Appendix F

Contract NAS 5-59 With McDonnell Aircraft Corp.

Mercury Cost Breakdown

[As of Oct. 14, 1965]
Structure and Systems:
Nonrecurring development $40,219,000
Recurring cost (20 units) 49,354,000
Models and mockups 1,489,000
Ground-test program 887,000
Trainers 3,088,000
Thermal balance test program 5,712,000
Publications, specifications, and data 345,000
Launch support: St. Louis 1,187,000
Launch support: Cape Kennedy 14,750,000
Spare parts 5,432,000
Aerospace ground equipment 9,951,000
Repairs and modification 1,049,000
1-day mission changes 9,337,000
Total $142,800,000

Summary of DOD Support of Project Mercury

[through June 1963]

[Extracted from: "Final Report to the Secretary of Defense on Department of Defense Support of Project Mercury," approved by Maj. Gen. L. I. Davis, USAF, Sept. 11, 1963]
Actual costs in thousand dollars
Agency Type/level of supporta NASA reimbursed DOD absorbed Total
AIR FORCE:
Space Systems Division (SSD). Atlas boosters, launch crews and facilities, engineering, aircraft support. 23 people plus contractors. 216 aircraft-hours. 73,862 1,351 75,213
AF Missile Test Center (AFMTC). Operation of 3 network stations, launch support, assist in recovery. 173 people, 2,722 aircraft-hours. 6,569 5,652 12,221
Air Proving Ground Center (APGC). Operation of 1 network station, assist in network training. 21 people, 551 aircraft-hours. 22 956 978
Air Force Communications Service (AFCS). Communications engineering and installation; communicator deployment to contingency cites. 8 people. 140 201 341
Military Air Transport Service (MATS). Airlift people and cargo. 1,040 69 1,109
Air Rescue Service (ARS). Aircraft support to theater commanders; deploy forces for contingency recovery. 6,426 aircraft-hours. 1,063 260 1,323
Aeronautical Chart and Information Center (ACIC). Cartographic Service. 10 people. 5 190 195
Tactical Air Command (TAC). Aircraft support for contingency recovery. 546 aircraft-hours. 42 87 129
Air Defense Command (ADC). Radar aircraft support. 245 aircraft-hours. 3 271 274
U.S. Air Force Europe (USAFE). Deployment to remote sites for contingency recovery. 2,091 aircraft-hours. 720 279 999
Pacific Air Force (PACAF). Deployment to remote sites for contingency recovery. 331 aircraft-hours. 362 189 551
Other. Air Weather Service: weather surveillance and forecasting. AEDC and AFFTC: test facilities. 8 911 919
Total Air Force costs. 83,836 10,416 94,252
NAVY:
Fleet Operations. Astronaut and capsule recovery in planned areas. 1,441 shipdays, 4,044 aircraft-hours. 8,934 15,110 24,044
Pacific Missile Range (PMR). Operation of 3 network stations; aircraft and tracking ship support. 144 people, 347 aircraft-hours, 170 ship-days. 3,321 4,720 8,041
Total Navy costs. 12,255 19,830 32,085
ARMY:
White Sands Missile Range (WSMR). Operate 2 network stations, 39 people. 962 247 1,209
U.S. Army Europe (USAREUR). Helicopter and pararescuemen support for contingency recovery. 107 Helo-hours. 117 78 195
Other. LARC support, communications, test facilities, trackingship support. 1,221 405 1,626
Total Army costs. 2,300 730 3,030
BIOASTRONAUTICS (Army, Navy, Air Force):
Operational. Aeromedical monitors, recovery medical specialists, medical supplies, hospitals. 159 people average per mission. 497 1,070 1,567
Research and development. Astronaut selection and training; laboratories. 981 1,320 2,301
Total bioastronautic costs. 1,478 2,390 3,868
Air Force 83,836 10,416 94,252
Navy 12,255 19,830 32,085
Army 2,300 730 3,030
Bioastronautics 1,478 2,390 3,868
Total. 99,869 33,366 133,235
aAverage number of full-time people.