1 NPD RESERVOIR CONTROL CENTER PROJECT- LIB LIBBY DAM & LAKE KOOCANUSA HOURLY OPERATION DATA REPORT FRIDAY JANUARY 9, 2009 GROSS STA ------ OUTFLOW ------ EL AT POWERHOUSE AVG SUPR UNIT STATUS GEN USE -- IN KCFS -- IN FEET + MSL HEAD CAP ON ON MW MW TOTAL POWER SPILL FOREBAY TAILWATR FT MW RMT LINE AVL HOUR 1 1 4.00 4.00 0.00 2410.58 2117.92 292.66 1 2 1 4.00 4.00 0.00 2410.59 2117.92 292.67 2 3 1 4.00 4.00 0.00 2410.56 2117.92 292.64 3 4 1 4.00 4.00 0.00 2410.55 2117.92 292.63 4 5 1 4.00 4.00 0.00 2410.54 2117.92 292.62 5 6 1 4.00 4.00 0.00 2410.54 2117.92 292.62 6 7 1 4.00 4.00 0.00 2410.54 2117.92 292.62 7 8 2 4.00 4.00 0.00 2410.54 2117.92 292.62 8 9 2 4.00 4.00 0.00 2410.52 2117.92 292.60 9 10 2 4.00 4.00 0.00 2410.53 2117.92 292.61 10 11 11 12 12 13 13 14 14 15 15 16 16 17 17 18 18 19 19 20 20 21 21 22 22 23 23 24 24 TOT 24 13 AVG 1 4.00 4.00 0.00 2410.55 2117.92 292.63 MAX 4.00 4.00 0.00 2410.59 2117.92 292.67 MIN 4.00 4.00 0.00 2410.52 2117.92 292.60