PINE CREEK LAKE
MONTHLY LAKE REPORT
APR 96
POOL ELEVATIONS STORAGE RELEASES EVAP INFLOW RAINFALL
DAY FT-NGVD 2400HR DSF INCHES ADJ INCHES
0800 2400 AC-FT POWER TOTAL 8A TO 8A DSF 7A TO 7A
DAM BSN
PRIOR MONTH 442.95 74993
1 443.03 442.85 74519 0 877 0.140 650 0.00 0.00
2 442.79 442.40 72386 0 1324 0.100 300 0.00 0.00
3 442.19 442.01 70537 0 1318 0.370 500 0.00 0.00
4 442.22 441.98 70400 0 1317 0.790 1300 0.79 0.51
5 441.83 442.13 71106 0 523 0.230 900 0.00 0.00
6 442.23 442.36 72196 0 69 0.050 650 0.00 0.00
7 442.38 442.42 72481 0 69 0.170 500 0.00 0.00
8 442.43 442.60 73334 0 69 0.180 300 0.00 0.00
9 442.70 442.55 73097 0 415 0.180 300 0.00 0.00
10 442.51 442.41 72433 0 610 0.100 300 0.00 0.01
11 442.38 442.35 72149 0 610 0.300 300 0.00 0.00
12 442.35 444.50 82830 0 441 0.260 5800 0.00 0.00
13 445.84 447.50 99650 0 874 0.200 9500 1.40 2.17
14 448.05 447.96 102410 0 2476 0.200 4000 0.10 0.03
15 447.95 447.10 97250 0 4283 0.200 1700 0.00 0.01
16 446.87 445.85 90098 0 5263 0.080 1700 0.00 0.13
17 445.24 444.45 82569 0 5195 0.220 1441 0.00 0.01
18 443.65 443.67 78573 0 3306 0.270 1300 0.00 0.00
19 443.67 443.60 78224 0 1059 0.190 900 0.00 0.00
20 443.58 443.52 77825 0 843 0.200 700 0.00 0.44
21 443.50 443.34 76927 0 842 0.200 425 0.00 0.00
22 443.28 443.61 78274 0 843 0.240 1600 0.05 0.33
23 443.68 444.06 80533 0 1640 0.300 2800 0.59 0.87
24 444.08 443.58 78124 0 2788 0.420 1600 0.00 0.00
25 443.40 442.74 73998 0 3304 0.250 1250 0.00 0.00
26 442.49 442.42 72481 0 1623 0.250 900 0.00 0.00
27 442.46 442.50 72860 0 351 0.270 600 0.00 0.00
28 442.35 442.61 73381 0 352 0.220 600 0.00 0.00
29 442.45 442.63 73476 0 352 0.130 475 0.00 0.39
30 442.63 442.84 74472 0 352 0.450 900 0.00 0.01
TOTAL 0 43389 7.160 44191 2.93 4.91
AVERAGE 443.48 0 1446 1473 NORMAL= 4.92
MAXIMUM 448.05 102963 DATE=14 TOP CONSERVATION POOL 442.50
MINIMUM 441.83 69722 DATE= 5 TOP FLOOD POOL 480.00
INFLOW VOLUME= 87652 AC-FT
SEASONAL POOL ELEV TRANSITION FROM 440.50 ON 1ST TO 442.50 ON 30TH.
REPORT IS SUBJECT TO CHANGE AND/OR REVISION