic Reports on Project Mercury

Air Force Space Systems Division TDR-63-381, Sally Anderson, ed., Final Report: Mercury/Atlas Launch Vehicle Program (Inglewood, Calif., Nov. 1963)

Air Force Space Systems Division, General Dynamics/Astronautics, and NASA, Proceedings of the Mercury-Atlas Booster Reliability Workshop (San Diego, Calif., July 12, 1963)

American Rocket Society, Space Flight Report to the Nation, "The Mercury-Redstone Program," paper by Jerome B. Hammack and Jack C. Heberlig (New York, Oct. 9-15, 1961)

Department of Defense Project Mercury Support Operations, Final Report to the Secretary of Defense on Department of Defense Support of Project Mercury: For the Period 1 July 1959 through 13 June 1963, Sept. 11, 1963

Fairchild Publications, Inc., Manned Spacecraft: Engineering, Design, and Operation, Paul E. Purser, Maxime A. Faget, and Norman F. Smith, eds. (New York, 1964)

International Business Machines Corporation and Western Electric Company, Inc., Final Report, Project Mercury, prepared for NASA, March 1, 1962

NASA, Project Mercury: A Chronology, by James M. Grimwood, NASA SP-4001 (Washington, 1963)

NASA, Results of the Project Mercury Ballistic and Orbital Chimpanzee Flights, James P. Henry and John D. Mosely, eds., NASA SP-39 (Washington, 1963)

NASA, Space Medicine in Project Mercury, by Mae Mills Link, NASA SP-4003 (Washington, 1965)

NASA, Ninth Semiannual Report to Congress, January 1-June 30, 1963, "Project Mercury in Review" (Washington, 1964)

NASA, Mercury Project Summary, Including Results of the Fourth Manned Orbital Flight May 15-16, 1963, NASA SP-45(Washington, 1963)

*NASA Manned Spacecraft Center, "Postlaunch Memorandum Report for Mercury-Atlas No. 5 (MA-5)," 1961

*NASA Manned Spacecraft Center, "Postlaunch Memorandum Report for Mercury-Atlas No. 6: Part I, Mission Analysis," 1962

*NASA Manned Spacecraft Center, "Postlaunch Memorandum Report for Mercury-Atlas No. 7 (MA-7), Part I, Mission Analysis," 1962

*NASA Manned Spacecraft Center, "Postlaunch Memorandum Report for Mercury-Atlas No. 8: Part I, Mission Analysis," 1962

*NASA Manned Spacecraft Center, "Postlaunch Memorandum Report for MA-8: Part III, Air-Ground Voice and Debriefing," 1962

*NASA Manned Spacecraft Center, "Postlaunch Memorandum Report for Mercury-Atlas No. 9 (MA-9): Part I, Mission Analysis," 1963

*NASA Manned Spacecraft Center, "Postlaunch Memorandum Report for Mercury-Atlas No. 9 (MA-9): Part II, Data," 1963

*NASA Manned Spacecraft Center, "Postlaunch Memorandum Report for Mercury-Atlas No. 9 (MA-9): Part III, Mission Transcripts," 1963

*NASA Manned Spacecraft Center, "Manned One-Day Mission Quarterly Status Report," numbered 17 and 18, 1962-1963

NASA Marshall Space Flight Center, Final Report, Mercury-Redstone Project-Launch Operations by Emil P. Bertram and Richard E. Dutton, MSFC-LOD-62-5 (Cape Canaveral, Fla., May 28, 1962)

NASA Marshall Space Flight Center, Saturn-Apollo Systems Office, The Mercury-Redstone Project, R. I. Johnson, et al., eds., TMX-53107 (Huntsville, Ala., June 1964)

*NASA Space Task Group/Manned Spacecraft Center, "Project Mercury Quarterly Status Reports," Nos. 1 through 16, 1959-1962

*NASA Space Task Group, "Postlaunch Memorandum Report for Mercury-Redstone No. 4 (MR-4)," 1961

*Flight and status reports not listed as Project Mercury working papers.


Previous Next Index