Weekly Highlights for June 2 – 6, 2003

 

Activities Underway

 

Office of Safeguards and Security Evaluations (OA-10)

 

Richland/Hanford and Pacific Northwest National Laboratory inspection activities:  Final on-site data collection and out briefing will be conducted as scheduled.

 

Classified Matter Protection and Control Special Reviews:  Comments were received this week on the draft results for the Lawrence Livermore National Laboratory CMPC Special Review.  Comments will be incorporated and a letter will be drafted for management approval next week.

 

Sandia National Laboratory-New Mexico Special Review:  Data collection activities are on-going this week in support of the special review of SNL-NM security management practices.  Activities included document reviews and interviews.  The next on-site data collection phase will be conducted as scheduled.  This review is being conducted following interest expressed by Senator Grassley. 

 

Composite Adversary Team training:  Prospective attendees are being confirmed and various logistical issues are being resolved in preparation for the next CAT training.

 

Y-12 Safeguard and Security Inspection:  Planning activities have begun for the Safeguard and Security Inspection of Y-12 including preparation of a draft resource list.  A scoping visit for this inspection has been scheduled.

 

The OA-10 staff member detailed to the Department of Homeland Security (DHS) is developing standard operating procedures for the DOE desk at the DHS Emergency Operations Center.

 

Office of Cyber Security Evaluations (OA-20)

 

Perimeter Scanning Project:  OA-20, in partnership with the Office of the Chief Information Officer, is conducting a special study (Perimeter Scanning Project) to map out and characterize DOE’s network perimeter.  This effort is being undertaken to establish a baseline understanding of the magnitude and make-up of DOE computer systems exposed to the Internet in order to improve the Department’s protection posture.  Testing has been completed for 38 DOE sites.  Testing is currently ongoing at several additional sites. 

 

Cyber Security Inspection of the Hanford Site and Pacific Northwest National Laboratory:  OA-20 is conducting cyber security inspections at the Hanford Site and the Pacific Northwest National Laboratory.  Data collection activities have been completed.  Draft inspection reports are undergoing management review.  This is part of a combined Safeguards and Security and Cyber Security Inspection. 

 

Special Study of the Security of Wireless Computer Networking:  OA-20 is preparing a special study report to describe policy, technical issues, and improvement recommendations as they relate to the security of wireless computer networking devices within DOE.  An initial draft of the special study is undergoing management review.

 

Unannounced Cyber Security Penetration Testing:  OA is developing an unannounced cyber security penetration testing capability to supplement routine announced inspections.  OA-20 has established program documentation and draft agreements that will serve as the basis for the unannounced penetration testing program.  These documents are undergoing management review.  OA-20 anticipates the commencement of unannounced testing during this summer.  Managers at several DOE organizations have volunteered as participants. 

 

Office of Emergency Management Oversight (OA-30)

 

Inspection of the East Tennessee Technology Park:  OA-30 and OA-50 have completed the onsite phase of the inspection of the East Tennessee Technology Park.  The initial draft report was provided to line management at the closeout on May 22.  Final validation comments are due June 13.

 

Combined Inspection of the Idaho National Engineering and Environmental Laboratory (INEEL):  OA-30 and OA-50 continue planning for a combined inspection of INEEL.  INEEL planning and inspection scoping discussions are being held routinely with the Office of Nuclear Energy, Science and Technology, the Idaho Operations Office, and with Bechtel BWXT Idaho.  The onsite scoping visit was completed from June 3-5, 2003.  Stakeholder input was solicited from site labor organizations; the Snake River Alliance; the Citizens Advisory Board; the Shoshone-Bannock Tribes; and the State of Idaho INEEL Oversight Program.

 

Consideration of Emergency Management Program Special Reviews:  OA-30 is evaluating options to conduct inspections focused on emergency management program elements, long-standing performance weakness, or areas of special interest. 

 

Inspection Schedule:  OA has cancelled the scoping visit for the combined emergency management and ES&H inspection at the Rocky Flats Site and is re-evaluating when it might be rescheduled.  If an inspection is conducted at Rocky Flats in 2003, it will be an ES&H inspection only.  Pending determination on emergency management special review(s), OA-30 is still planning to conduct the scheduled inspections of the Office of Secure Transportation and Savannah River Site.

 

Office of Environment, Safety and Health Evaluations (OA-50)

 

Sandia National Laboratories – New Mexico Inspection:  The final report was transmitted to the site on April 7.  An approved corrective action plan (CAP) is due on June 6th.  An interim CAP on the emergency management findings was provided to OA for review and comment.  A sample CAP was provided to the site in order to assist in their CAP development efforts.

 

Y-12 National Security Complex Inspection:  The final report was distributed on May 9.  An approved corrective action plan is due on July 7th.

 

East Tennessee Technology Park Inspection:  The draft report was provided to the site on May 22 for a 10-day review period to provide written factual accuracy comments.  This was a combined review with OA-30 where OA-30 has the overall lead.

 

Idaho National Engineering and Environmental Laboratory Inspection:  The scoping visit was conducted on June 3-5.  This is a combined review with OA-30 where OA-30 has the overall lead.

 

Suspect/Counterfeit Items (S/CI) Special Study:  The special study will be conducted in two phases encompassing both the Department’s headquarters and field elements of the S/CI program.  The headquarters phase of the study continues.  Planning continues for the field element phase with the first onsite reviews being conducted at Los Alamos National Laboratory and Savannah River Site.

 

Nevada Test Site Request for Inspection:  The Nevada Site Office manager submitted a request for an inspection of the site work for others program.  The request is under review.

 

Activities Completed

 

Office of Safeguards and Security Evaluations (OA-10)

 

The ANL-W final corrective plan was reviewed and a response was sent.

 

Office of Emergency Management Oversight (OA-30)

 

Emergency Management Oversight Appraisal Process Guide:  OA-30 has updated the Emergency Management Oversight Appraisal Process Guide.  The March 2003 edition reflects the requirements of DOE Order 470.2B and establishes an inspection records management process.  The guide is available on the OA website.

 

Office of Environment, Safety and Health Evaluations (OA-50)

 

IG Request for Contacts:  Site contact information was provided to the IG for 15 findings contained in the Corrective Action Tracking System database in response to a request in support of their review activities.