Weekly Highlights for August 12 - 16, 2002

 

Activities Underway

 

Office of Safeguards and Security Evaluations (OA-10)

 

OTS/AL Comprehensive Inspection:  Conducted a pre-planning/coordination meeting at GTN, topic teams continue to coordinate with site POCs and team members, the inspection plan was approved and dispatched to the site, and topic teams have begun their review of requested documents.

 

CMPC Special Reviews:  The Headquarters and SNL-NM draft reports have been prepared for management’s review scheduled for August 19th.

 

ANL-W Comprehensive Inspection:  Updated the team resource list, developed the document request list and forwarded to CH and ANL-W, continued work on hotel accommodations, and continued work on additional administrative memoranda.

 

Several of the workstations have been installed to aid in making the final modifications to and testing of the operating system of the OA classified local area network.  Work by the system engineer to review system architecture and develop system security and test documentation will begin in the near future.

 

The review of the final Pantex CAP continues.

 

Action to modify the OA-10/Eagle Research-developed BATLE neutralization computer code continues.

 

Office of Cyber Security and Special Reviews (OA-20)

 

OA-20 is continuing with AL/OTS planning, including:

-Review of the document call

-PTA sent to AL ISOM for signature

-Conference call with AL personnel for scoping

 

OA-20 is reviewing comments from the field on the status of the classified cyber security program for GISRA.

 

OA-20 is continuing to migrate the OA-20 portal to a permanent hardware platform.

 

OA-20 continues to support OA-10’s Secure LAN development.

 

OA-20 is continuing to work on the PSP project data/dictionary database.

 

Office of Emergency Management Oversight (OA-30)

 

OA-30 and OA-50 continue to plan for the combined review at the Nevada Test Site.  A planning visit is scheduled for August 27–28, 2002.

 

OA-30 is in the initial stages of planning for an evaluation of the Office of Transportation Safeguards corrective action for emergency response to address the Judgment of Need from the Accident Investigation Report dated June 1999 of the Special Agent Fatality at Southeast Courier Section.  As part of the Type A investigation, OA-30 is specifically tasked to perform an evaluation of the corrective action taken within 90 days of line management verification.

 

OA-30 and OA-50 continue to plan for the combined review at Pantex.  The scoping visit is planned for the week of August 26.

 

The on-site data collection phase of the OA-30 and OA-50 review at the Waste Isolation Pilot Plant was completed August 9.  The draft inspection report has been prepared and submitted to the OA internal Quality Review Board.  On-site validation of the draft report will be conducted the week of August 19.

 

Office of Environment, Safety and Health Evaluations (OA-50)

 

OA-50 staff will revise the report that analyzes independent environmental protection program assessments that have been conducted at DOE facilities over the past several years.

 

Discussion continues between the Director of OA-50 and various site managers concerning the OA inspection team augmentation program.  Discussions are underway with OAK management to utilize an OAK staff member to supplement the Pantex inspection team.

 

Comments on the revised DOE Order 470.2B, “Independent Oversight and Performance Assurance Program” were received from the FMC.  Meetings are being scheduled with various organizations to seek final resolution.

 

The Corrective Action Plan (CAP) for the Hanford (PFR specific) safety management inspection was due on May 28.  EM had previously rejected the CAP and requested that a revised CAP be submitted to EM by June 27.  The approved CAP has not yet been received

 

A final corrective action plan for the ANL-East safety and emergency management inspection has been requested.  The final corrective action plan is due on August 27.

 

Safety and emergency management inspection at LLNL -- Factual accuracy comments on the draft report were reviewed and changes made to the report as appropriate.  The team leader provided comments to the site on the preliminary corrective action plan.  The OA-50 Office Director briefed the Acting Administrator for NNSA on the LLNL results.  The final report will be issued the week of August 19 and this briefing served as a pre-publication briefing for NNSA.

 

Coordination of the upcoming safety and emergency management inspection at NTS continues.

 

Validation and closeout activities for the safety and emergency management inspection at WIPP are scheduled for August 21.

 

OA has requested an overall schedule of activities and copies of completed reports regarding the status of line actions taken to address the DNFSB concerns on the effectiveness of ISM for BJC activities at ORO.  Many of the documents have been recovered, but an overall schedule is yet to be provided.  A follow-up meeting will be scheduled upon receipt of all of the requested documents.

 

Coordination and exchange of management systems strategies between OA and the Nuclear Safety Directorate in the United Kingdom continue.  Areas of mutual benefit include inspections and review methodologies and exchanges, safety performance indicators, measuring contractor performance, and training of and exchange of inspectors.  Senior OA managers traveled to the UK on July 26 – August 3 to conduct exchange activities that included tours and discussions at the Sellafield, UKAEA, Burghfield and Aldermaston sites.  The current exchange activities are being conducted under the umbrella of the 1958 Agreement between the United States and the United Kingdom.  Efforts are now under way to develop a more formal technical exchange agreement between OA and the Nuclear Installation Inspectorate (NII) in the areas of nuclear safety and security operations.

 

Activities Completed

 

Office of Safeguards and Security Evaluations (OA-10)

 

Members of the OA-10 staff met with DOE IG personnel to discuss the IG’s ongoing review of DOE protective forces.

 

Completed the support mission for the NNSA site analysis at LANL.

 

MC&A team leader briefed OA-10 management on a propose special review and the inclusion of table top exercises during the ANL-W comprehensive inspection (October 21-November 1).

 

Comments on draft order 142.X, UVF&A have been approved and put into REVCOM.

 

Office of Cyber Security and Special Reviews (OA-20)

 

OA-20 attended the Hamre Commission recommendation status meeting.

 

OA-20 issued the draft GISRA status report on the DOE classified cyber security program to the field for comments.

 

OA-20 issued the draft SecureNet report for comments.

Office of Environment, Safety and Health Evaluations (OA-50)

 

AAAHC re-accreditation and consultation reviews with Sandia New Mexico and Sandia California have been scheduled for December 4‑6, 2002 respectively.