013779 - Riverside SAMP, CA Print
Written by Jae Chung   
Friday, 12 December 2008


Western Riverside County SAMP

Executive Summary
The County of Riverside is undertaking an integrated planning effort (Riverside County Integrated Plan -- RCIP). The RCIP is a three-part program addressing transportation, habitat conservation (Multi-Species Habitat Conservation Plan -- MSHCP), and County’s General Plan (local land use) in two watersheds. Together, the Santa Margarita (473,000 acres) and San Jacinto (470,000 acres) watersheds total approximately one million acres.

The Special Area Management Plan (SAMP) is an important component of these planning efforts. The Corps of Engineers, Los Angeles District is conducting a comprehensive aquatic resource plan to achieve a balance between aquatic resource protection and reasonable economic development. SAMPs are designed to be conducted in geographic areas of special sensitivity under intense development pressure.

There are two main goals of the SAMP process: to establish a watershed-wide program to increase protection to aquatic resources, and to minimize individual and cumulative impacts of future projects in these watersheds. At the end of the SAMP process, there will be areas that will be protected and preserved, as well as areas where future activities would be allowed to occur, provided that they meet specific criteria developed for protection of the watersheds.

The SAMP consists of three phases estimated to last a total of approximately four years. Phase I includes identification and characterization of aquatic resources in the western Riverside County. Phase II involves preparation of an Environmental Impact Statement including the 404(b)(1) alternatives analysis. Phase III of the SAMP involves finalizing the environmental documents, completion of an aquatic resource restoration plan, and finally issuance of program level Section 404 permits.

Frequently Asked Questions
What is the purpose of a SAMP?
The Corps of Engineers, Los Angeles District is conducting a comprehensive aquatic resource plan to achieve a balance between aquatic resource protection and reasonable economic development. SAMPs are designed to be conducted in geographic areas of special sensitivity under intense development pressure. Interagency, public, and stakeholder involvement is an essential part of the SAMP.

Where is the Corps developing these SAMPs?
SAMPs are currently being conducted in San Diego Creek, San Juan Creek, and portions of San Mateo Creek Watersheds in Orange County; San Jacinto and upper portions of Santa Margarita Watersheds in Riverside County, and Otay River watershed in San Diego County.

What will be the end result of the process?
There are two main goals of the SAMP process: to , and to minimize individual and cumulative impacts of future projects in these watersheds. At the end of the SAMP process, there will be areas that will be protected and preserved, as well as areas where future activities would be allowed to occur, provided they meet specific criteria developed for protection of the watersheds. To this end, an anticipated end result is a program-level permitting program that would authorize those activities that meet specific criteria developed for protection of aquatic resources in the watershed..

What is the effect of the SAMP on growth/environmental protection in the study areas?
The SAMP process is expected to provide better scientific information to improve the decision making process, allow for a comprehensive approach for the management of aquatic resources, provide predictability to the local citizens, and reflect the needs of the communities situated within these watersheds. The SAMP is not a “super permit” and will not accelerate development in the watersheds.

What is the benefit of SAMPs?
Under Section 404 of the Clean Water Act (CWA), the Corps of Engineers regulates discharge of dredge or fill material into waters of the United States. SAMPs are more environmentally sensitive than the traditional project-by project process; the traditional approach may lead to the cumulative loss of resources over time. The SAMP approach allows the Corps to take into account indirect and cumulative effects on aquatic resources in a way not possible in the project-by-project process. With the SAMP approach, we can analyze potential impacts at the watershed scale in order to identify priority areas for preservation, identify potential restoration areas, and determine the least environmentally damaging locations for proposed projects.

What is the first step in developing a SAMP?
Phase I of the SAMP includes the completion of studies to identify the aquatic resources in the project area and to characterize their condition. Other technical studies that aid in understanding aquatic resources in the watersheds will also be conducted.

What happens after the technical studies are completed?
The next phase of the SAMP will consist of compliance with the requirements of the National Environmental Policy Act (NEPA). As part of our compliance with NEPA an Environmental Impact Statement (EIS) will be prepared for each SAMP. Phase II of the process will include the preparation of the Draft EIS and analysis of project alternatives.

Phase III will entail the establishment of program level procedures under Section 404 of the CWA. Future projects may be authorized with the permitting procedures if they meet specific criteria designed to avoid and minimize impacts to aquatic resources.  Implementation includes promoting improved aquatic resource protection.

Who is responsible for the SAMP?
The Corps of Engineers is the lead Federal agency for the SAMP.

Are other agencies involved?
Other participating agencies include the Environmental Protection Agency, the U.S. Fish and Wildlife Service, the Regional Water Quality Control Board, and the California Department of Fish and Game (CDFG). The CDFG is undertaking a Master Streambed Alteration Agreement to fulfill the requirements of Sections 1600 of the state Fish and Game Code.

What is the status of the SAMP?
The Western Riverside County SAMP has been delayed since 2006 due to lack of funding.  Federal funding was provided in early 2008 to resume the SAMP.  The Corps is working on presentable work products showing screened alternatives, draft permitting strategies, and a watershed-based approach to restoration in suppport of the EIS.  Outreach to the general public is envisioned for early 2009.

Related Links


Public Scoping Meeting Posters
- Text Posters of SAMP/MSAA Study Area (263KB PDF)
- Riparian Ecosystem Habitat Integrity (209KB JPG)
- Riparian Ecosystem Hydrologic Integrity (199KB JPG)
- North Central Portion od SAMP/MSAA Study Area (334KB JPG)
- Northeast Portion of SAMP/MSAA Study Area (314KB JPG)
- Northwest Portion of SAMP/MSAA Study Area (235KB JPG)
- South Central Portion of SAMP/MSAA Study Area (333KB JPG)
- Southeast Portion of SAMP/MSAA Study Area (291KB JPG)
- Southwest Portion of SAMP/MSAA Study Area (274KB JPG)
- SAMP/MSAA Study Area
- Riparian Vegetation and Geomorphic Surfaces (145KB JPG)
- Riparian Ecosystem Water Quality Integrity (203KB JPG)

Upcoming Events
To be determined.

Contacts:
Jae Chung
Regulatory Branch
US Army Corps of Engineers
915 Wilshire Blvd
Los Angeles, CA 90017
(213) 452-3292
This e-mail address is being protected from spam bots, you need JavaScript enabled to view it

 
< Prev   Next >

Project Links

News Release
Executive Summary
Main Information
FAQs
Related Links
Events
Maps
Photos
Documents
Partners/Stakeholders
Contacts

Telephone & Email:
For further questions, please
call or email us at...

PHONE: (213) 452-3908/3333
FAX: (213) 452-4209

Content POC: Public Affairs
Technical POC: Webmaster

Login Form






Lost Password?
© 2009 US Army Corps of Engineers - Los Angeles District
This is an official US Government information system for authorized use only. It is intended for unclassified, non-sensitive, non-privacy act information.
About Us | Privacy and Security Notification | Section 508 Compliance | Site Map | Contact Us