U.S. DEPARTMENT OF THE INTERIORBUREAU OF LAND MANAGEMENT
California
 

Barstow NEPA Documents

The table below shows the Barstow NEPA documents that are currently being developed or have recently been completed. Some of the documents in that table are available on-line and can be downloaded by clicking the entry in the Type column.

There is a legend available which describes NEPA terms.

To sort the documents, click on a column header. You can also narrow results through a custom search by clicking here. To view documents from another office, select an office in the box below.

Your search found records.
Prev 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Next

Project Number Type Program Description Geographic Location Contact Status Initiated Completed Field Office Fiscal Year
CA-680-07-23EALands and RealtyOak Creek Energy Black Butte 4 Met Tower & Wind Study Area ReservationSBBM T8N, R6E & R7E, T7N, R7E Joan Patrovsky
760-252-6032
On hold pending WO policy review. Awaiting possible receipt of Type 1 application for met towers outside of ACEC01/08/2007Barstow
CA-680-06-45CXLands and RealtySCE Baroid 33kV R/W Renewal & FLPMA ConversionSBBM T8N, R3E, Sec6 & T9N, R3E, Sec31Joan Patrovsky
760-252-6032
R/W Letter to go out in early 200704/24/200606/08/2006Barstow 2006
CA-680-06-04EAPublic SafetyNewberry Pit Human Health & Safety Fence, Reclamation of Erosion Channel, and Trash CleanupSBBM T8N, R3E, Sec 11Jamie Livingood
760-252-6029
Fence and Trash Cleanup Completed, erosion channel reclam pending Jun 200710/24/200505/07/2007Barstow 2007
CA-680-07-03EAMineralsAzucar Mine Exploratory Drilling & associated Access RoutesSBBM T8N, R2E, Sec. 18 & 19Jamie Livingood
760-252-6029
Awaiting Bio & Cult Field Surveys10/11/2006Barstow
CA-680-06-12EAPublic SafetyEl Mirage OHV Area-6 Shaft PUF Closures or Protection Grates/FencesSBBM T7N, R6E, Secs. 20 & 28Jamie Livingood
760-252-6029
Completed11/28/200507/21/2006Barstow 2006
CA-680-06-21CXWildlifeEl Mirage Mine Shaft Bat SurveysSBBM T7N, R6E, Secs. 20 & 28Jamie Livingood
760-252-6029
Completed01/06/2006Barstow 2006
CA-680-06-20EAHazardous materialsK-M Pipeline Testing & Repairs at Anomoly (Possible Leak) LocationsSBBM T7N, R4W, Sec 28; T12N, R6E, Sec 34; T12N, R7E, Sec 21 &15; T15N, R10E, Sec13; T15N, R11E, Sec 18; T16N, R14E, Sec 10, 31, 32.Janice Davis
760-252-6023
Completed12/20/2005Barstow 2006
CA-680-06-73EALands and RealtyRancho Road R/W SBBM T6N, R4W, S. 32Rich Rotte
760-252-6026
Not yet scoped--2009 or 2010 Construction Date07/12/2006Barstow
CA-680-06-74CXLands and RealtyRancho Road Construction Temporary R/W SBBM T6N, R4W, S. 32Rich Rotte
760-252-6026
Not yet scoped--2009 Construction Date07/12/2006Barstow
CA-680-06-46CXLands and RealtyMCI Easement for existing Fiberoptic line through acquired landsSBBM T6N, R3W, Sec 1, Lot 2Joan Patrovsky
760-252-6032
Completed04/24/200604/28/2006Barstow 2006

Prev 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Next