Ambrough Slough Habitat Project, Pool 10, Wisconsin
|
»
|
Aquatic Ecosystem Restoration: Section 206, Paint Creek Restoration, Waukon, Iowa
|
»
|
Asian Carp Barrier System Upper Mississippi River
|
»
|
Blackhawk Park Backwater Restoration Project , Victory, Wisconsin
|
»
|
Bussey Lake Habitat Project, Guttenberg, Iowa
|
»
|
Capoli Slough Habitat Project, Pool 9, Wisconsin
|
»
|
Christine and Hickson Dams
|
»
|
Cold Springs Habitat Project, Crawford County, Wis.
|
»
|
Conway Lake Habitat Project, Lansing, Iowa
|
»
|
Drayton Dam Habitat Restoration, Drayton, North Dakota
|
»
|
Dresbach Island Revegetation Project
|
»
|
East Channel Habitat Project, La Crescent, Minn./Wis.
|
»
|
Endangered Species - Conservation of Native Mussels
|
»
|
Environmental Infrastructure Assistance - City of Garrison and Kathio Township, Minnesota
|
»
|
Environmental Infrastructure Assistance Program: Section 219 - Devils Lake and All of North Dakota
|
»
|
Environmental Infrastructure Assistance Program: Section 219 at Central Lakes, Goodview, Grand Rapids, Willmar, Minnesota
|
»
|
Environmental Infrastructure Assistance Program: St. Croix Falls, Wisconsin
|
»
|
Fargo-Moorhead and Upstream Feasibility Study
|
»
|
Feasibility Study: Blue Earth River Basin in Minnesota and Iowa
|
»
|
Finger Lakes Habitat Project , Wabasha, Minnesota
|
»
|
General Investigations: Hydropower, Crown Hydro, Minneapolis, Minnesota
|
»
|
General Investigations: Hydropower, Ford Plant, Minneapolis, Minnesota
|
»
|
Grand Marais River Aquatic Ecosystem Restoration
|
»
|
Guttenberg Waterfowl Ponds Habitat Project, Iowa
|
»
|
Habitat Restoration: Mississippi River, Pool 8 Islands Phase III, Wisconsin/Minnesota
|
»
|
Habitat Restoration: Mississippi River, Clear (Finger) Lake, Pool 5, Minnesota
|
»
|
Harpers Slough Habitat Project, Pool 9, Iowa
|
»
|
Hay Creek Aquatic Ecosystem Restoration - Roseau County, Minnesota
|
»
|
Indian Slough Habitat Project, Buffalo County, Wis.
|
»
|
Integrated Watershed Study: Minnesota River Basin in Minnesota, South Dakota, North Dakota and Iowa
|
»
|
Island 116 Channel Closure & Shoreline Stabilization
|
»
|
Island 42 Habitat Project, Wabasha County, Minn.
|
»
|
Kinnickinnic River Aquatic Ecosystem Restoration
|
»
|
Lake Onalaska Habitat Project, La Crosse, Wisconsin
|
»
|
Lake Winneshiek Habitat Project, Ferryville, Wis.
|
»
|
Lansing Big Lake Habitat Project, Lansing, Iowa
|
»
|
Long Lake Habitat Project , Trempealeau, Wisconsin
|
»
|
Long Meadow Lake Habitat Project, Bloomington, Minn.
|
»
|
Lower St. Anthony Falls Rapids Restoration, Mississippi River, Minneapolis, Minn.
|
»
|
Marsh Lake Ecosystem Restoration Feasibility Study, Lac Qui Parle Wildlife Area, MN
|
»
|
McGregor Lake Habitat Project, Prairie du Chien, Wisconsin
|
»
|
Minnehaha Creek Watershed Study
|
»
|
Mississippi River Bank Stabilization Habitat Project, Minn/Wis/Iowa
|
»
|
Mississippi River Locks and Dams Nos. 2-10 Embankment Rehabilitation
|
»
|
Mississippi River Recreation and Environmental Stewardship, Eau Galle Dam
|
»
|
Mississippi River: Lock & Dam 3 Navigation Safety and Embankments, Minnesota and Wisconsin
|
»
|
Mud Lake Water Management
|
»
|
North Ottawa Impoundment Project, Grant County, Minn.
|
»
|
Orr, Minnesota Water Line Replacement - Section 569 Environmental Infrastructure Program
|
»
|
Painter Creek Habitat Restoration, Minnehaha Creek, Minnesota
|
»
|
Peterson Lake Habitat Project, Wabasha, Minnesota
|
»
|
Pigs Eye Habitat Restoration Lake, St. Paul, Minnesota
|
»
|
Polander Lake Habitat Project, Winona, Minnesota
|
»
|
Pool 8 Islands Phase I Habitat Project, Wisconsin
|
»
|
Pool 8 Islands Phase II Habitat Project, Stoddard, Wis.
