About DOE Button Organization Button News Button Contact Us Button
Link: Energy home page
Science and Technology Button Energy Sources Button Energy Efficiency Button The Environment Button Prices and Trends Button National Security Button Safety and Health Button
OFFICE OF HEALTH, SAFETY AND SECURITY DEPARTMENTAL REPRESENTATIVE TO THE DNFSB
Text size: Smaller - Normal - Larger - Largest You are Here:  DOE > HSS > Departmental Representative
Departmental Representative
to the DNFSB

Home

Welcome

Archive

Chronological Listing
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1990-1999

Board Recommendations

Board Recommendations
Rec.2008-1
Rec.2007-1
Rec.2005-1
Rec.2004-2
Rec.2004-1
Rec.2002-3
Rec.2002-1
Rec.2001-1
Rec.2000-1
Rec.1992-4

Public Meetings on Oversight

Public Meetings on Safety in Design

SIMS

SIMS Logon
Letter Commitments
Recommendation Commitments

Board Review of Directives

About Our Office

Mission and Functions
DOE Policy on Board Interaction
Recommendation Contact
DOE Site Contacts
Our Office Contact
Site Assignments
Office Assignments
Office Personnel
DOE/DNFSB Interface Workshop
Web Sites Related to Our Office

Interface Manual

About the Board

General Description
Board Members
Board Mission and Functions
Board Enabling Legislation
Board Safety Oversight Principles
Board Policy Statements
Board Strategic Plan
Board Performance Plan
Board Performance Report
Performance & Accountability Rpt.
Board Web Site
Road Map to the Board

Board Web Site

Contact Us

DepRep News

Quick Reference

Facility Representative

Federal Technical Capability Panel

DOE Integrated Safety Management

DOE Directives, Regulations, and Standards

DOE Phone Book

HSS Logo
 

Information Archive Homepage
RECOMMENDATION DOCS. 
 

Rec. 94-1
Improved Schedule for Remediation

  • 94-1 BY YEAR:
2009 2008 2007 2006 2005 2004 2003 2002 
 2001 2000 1999 1998 1997 1996 1995 1994 
              This page last updated Tuesday, December 02, 2008



relathead.jpg (9059 bytes)

2009
No document links for 2009

2008
  • April 29,  2008, Board Letter closing Recommendation 94-1, Improved Schedule for Remediation in the Defense Nuclear Facilities Complex[HTML] [PDF] [DOC]

2007
No document links for 2007

2006
No document links for 2006

2005
No document links for 2005

2004
  • March 3,  2004, Board letter establishing a 58-day reporting requirement requesting information and a revised implementation plan regarding sludge removal from the K-Basins relative to implementation plan 2000-1, Prioritization for Stabilizing Nuclear Materials[HTML] [PDF] [DOC]

2003
  • May 27,  2003, Department letter regarding transition of the 94-1 Research and Development Program. [HTML] [PDF] [DOC]
  • March 20,  2003, Board letter establishing a 60-day reporting requirement regarding mission and funding level of the 94-1 Research and Development Program relative to the 94-1 and 2000-1 implementation plan. [HTML] [PDF] [DOC]
  • March 7,  2003, Board letter forwarding a staff report reviewing Operational Readiness Reviews for the startup of K-Basin Fuel Transfer System. [HTML] [PDF] [DOC]
  • February 6,  2003, Board letter establishing a 15-day reporting requirement regarding the proper sealing of the Multi-Canister Overpacks at the Hanford Site. [HTML] [PDF] [DOC]

