WBV-33 - Old Estelle PS Fronting Protection and Modifications
Already built to authorized level of protection. PS fronting protection, modifications, floodwall tie-ins to the 100 year.

This contract involves the installation of fronting protection for the pumping station and modification to the existing facilities bringing them to the 100 year level of protection. The fronting protection will involve the construction of sluice gates and modifications will include the construction of higher floodwalls at the discharge point.


CONTRACT INFORMATION

WBV-33
Contract Award Q-2-2009
Contract Value $20-50M