|
»
|
Pool 9 Island Habitat Project, Wisconsin
|
»
|
Pool Slough Habitat Project, New Albin, Iowa
|
»
|
Reconnaissance Report: Baraboo/Wisconsin River
|
»
|
Reconnaissance Study: Minnesota River Basin in MN, SD, IA and ND
|
»
|
Recreational Boating Study of the Mississippi River, Pools 4 to 9, Summer 2003
|
»
|
Red Lake River/Zah Gheeng Marsh Projects, Clearwater County, Minn.
|
»
|
Red River of the North Basin: Basin-Wide Watershed Management Planning
|
»
|
Red River of the North Basin: Minnesota, North Dakota, South Dakota and Manitoba, Reconnaissance Study
|
»
|
Rice Lake Habitat Project, Savage, Minnesota
|
»
|
River Resource Values and Expectation
|
»
|
Ruffy Brook Aquatic Ecosystem Restoration, Clearwater County, Minnesota
|
»
|
Sand Hill River Aquatic Ecosystem Restoration, Minn.
|
»
|
Small Scale Drawdown Habitat Project, Buffalo City, Wis.
|
»
|
South Washington Watershed District
|
»
|
Spring Lake Islands Habitat Project, Buffalo City, Wis.
|
»
|
Spring Lake Peninsula Habitat Project, Buffalo City, Wis.
|
»
|
St. Croix Headwaters Watershed Study, Wisconsin
|
»
|
St. Croix River: Endangered Mussel Conservation - Zebra Mussel Control
|
»
|
St. Croix Watershed Reconnaissance Study
|
»
|
Streambank Protection: Section 14 Minnehaha Creek WPA Walls, Minnesota
|
»
|
Streambank Protection: Section 14, Barnes County, Kathryn, North Dakota
|
»
|
Streambank Protection: Section 14, Pug Hole Lake, Minnesota
|
»
|
Streambank Protection: Section 14, Sartell, Minnesota
|
»
|
Sturgeon Lake, Pine County, Minnesota, Wastewater Collection and Treatement Facility
|
»
|
Sunrise River Watershed Study, Minnesota
|
»
|
Trempealeau National Wildlife Refuge, Trempealeau, Wis
|
»
|
Upper Mississippi River - Illinois Waterway System Navigation Study
|
»
|
Upper St. Croix Lake Sanitary District Wastewater Collection Systems Improvement Project
|
»
|
WKTY-AM Study Area
|
»
|
Western Flood Control Sites - Minnesota: Lake Traverse, Orwell Lake, Hwy 75 - Bigstone, Lac qui Parle
|
»
|
Western Flood Control Sites – North Dakota: Lake Ashtabula, Homme Lake Souris River
|
»
|
Wild Rice River (MN) Feasibility Study
|
»
|
Wild Rice River Aquatic Ecosystem Restoration, Minn.
|
»
|
Zebra Mussels and Management Implications for Endangered Freshwater Mussels on the Upper Mississippi River System
|
|
|
|
Pool 5 Drawdown
POOL 5 DRAWDOWN TERMINATED
|
The 2006 Pool 5 drawdown for habitat restoration has been terminated. Recent bathymetric surveys of the main channel in Pool 5 indicate that there has been some in-filling of the channel at key locations, which would make it difficult to maintain the authorized Nine-Foot Channel if the pool were in drawdown mode. This would pose an unacceptable risk to commercial navigation.
After consultation with key internal and external technical experts, the drawdown team believes that the benefits of continuing the drawdown are outweighed by the potential for negative impacts on commercial navigation.
The drawdown began on June 12, 2006, as scheduled. The drawdown reached the target of 1.5-foot at LD 5, and 0.5-foot at the Alma, WI gage (primary control point) on June 26, 2006. Shortly thereafter, operation was shifted to primary control due to low and declining river flows, and we began raising the pool elevation at the dam.
|
There was a channel closure in Pool 5 at the Lower Zumbro River due to the grounding of a tow on Saturday, July 8, 2006. A pilot channel was dredged over that weekend and navigation resumed Monday, July 10, 2006.
Because the pool was very near normal pool elevations with minimal drawdown at the time of the grounding (less than 0.2-foot), the drawdown had no effect on this grounding. The channel closure was not a result of the low flow conditions. The pool was in normal pool regulation mode by July 9, 2006. The drawdown lasted 27 days.
The extensive monitoring program for mussel impacts and vegetation response are continuing as planned. We expect to gain critical, valuable information on the effects of the 2005 and 2006 drawdowns in Pool 5 through this monitoring.
|
The Water Level Management Task Force will meet in the near future to discuss the 2006 Pool 5 drawdown, and possible plans for future drawdowns in Pool 5.
|
|
|
|