2002
  • December 31,  2002, Board letter regarding the Department's report on inactive actinide materials at the NNSA facilities. [HTML] [PDF] [DOC]
  • November 1,  2002, Department letter reporting completion of 2000-1 implementation plan milestone on stabilization and packaging of solutions at the Hanford Plutonium Finishing Plant (PFP). [HTML] [PDF] [WPD]
  • August 9,  2002, Board letter establishing a 30-day reporting requirement regarding issues related to material stabilization at the Los Alamos National Laboratory and Revision 2 of the 2000-1 implementation plan. [HTML] [PDF] [WPD]
  • July 22,  2002, Department letter enclosing Revision 2 of the 2000-1 implementation plan. [PDF]
  • June 11,  2002, Board letter enclosing a staff issue report on stabilization activities at the Hanford Plutonium Finishing Plant relative to the 2000-1 Implementation Plan. [HTML] [PDF] [WPD]
  • June 5,  2002, Board letter enclosing a staff issue report on the results of a review of maintenance activities at the Hanford Spent Nuclear Fuel Project. [HTML] [PDF] [WPD]
  • May 22,  2002, Board letter commending the Department and the Rocky Flats Environmental Technology Site for completing stabilization and repackaging of more than 100 metric tons of plutonium-bearing residues relative to Implementation Plan 94-1. [HTML] [PDF] [WPD]
  • May 20,  2002, Board letter establishing a 120-day reporting requirement addressing the issues outlined in the letter and the enclosed staff report regarding the management of inactive nuclear materials at the Department's Nuclear Weapons Laboratories. [HTML] [PDF] [WPD]
  • April 18,  2002, Department letter responding to Board letter dated February 15, 2002 regarding the planned Multi-Canister Overpacks (MCO) welding at the Hanford Spent Nuclear Fuel Project. [HTML] [PDF] [WPD]
  • February 15,  2002, Board letter establishing a 60-day reporting requirement regarding Multi-Canister Overpack (MCO) in relation to Recommendation 94-1, Improved Schedule for Remediation in the Defense Nuclear Facilities Complex. [HTML] [PDF] [WPD]

2001
2000
  • December 28, 2000, Department letter regarding the removal of spent nuclear fuel from the KW Basins at Hanford Site relative to recommendations 94-1 and 2000-1.  [HTM] [WPD] [PDF] 
  • December 6, 2000, Department letter regarding the fuel removal operations from the K Basins at the Hanford Site.  [HTM] [WPD] [PDF] 
  • December 6, 2000, Department letter responding to Board letter dated December 5, 2000 in relation to the fuel removal operations from the K Basins in Hanford.  [HTM] [WPD] [PDF] 
  • December 5, 2000, Board letter regarding the Hanford Spent Nuclear Fuel Project relative to the vulnerabilities identified in Recommendation 94-1, Improved Schedule for Remediation.  [HTM] [WPD] [PDF] 
  • July 14, 2000, Board letter forwarding its review on the Department's implementation plan for 2000-1 and 94-1 submitted to the Board on May 31, 2000.  [HTM] [WPD] [PDF] 
  • July 10, 2000, Board letter enclosing a staff issue report on the preparations for stabilization of materials at Molten Salt Reactor Experiment relative to Implementation Plan 94-1.  [HTM] [WPD] [PDF] 
  • June 9, 2000, Department letter informing the early completion of Commitment 701 of Implementation Plan 94-1 and enclosing the closure package for said commitment.  [HTM] [WPD] [PDF] 
  • June 8, 2000, Department letter enclosing Revision 3 of Implementation Plan for remediating the nuclear materials identified in 94-1 and 2000-1. It also proposes the closure of Recommendation 94-1.  [HTM] [WPD] [PDF] 
  • March 1, 2000, Department letter forwarding completion of Commitment 121 in Implementation Plan 94-1, Revision 2. It documents the Department's rationale for no change to the completion date of August 2002 for the completion of polycube stabilization.  [HTM] [WPD] [PDF] 
  • February 16, 2000, Department letter forwarding the completion of Commitment 113, Document a Decision for Polycubes Stabilization Path Forward, included in the Implementation Plan for Board Recommendation 94-1, Revision 2.  [HTM] [WPD] [PDF] 
  • February 1, 2000, Department letter forwarding Revision 2 of the Implementation Plan for Board Recommendation 94-1, Remediation of Nuclear Materials in the Defense Nuclear Facilities Complex.  [HTM] [WPD] [PDF] 

