Alturas Field Office

NEPA 2004

The following is a list of ongoing and completed projects for the Alturas Field Office. The level of analysis are:
  • CX=Categorical Exclusion-The project falls into one of several categories of minor, routine projects excluded from needing more analysis. Each time a specific categorical exclusion is used, the required review must be prepared.   
  • EA=Environmental Assessment-An EA must be prepared for proposed actions that (1) are not exempt from NEPA, (2) have not been categorically excluded, (3) have not been covered in an existing Resource Management Plan EIS or other environmental
    analysis, or (4) do not normally or obviously required an EIS. An EA may be prepared for any action at any time to assist in planning and decision making. A Finding of No Significant Impact (FONSI) is prepared if the criteria are met.   
  • EIS=Environmental Impact Statement-When a proposed action, including a proposed policy or legislative recommendation, is
    projected to have a significant impact on the quality of the human environment, an EIS must be prepared. An EIS is intended to provide decision makers and the public with a complete and objective evaluation of significant environmental impacts, both
    beneficial and adverse, resulting from a proposed action and all reasonable alternatives. An EIS is a major vehicle for fulfilling the substantive environmental goals set forth in NEPA.
Comment/Appeal Period

The Field Office Manager has the discretion to determine whether or not the EA and FONSI should be made available for public review prior to making a final decision, as defined in the CEQ regulations (40 CFR 1501.4(e)(2)). Program-specific guidance should also be consulted to determine if the EA and FONSI must be reviewed by the public prior to a decision. The manager must notify the public, including affected State and local governments and Indian tribes, of the review period (40 CFR 1506.6). The comment period for an EA is generally 30 days. If a public review is determined unnecessary, the affected and interested public must be notified of the availability of the EA and the FONSI (40 CFR 1501.4(e)(1) and 1506.6). The manager responsible for authorizing the action determines the appropriate means for notifying the public and ensuring availability based on the extent of concern and interest in the action. Any person who is adversely affected by the decision has the right to appeal within 30 days of the signing of the Decision Record (DR) (43CFR 4.410(a) and 43 CRF 4.411(a)).
 

Alturas Field Office NEPA Compliance Roster FY 2004

Number
Type

Project
Name

Project
Description
Project
Lead
Start
Date
Staff
Comment Due
FONSI/
DR/CX
Signed

Appeal
Period
Over
Comments/
Status
CA320-
NEPA 04-01
CX
South Knob
Treatment
Fuels Treatment
Hall
10/20/03
11/05/03
.
N/A
.
CA320-
NEPA 04-02
CX
Briener Ditch
Culvert
Culvert Installation
on Private ROW
Prisco
10/22/03
11/05/03
10/23/03
N/A
.
CA320-NEPA 04-03
EA
Cedar Creek
Juniper
Treatment
Manual/Mechanical
Treatment of Juniper
Hall
12/08/03
.
.
.
.
CA320-NEPA 04-04
CX
Blue Fire
Fence
Exclosure
Exclosure for Tree
Planting
Hall
11/05/03
N/A
12/26/03
N/A
.
CA320-NEPA 04-05
CX
Widow Peak
Line Blazing
Property Boundary
Identification
Hall
11/05/03
N/A
01/14/04
N/A
.
CA320-NEPA 04-06
CX
Widow Peak
Thinning
Forest Thinning
Hall
11/07/03
01/15/04
.
N/A
.
CA320-NEPA 04-07
EA
South
Tablelands
Grazing
Permit
Renewal
10 Year Grazing
Permit Renewal
Lowrey
11/17/03
01/23/04
.
.
.
CA320-NEPA 04-08
EA
South
Graves/
Rocky
Prairie
Pasture and
Allotment
Division
Fence
Existing Fence
Removal and
Reconstruction
Lowrey
12/02/03
02/13/04
.
.
.
CA320-NEPA 04-09
CX
Bilike Spring
Exclosure
Riparian/Cultural
Exclosure
Butow
01/29/04
N/A
.
N/A
.
CA320-NEPA 04-10
EA
Intregrated
Weed
Management
Plan
Weed Control
Dolan
.
03/03/04
.
.
.
CA320-NEPA 04-11
EA
West Sheep
Mountain
Grazing
Permit
Renewal
10 Year Permit
Renewal
Lowrey
03/11/04
04/15/04
.
.
.
CA320-NEPA 04-12
CX
Wade
Williams
Firewood
Cutting Area
Establish New
Firewood Cutting
Area
Hall
12/11/03
.
.
N/A
Project Started 06/04.

CA320-NEPA04-13

 CX
Aspen Restoration
 Aspen Protection
 Schmidt
 04/05/04
 N/A
 04/21/04
 N/A
 Project Started 06/04

CA320-NEPA04-14

CX

Nelson MX

Nelson Corral Juniper Treatment

Savage

04/17/04

N/A

05/23/04

N/A

Completed 10/04

CA320-NEPA04-15 

CX

Yankee Jim Juniper Removal

Arch Site Protection

Foster-Curley

06/29/04

N/A

07/11/04

N/A

Completed

CA320-NEPA04-16

CX

Likely Hazardous Fuels Treatment

Juniper Thinning

Hall

07/21/04

N/A

 

N/A

To Be Implemented 2006

CA320-NEPA04-17

EA

Beaver Creek Riparian Fence

Riparian Exclosure

Dolan

08/13/04

09/01/04

10/25/04

12/14/04

 FY05 Fence Contract 

CA320-NEPA04-18

CX

Modoc Guides

Hunter Guide Permit

Singleton

 

 

11/07/04

 

Permit Issued

CA320-NEPA04-19

CX

Gatlin Guide Service

Hunter Guide Permit

Singleton

 

 

11/07/04

 

Permit Issued

CA320-NEPA04-20

CX

White Water Adventures

Hunter Guide Permit

Singleton

 

 

11/07/04

 

Permit Issued

CA320-NEPA04-21

CX

Williams Ranch

Aspen Fence

Singleton

 

 

 

 

 

CA320-NEPA04-22

CX

South Graves Reservoir Maintenance and Repair

Reservoir Maintenance and Repair

Lowrey

09/15/04

N/A

09/29/04

N/A

Permittee Reconstruction

CA320-NEPA04-23

CX

Tule Mtn Access Road RX

Burning of Slash Piles

Savage

09/15/04

N/A

10/01/04

N/A

Fall 05

CA320-NEPA04-24

EA

North Ash Valley Riparian Fence

New Fence Construction

Butow

09/21/04

09/21/04

09/30/04

11/19/04

FY05 Fence Contract

CA320-NEPA04-25

Addendum

Moon Springs Grazing Lease CA-320-NEPA-02-12

Addition of Six Mile Hill lease to Moon Springs (combine allotments)

Lowrey

09/22/04

N/A

09/27/04

N/A

Allotments Combined, 10 Year Grazing Lease Issued

CA320-NEPA04-26

Addendum

Hot Springs and Day Allotments Grazing Lease Renewal CA320-NEPA-02-17

Issue Grazing Leases for 10 Years Instead of 5 Years

Lowrey

09/23/04

N/A

09/27/04

N/A

10 Year Grazing Lease Issued

CA320-NEPA04-27

CX

Parks Project

Fuels Treatment

Hall

09/30/04

N/A

 

N/A

 

CA320-NEPA04-28

CX

J & D Guide Service

Hunter Guide Permit

Singleton

10/06/04

N/A

11/07/04

N/A

Permit Issued