1 NPD RESERVOIR CONTROL CENTER PROJECT- CGR COUGAR DAM HOURLY OPERATION DATA REPORT FRIDAY JANUARY 9, 2009 GROSS STA ------ OUTFLOW ------ EL AT POWERHOUSE AVG SUPR UNIT STATUS GEN USE -- IN KCFS -- IN FEET + MSL HEAD CAP ON ON MW MW TOTAL POWER SPILL FOREBAY TAILWATR FT MW RMT LINE AVL HOUR 1 0 1.21 1.21 0.00 1588.61 1254.14 334.47 1 2 0 1.21 1.21 0.00 1588.93 1254.14 334.79 2 3 0 1.21 1.21 0.00 1589.25 1254.10 335.15 3 4 0 1.21 1.21 0.00 1589.56 1254.10 335.46 4 5 0 1.21 1.21 0.00 1589.84 1254.10 335.74 5 6 0 1.21 1.21 0.00 1590.12 1254.10 336.02 6 7 0 1.21 1.21 0.00 1590.40 1254.10 336.30 7 8 0 1.52 1.21 .31 1590.62 1254.10 336.52 8 9 0 2.03 1.21 .82 1590.73 1254.10 336.63 9 10 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 TOT 24 0 AVG 0 1.34 1.21 .13 1589.78 1254.11 335.68 MAX 2.03 1.21 .82 1590.73 1254.14 336.63 MIN 1.21 1.21 0.00 1588.61 1254.10 334.47