[DOE LETTERHEAD]

April 11, 2002

The Honorable John T. Conway
Chairman
Defense Nuclear Facilities Safety Board
625 Indiana Avenue, NW
Suite 700
Washington, D.C. 20004

Dear Mr. Chairman:

Enclosed is a table showing the schedule for updating the functional area qualification standards in the Technical Qualification Program (TQP). This table fulfills Commitment 19 of the Department of Energy's (DOE) Implementation Plan for the Defense Nuclear Facilities Safety Board Recommendation 2000-2, Configuration Management, Vital Safety Systems. Based on this deliverable, the Department proposes closure of Commitment 19.

Commitment 19, originally to be completed by June 2001, called for DOE to revise TQP standards or processes for safety system expertise, taking into account conclusions from the report, "Analysis of Safety System Federal Staff Expertise and Availability," which was provided to the Board on January 24, 2002. That report concluded that the majority of DOE technical skill gaps are in the following technical areas: mechanical systems, fire protection, electrical systems, instrumentation and control, and criticality safety.

The enclosed table shows the schedule the Federal Technical Capability Panel (FTCP) is using to update and change the TQP standards into DOE Technical Standards. Priority has been placed on the five functional areas having the greatest skill gaps, so that these standards are updated first to appropriately reflect safety system expertise for Federal employees newly qualifying in these functional areas.

During the update of the qualification standards, the sponsor for each standard is to evaluate the need to add competency requirements or supporting knowledge and/or skill statements dealing with oversight of safety systems. The sponsor is expected to add these elements to the functional area qualification standard, or provide the FTCP a justification as to why they are not needed. Two of the five priority functional area qualification standards have already been evaluated for safety system expertise: fire protection and criticality safety. In both cases, existing competency requirements and knowledge and/or skill statements adequately address safety systems. The fire protection qualification standard was updated to a DOE Technical Standard in July 2000 and will not undergo a further update at this time. The criticality safety qualification standard is expected to be changed to a DOE Technical Standard by June 2003. The three other priority functional area qualification standards (mechanical systems, instrumentation and control, and electrical systems) are expected to be updated by April 2003. All remaining functional area qualification standards are expected to be updated by December 2003.

In another matter, the FTCP has approved its 2002 annual plan and a copy has been provided to the Board's staff. Action 5.3 of the annual plan calls for the FTCP agents to identify staff level personnel who are responsible for the oversight of contractor safety systems. This information is intended to provide additional detail as a follow-on step to the report, "Analysis of Safety System Federal Staff Expertise and Availability. " Each site has flexibility to use an appropriate method to identify personnel responsible for safety system oversight. The completion goal for this action is June 30, 2002. This information will be provided to the Board when complete.

If you have any questions, please contact me or have your staff contact Mr. Patrick McGuire at (803) 952-4016.

Sincerely,

Roy J. Schepens
Chairman
Federal Technical Capability Panel


Enclosure
Qualification Standards Schedule

cc w/enclosure:
E. Livingston (S-l), HQ
B. Cook (EH-I), HQ
M. Whitaker (S-3.1), HQ
R. Card (US), HQ
J. Gordon (NA-l), HQ
J. Roberson (EM-01), HQ
R. Haeckel (NA- l0), HQ
FTCP Agents (electronically)



Attachment


FUNCTIONAL AREA QUALIFICATION STANDARD UPDATE SCHEDULE

Qualification
Standard
Sponsor/
POC
First Draft
Developed
SME Comments
Resolved
Approved by FTCP Input into
Directives
System

Comments
Fire Protection
DOE-STD-1137-2000
(Priority)
Hanford
Dee Willis
509/372-3006

X

X

X

7/2000
This qual standard already updated to DOE-STD-1137-2000. Safety systems adequately addressed in current version
Electrical Systems (Priority) NNSA/NV
Stephen Mellington
702/295-7063

10/31/02

2/28/03

3/31/03

4/30/03
 
Instrumentation
and Control
(Priority)
SR
Marc Woodworth
803/952-2025

10/31/02

2/28/03

3/31/03

4/30/03
 
Mechanical
Systems
(Priority)
SR Tim Smith
803/208-0578
G. Christenbury
803/208-0105


