subpart 225.2--buy american act--construction materials

(Revised April 13, 2000)

 

 



 225.202 Exceptions.
 225.206 Noncompliance.


225.202  Exceptions.

 

      (a)(2)  A nonavailability determination is not required for construction materials listed in FAR 25.104(a) or in 225.104(a)(iii).  For other materials, a nonavailability determination must be approved at the levels specified in 225.103(b)(ii).  Use the estimated value of the construction materials to determine the approval level.

 

225.206  Noncompliance.

 

      (c)(4)  Prepare any report of noncompliance in accordance with the procedures at 209.406-3 or 209.407-3.

 