Period |
Employer |
Position |
Major Accomplishments |
1/05 - Present |
Department of Energy |
Nuclear Engineer |
Compiled integrated plan
and schedule for implementing Safety in Design commitments.
Facilitated closure of
Recommendation 99-1 and 2002-2.
|
4/04-1/05 |
Bechtel (INEEL) |
Program Controls Manager |
Managed cost, schedule and
procurement groups for $10M Dept. of Homeland Security cyber security
program. |
8/97 - 4/04 |
Bechtel & Lockheed
Martin (INEEL) |
Project Manager |
Designed, built, tested and supported successful
operations of a unique $22M US Army facility for non-intrusively
assessing and repackaging suspect chemical warfare materiel. |
6/95 - 8-97 |
Lockheed Martin |
Systems Engineering Manager |
Managed design staff and architect/engineer
contractor for a 750,000 ft3 buried radiological waste pit
cleanup project at INEEL. |
6/90 - 12/94 |
Stone & Webster
Engineering Corporation |
Operations Support Manager |
Supervised 3 managers and 25 personnel providing
technical and operations support services to DOE for K Reactor restart
and DWPF startup. |
9/85 - 6/90 |
Stone & Webster
Engineering Corporation |
Site Engineering Manager |
Managed 110 person onsite design and engineering
office at the Enrico Fermi Atomic Power Station. |
6/81 - 9/85 |
Stone & Webster
Engineering Corporation |
Lead
Mechanical Engineer |
Managed 120 person mechanical design and
engineering group for the River Bend Station nuclear power plant
project during construction and startup testing. |
6/78 - 5/81 |
Stone & Webster
Engineering Corporation |
Engineering
Assurance Engineer |
Provided QA services to the River Bend Station
nuclear power plant project engineering and design organization.
Served as project point of contact for external, e.g. NRC, ASME, and
client technical audits. |
6/74 - 5/78 |
Stone & Webster
Engineering Corporation |
Nuclear Group Engineer |
Prepared design and procurement documents for
safety related commercial nuclear reactor support systems. |
10/72 - 5/74 |
Stone
& Webster Engineering Corporation |
Licensing
Assistant |
Supported compilation of the Preliminary Safety
Analysis report for the River Bend Station nuclear power plant. |
4/66 - 4/72 |
United
States Navy |
Reactor
Operator |
Qualified
Reactor Operator. Supervised 12 persons supporting nuclear operations
and maintenance as Lead Petty Officer |