1999

  • December 14, 1999, Board letter forwarding a staff issue report on the review of progress on the implementation of Recommendation 94-1 at Los Alamos National Laboratory. [HTML] [WP] [PDF]
  • November 15, 1999, Board letter responding to DOE's reply to the Board's letter dated September 22, 1999 regarding issues discussed during the recent public meeting on Recommendation 94-1. [HTML] [WP] [PDF]
  • November 5, 1999, Department letter forwarding report on the early completion of Commitment 302 found in Implementation Plan 94-1. [HTML] [WP] [PDF]
  • October 15, 1999, Department letter forwarding replies to questions relative to issues discussed during the 94-1 Public Meeting held on September 9, 1999. [HTML] [WP] [PDF]
  • September 29, 1999, Department letter regarding RFETS PuSPS's ability to meet the DOE-STD-3013-96 requirement to limit the contamination level of the outer surface of the inner can as defined in 10 CFR 835. [HTML] [WP] [PDF]
  • September 22, 1999, Board letter forwarding comments on the necessary actions to resolve issues hindering implementation of recommendation 94-1. [HTML] [WP] [PDF]
  • September 20, 1999, Department letter responding to a July 8th Board letter concerning completion of the Hanford Spent Nuclear Fuel Project. [HTML] [WP] [PDF]
  • September 17, 1999, Department letter reporting completion of commitment 104 per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • September 2, 1999, Department letter forwarding a report on the on-schedule completion and proposed closure of Commitment 310 per the 94-1 Implementation Plan. [HTML] [WP] [PDF]
  • August 27, 1999, Board letter forwarding a staff issue report on plutonium stabilization and packaging system review. [HTML] [WP] [PDF]
  • August 11, 1999, Board announcement of a Public Hearing scheduled for September 9, 1999, 9:00am regarding the status of the Department's implementation plan for Recommendation 94-1. [HTML] [WP] [PDF]
  • July 30, 1999, Department letter forwarding commitment 301 per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • July 22, 1999, Department letter forwarding the Integrated Project Management Plan per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • July 8, 1999, Board letter forwarding a staff issue report on the design and safety analysis issues associated with the Hanford Spent Nuclear Fuel Project. [HTML] [WP] [PDF]
  • July 2, 1999, Department letter forwarding a report on issues related to material stabilization activities at Savannah River Site. [HTML] [WP] [PDF]
  • June 14, 1999, Department letter forwarding completion of a commitment per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • May 27, 1999, Board letter closing of Recommendation 94-3. [HTML] [WP] [PDF]
  • May 27, 1999, Board letter providing expectations for the Department to further address stabilization plans for neptunium solutions, plutonium metals and oxides. [HTML] [WP] [PDF]
  • May 14, 1999, Board letter regarding the consruction of the Actinide Packaging and Storage Facility at the Savannah River Site. [HTML] [WP] [PDF]
  • April 12, 1999, Department letter forwarding completed commitments per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • March 26, 1999, Department letter forwarding response to Board letter dated January 28, 1999, regarding the conditional acceptance of the 94-1 implementation plan. [HTML] [WP] [PDF]
  • March 25, 1999, Board letter forwarding a staff issue report regarding the schedule progress for the Hanford Spent Nuclear Fuel Project per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • February 26, 1999, Department letter regarding commitment to remove uranium deposits from the Auxiliary Charcoal Bed of the Molten Salt Reactor Experiment per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • January 28, 1999, Board letter accepting the 94-1 implementation plan with conditions, and establishing a 60-day reporting requirement on the effects of delays in construction of the Actinide Packaging and Storage Facility at Savannah River. [HTML] [WP] [PDF]