10/31/02


2/28/03


5/31/03


4/30/03
 
Criticality Safety
(Priority)
EH Jerry McKamy
301/903-8031

12/31/02

4/30/03

5/31/03


6/30/03
Safety systems adequately addressed in current version.
Industrial Hygiene
DOE-STD-1138-2000
Hanford
Dee Willis
509/372-3006

X

X

X

7/2000
This qual standard already updated to DOE-STD-1138-2000. Safety systems adequately addressed in current version.
General Technical
Base
(DOE-STD-1146-2001)
EH
Jacques Read
301/903-2535

X

X

X

10/2001
This qual standard already updated to DOE-STD-1146-2001. Safety systems adequately addressed in current version.
Facility
Representative
S-3.1
John Evans
202/586-3685

X

X

4/30/02

5/31/02
 
Quality Assurance Hanford
Dee Willis
509/372-3006
(EH in future)

X

X

4/30/02

5/31/02
 
Occupational
Safety
Hanford
Dee Willis
509/372-3006

X

6/30/02

7/31/02

8/31/02
 
Transportation &
Traffic
Management
EM
Ella McNeil
301/903-7284
B. Hermann
505/845-5624


6/30/02


10/31/02


11/30/02


12/31/02
 
Decontamination
and
Decommissioning
(D&D)
EM
Andy Szilagyi
301/903-4278

7/31/02

11/30/02

12/31/02

1/31/03
 
Environmental
Compliance
EM
Joe Arango
202/586-7599

8/30/02

12/31/02

1/31/03

2/28/03
 
Chemical
Processing
SR
Pat Suggs
803/557-5101
Dave Faubert
803/952-2371


9/30/02


2/28/03


3/31/03


4/30/03
 
Radiation
Protection
EH
Rick Jones
301/903-6061

12/31/02

4/30/03

5/31/03

6/30/03
Safety systems adequately addressed in current version.
Environmental Restoration EM
Joe Arango
202/586-7599
1/31/03 5/30/03 6/30/03 7/30/03  
Aviation Safety
Manager
YAO
Robert Poe
865/576-0891

6/30/03

10/31/03

11/30/03

12/31/03
 
Aviation Safety
Officer
YAO
Robert Poe
865/576-0891

6/30/03

10/31/03

11/30/03

12/31/03
 
Senior Technical
Safety Manager
OR
Robert Poe
865/576-0891

6/30/03

10/31/03

11/30/03

12/31/03
 
Technical Trainer OR
Robert Poe
865/576-0891

6/30/03

10/31/03

11/30/03

12/31/03
 
Waste
Management
EM
Joe Arango
202/586-7599

6/30/03

10/31/03

11/30/03

12/31/03
 
Emergency
Management
NV
Stephen Mellington
702/295-7063

6/30/03

10/31/03

11/30/03

12/31/03
 
Nuclear Safety
Systems
DP
Jim Winter


301/903-2874

6/30/03

10/31/03

11/30/03

12/31/03
 
Nuclear Explosives AL/NV
Wayne Walker
505/845-4240

6/30/03

10/31/03

11/30/03

12/31/03
 
Civil/Structural
Engineering
NNSA
Jeff Kimball
301/903-6413

6/30/03

10/31/03

11/30/03

12/31/03
 
Facility
Maintenance
Management
NNSA/DP
Jim Winter
301/903-2874

6/30/03

10/31/03

11/30/03

12/31/03
 
Construction
Management and
Engineering

NNSA-HQ
Ed Wilmot
202/586-5291

6/30/03

10/31/03

11/30/03

12/31/03
 
Safeguards and
Security
NNSA-HQ
Ed Wilmot
202/586-5291

6/30/03

10/31/03

11/30/03

12/31/03
 
Project
Management
AL/NV
Wayne Walker
505/845-4240

6/30/03

10/31/03

11/30/03

12/31/03
 
 
X - denotes a completed step

April 2002