subpart 206.2--full and open competition after exclusion of sources

(Revised October 01, 1998)

 

 



 206.202 Establishing or maintaining alternative sources.
 206.203 Set-asides for small business concerns.


206.202  Establishing or maintaining alternative sources.

 

      (a)  Agencies may use this authority to totally or partially exclude a particular source from a contract action.

 

      (b)  The determination and findings (D&F) and the documentation supporting the D&F must identify the source to be excluded from the contract action.

 

              (i)  Include the following information, as applicable, and any other information that may be pertinent, in the supporting documentation:

 

                    (A)  The acquisition history of the supplies or services, including sources, prices, quantities, and dates of award;

 

                    (B)  The circumstances which make it necessary to exclude the particular source from the contract action, including—

 

                          (1)  The reasons for the lack of or potential loss of alternative sources; e.g., the technical complexity and criticality of the supplies or services; and

 

                          (2)  The current annual requirement and projected needs for the supplies or services;

 

                    (C)  Whether the existing source must be totally excluded from the contract action or whether a partial exclusion is sufficient;

 

                    (D)  The potential effect of exclusion on the excluded source in terms of loss of capability to furnish the supplies or services in the future;

 

                    (E)  When FAR 6.202(a)(1) is the authority, the basis for—

 

                          (1)  The determination of future competition; and

 

                          (2)  The determination of reduced overall costs.  Include, as a minimum, a discussion of start-up costs, facility costs, duplicative administration costs, economic order quantities, and life cycle cost considerations; and

 

                    (F)  When FAR 6.202(a)(2) is the authority—

 

                          (1)  The current annual and mobilization requirements for the supplies or services, citing the source of, or the basis for, the data;

 

                          (2)  A comparison of current production capacity with that necessary to meet mobilization requirements;

 

                          (3)  An analysis of the risks of relying on the present source; and

 

                          (4)  A projection of the time required for a new source to acquire the necessary facilities and achieve the production capacity necessary to meet mobilization requirements.

 

              (ii)  A sample format for Determination and Findings citing the authority of FAR 6.202(a) is in Table 6-1, Determinations and Findings.

 

 

 

TABLE 6-1, DETERMINATIONS AND FINDINGS

 

Determination and Findings

 

Authority to Exclude a Source

 

In accordance with 10 U.S.C. 2304(b)(1), it is my determination that the following contract action may be awarded using full and open competition after exclusion of ____________________*:

 

(Describe requirement.)

Findings

 

The exclusion of _____________________*

 

Alternate 1:  will increase or maintain competition for this requirement and is expected to result in a reduction of $__________ in overall costs for the present and future acquisition of these supplies or services.  (Describe how estimate was derived.)

 

Alternate 2:  is in the interest of national defense because it will result in having a supplier available for furnishing these supplies or services in case of a national emergency or industrial mobilization.  (Explain circumstances requiring exclusion of source.)

 

Alternate 3:  is in the interest of national defense because it will result in establishment or maintenance of an essential engineering, research or development capability to be provided by an educational or other nonprofit institution or a federally funded research and development center.  (Explain circumstances requiring exclusion of source.)

 

*  Identify source being excluded.

 

 

 

206.203  Set-asides for small business concerns.

 

      (b)  Also no separate justification or determination and findings is required for contract actions processed as historically black college and university and minority institution set-asides (see 226.7003).

 

 

 