1998

  • December 28, 1998, Department letter forwarding the 94-1 implementation plan, revision 1. [HTML] [WP] [PDF]
  • October 20, 1998, Department letter forwarding technical update of the Implementation Plan for Recommendation 94-1. [HTML] [WP] [PDF]
  • October 8, 1998, Board letter forwarding comments on the Department's technical update on Recommendation 94-1. [HTML] [WP] [PDF]
  • October 2, 1998, Secretary memorandum regarding expectations in revising the 94-1 implementation plan. [HTML] [WP] [PDF]
  • September 11, 1998, Department letter forwarding its response to a Board letter regarding PFP (Recommendation 94-1). [HTML] [WP] [PDF]
  • September 9, 1998, Department letter forwarding a report on the status of Recommendation 94-1 milestones at the PFP and its efforts in place to improve the readiness review process. [HTML] [WP] [PDF]
  • September 2, 1998, Department letter forwarding the technical update per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • July 30, 1998, Department letter providing update on current status of milestones and plans to revise the 94-1 implementation plan. [HTML] [WP] [PDF]
  • July 13, 1998, Board letter establishing 60-day reporting requirements on recovery of plutonium stabilization activities at Hanford PFP in accordance with the 94-1 implementation plan. [HTML] [WP] [PDF]
  • July 10, 1998, Board letter establishing 45-day reporting requirements on americium/curium solution stabilization at the Savannah River Site in accordance with the 94-1 implementation plan. [HTML] [WP] [PDF]
  • July 6, 1998, Department letter regarding Board staff observations regarding schedule performance per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • June 26, 1998, Board letter forwarding staff issue report on 233-S Operational Readiness Review at Hanford in response to recommendation 94-1. [HTML] [WP] [PDF]
  • June 23, 1998, Department letter forwarding the quarterly report for the period of January 1 through March 31, 1998, per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • June 5, 1998, Board letter regarding measures taken to ship plutonium-bearing compounds per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • June 3, 1998, Board letter regarding the Department's preparations for start-up of TRU waste disposal operations at WIPP. [HTML] [WP] [PDF]
  • June 2, 1998, Department letter forwarding material committed to at the May 7, 1998, Public Meeting on Recommendation 94-1. [HTML] [WP] [PDF]
  • May 14, 1998, Board announcement scheduling a Public Hearing regarding Recommendation 94-1 on June 2, 1998, 9:00 a.m. [HTML] [WP] [PDF]
  • May 5, 1998, Department letter concerning progress made on the 94-1 implementation plan. [HTML] [WP] [PDF]
  • May 1, 1998, Board letter regarding the Department's effort to develop a new standard for packaging and storage of plutonium-bearing materials per the 94-1 implementation plan. [HTML] [WP] [PDF]
  • April 15, 1998, Board letter forwarding comments concerning the Department's monthly progress report regarding operations in support of the 94-1 implementation plan at PFP (Hanford). [HTML] [WP] [PDF]
  • April 15, 1998, Board letter accepting the Departments proposal to delete three milestones from the 94-1 implementation plan. [HTML] [WP] [PDF]
  • March 18, 1998, Board forwards staff issue report on the review of the spent nuclear fuel project at the Hanford site (trip conducted February 3-5, 1998) (Rec. 94-1). [HTML] [WP] [PDF]
  • February 27, 1998, Department forwards its' Consolidated Annual Report of activities related to the implementation of  94-1 and 97-1 implementation plan. [HTML] [WP] [PDF]
  • January 30, 1998, Board letter forwarding Board staff's review of DOE's preparations for EUO restart at Y-12. [HTML] [WP] [PDF]
  • January 29, 1998, Board letter concerning future disposition of plutonium-bearing residues at RF and other nuclear facilities site.  [HTML] [WP] [PDF]
  • January 13, 1998, Department letter forwarding completion of implementation plan 94-1 milestone. [HTML] [WP] [PDF]
  • January 9, 1998, Department letter forwarding detailed discussion of the three remaining SRS 94-1 milestones. [HTML] [WP] [PDF]

1997

  • December 31, 1997, Department letter informing Board of change to 94-1 implementation. [PDF]
  • December 8, 1997, Board letter commenting on rate of progress on complex-wide integration of actions responding to recommendation 94-1. [HTML] [WP] [PDF]
  • November 18, 1997, DNFSB/TECH-17, Review of the Hanford Spent Nuclear Fuel Project (Recommendation 94-1). [PDF]
  • November 3, 1997, Department letter forwarding 94-1 implementation plan 10th Quarterly Report for the month of July 1 - September 31, 1997. [HTML] [WP] [PDF]
  • October 29, 1997, Department letter forwarding changes to 94-1 implementation plan regarding the safe storage of potentially critical materials at Oak Ridge reservation facilities. [PDF]
  • September 30, 1997, Department letter describing proposed modifications to 94-1 implementation plan at Rocky Flats. [PDF]
  • September 22, 1997, Department forwards Quarterly Report for 94-1 implementation plan covering the period of April 1 - June 30, 1997. [PDF]
  • September 18, 1997, Department letter regarding 94-1 implementation plan for commitments. [HTML]
  • September 17, 1997, Board letter of safe restoration of PFP at Hanford. [HTML]
  • September 2, 1997, Board letter agreeing to Department's changes to the 94-1 implementation plan. [HTML]
  • July 21, 1997, Department letter proposing modifications to provisions with in the 94-1 implementation plan. [HTML] [PDF]
  • May 12, 1997, Department letter reporting its progress towards implementation of 94-1 recommendation. [HTML]
  • April 30, 1997, Department forwards eighth Quarterly Report for 94-1 implementation plan. [PDF]
  • April 11, 1997, Board letter forwarding Board staff trip report [HTML] reviewing status of the spent fuel nuclear project at Hanford, dated April 29, 1996, prepared by Donald J. Wille. [HTML]
  • April 11, 1997, Board letter [HTML] forwarding Board staff trip report on the status of the spent nuclear fuel activities at Savannah River Site, dated May 28, 1996, prepared by Donald J. Wille. [HTML]
  • April 11, 1997, Board letter forwarding [HTML] Board staff trip report on status of Plutonium Residue Stabilization at Hanford, dated July 24, 1996, prepared by H. W. Massie, Jr. [HTML]
  • April 11, 1997, Board letter [HTML] forwarding Board staff trip report on Hanford Site - Spent Nuclear Fuel Project - Operational Readiness Review Planning and Vulnerability Assessment, dated June 10, 1996, prepared by Donald J. Wille. [HTML]
  • January 31, 1997, Department Annual Report for the period March 1 - December 31, 1996. [PDF]
  • January 31, 1997 Department letter forwarding the Annual Report for the period March 1 - December 31, 1996. [HTML]

1996

  • December 13, 1996, Department letter forwarding a detailed response to Board observations regarding spent nuclear fuel at the Savannah River Site, signed by Assistant Secretary Alm. [HTML]
  • December 5, 1996, Board forwards staff trip report on the status of spent nuclear fuel project at Hanford, prepared by D. J. Wille. [HTML]
  • November 27, 1996, Board forwards staff trip report on Americium/Curium stabilization at Savannah River Site, prepared by T. Davis. [HTML]
  • November 5, 1996, Department letter notifying Board of missed milestones 3.2-012 and 3.2-021. [HTML]
  • October 28, 1996, Department forwards sixth Quarterly Report June 1 - August 31, 1996 for 94-1 implementation plan. [HTML]
  • October 28, 1996, Department letter forwarding the sixth Quarterly Report. [HTML]
  • October 22, 1996, Board forwards staff trip report on residue processing at Rocky Flats, prepared by H. W. Massie, Jr. [HTML]
  • October 8, 1996, Board forwrds staff trip report on Deactivation and Decommissioning Plans for Buildings 771 and 779 at Rocky Flats Environmental Technology Site, prepared by T. L. Hunt. [HTML]
  • August 8, 1996, Department letter concerning 94-1 implementation plan. [PDF]
  • August 1, 1996, Department letter regarding the assignment of Hank Dalton to Rocky Flats. [PDF]
  • July 2, 1996, Department letter forwarding the 94-1 implementation plan fifth Quarterly Report. [PDF]
  • July 1, 1996, Department letter transmitting report on the facility utilization strategy for H-Canyon at the Savannah River Site. [PDF]
  • June 28, 1996, Board staff trip report on packaging and storage of Plutonium Metal and Oxide at the Savannah River Site, prepared by Roy Kasdorf. [HTML]
  • June 7, 1996, Board staff trip report on structural review of the Canister Storage Building at Hanford , prepared by A.H. Hadjian. [HTML]
  • May 31, 1996, Department transmitting the fifth Quarterly Report for 94-1 implementation plan, March 1 - May 31, 1996. [PDF]
  • May 15, 1996, Board letter acknowledging the Department's response to its DNFSB/TECH-9 report. [HTML] [PDF]
  • May 7, 1996, Department letter addressing proposed changes to the 94-1 implementation plan in regards to Rocky Flat's Stabilization of Plutonium Solutions Program. [PDF]
  • April 26, 1996, Department letter forwarding changes to the 94-1 implementation plan. [PDF]
  • April 23, 1996, Department letter forwarding the Annual Report of activities related to 94-1 implementation plan. [PDF]
  • April 23, 1996, Department forwarding Annual Report of activities related to 94-1 implementation plan for February 28, 1995 - February 29, 1996. [PDF]
  • April 9, 1996, Board letter relating to DOE's evaluation of new information regarding seismic analyses supporting the existing Authorization Bases for SRS's F- and H-Canyon. [HTML]
  • April 2, 1996, Department letter addressing current schedule for stabilizing Pu solutions at RFETS. [HTML]
  • March 1, 1996, Department letter forwarding Rocky Flats Solid Residue Stabilization Recovery Plan for 94-1 implementation plan. [PDF]
  • February 1, 1996, Senate letter urging the prompt response to 94-1 implementation plan commitment to stabilize the Mark 16 and Mark 22 spent fuel rods at SRS. [PDF]
  • January 31, 1996, Board letter requesting a detailed recovery plan. [HTML]
  • January 24, 1996, Department letter forwarding the third Quarterly Report for 94-1 implementation plan for the month of September 1 - November 30, 1995. [PDF]
  • January 24, 1996, Department forward third Quarterly Status Report for 94-1 implementation plan for the month of September 1- November 30, 1995. [PDF]
  • January 23, 1996, Board letter requesting report describing the Department's plans to define the future status of H-Canyon at Savannah River. [HTML]

1995

  • December 8, 1995, Board technical report DNFSB/TECH-9, Status of Highly Enriched Uranium Processing Capability at Building 9212 Oak Ridge Y-12 Plant, prepared by Daniel Ogg, et al. [HTML]
  • November 15, 1995, Board letter forwarding further views with respect to the Mark 16 and 22 fuel elements (Recommendation 94-1). [PDF]
  • November 7, 1995, Department letter reporting 4-week delay in completion of Milestone 3.2-020. [HTML]
  • November 30, 1995, Department forwards Quarterly Report for 94-1 implementation plan for month of June - August, 1995. [PDF]
  • November 16, 1995, Senate letter concerning the Department's handling of the 94-1 implementation plan. [PDF]
  • November 15, 1995, Board letter concerning the future of the F-Canyon and H-Canyon chemical processing facilities at Savannah River Site. [HTML]
  • October 2, 1995, Board staff trip report on process hazards review at the Vertical Calciner at Hanford's Plutonium Finishing Plant, prepared by Cliff Moore. [HTML]
  • September 28, 1995, Board staff trip report on spent nuclear fuel activities at Idaho National Engineering Laboratory, prepared by Lisa Stiles. [HTML]
  • September 7, 1995, Board staff trip report on solutions stabilization at Rocky Flats, prepared by Randall Robinson. [HTML]
  • August 11, 1995, Board letter forwarding comments on draft standards, Criteria for Safe Storage of Plutonium-Bearing Materials. [PDF]
  • July 19, 1995, Department forwards first Quarterly Report for 94-1 implementation plan. [PDF]
  • May 5, 1995, Board letter accepting 94-1 implementation plan, revision 1. [HTML]
  • March 31, 1995, Board staff trip report on DOE Trade Study meeting on the 94-1 Pu Storage Commitments (trip conducted March 21-22, 1995). [PDF]
  • March 28, 1995, Department memorandum on the status of integrated activities for the 94-1 implementation plan. [PDF]
  • February 28, 1995, Department letter forwarding the 94-1 implementation plan, revision 1. [HTML] [WP] [PDF]

1994

  • December 5, 1994, Department letter forwarding 94-1 implementation plan. [PDF]
  • December 5, 1994, Department forwarding implementation plan for Recommendation 94-1. [PDF]
  • November 15, 1994, Board letter commenting on activities at the Plutonium Finishing Plant at Hanford. [HTML]
  • August 31, 1994, Department letter accepting Recommendation 94-1. [HTML] [WP] [PDF]
  • July 20, 1994, Board letter granting the Department an extension to respond to comments on the treatment of radioactive substances. [HTML]
  • July 18, 1994, Department letter requesting a 45-day extension to respond to the treatment of radioactive substances. [HTML]
  • July 6, 1994, Board letter commenting on the treatment of radioactive substances stored in deteriorating conditions. [HTML]
  • June 3, 1994, Department memorandum informing program managers of a meeting on 94-1 recommendation. [PDF]
  • May 26, 1994, Board letter forwarding Recommendation 94-1. [HTML] [WP] [PDF]



  Security & Privacy Notice   •   HSS Information Inventory   •   HSS Organization                                      
The White House FirstGov.gov FirstGov.gov Spanish Version E-gov IQ FOIA
U.S. Department of Energy | 1000 Independence Ave., SW | Washington, DC 20585
1-800-dial-DOE | f/202-586-4403 |