Email | Cancel Print Preview Print | Feeds

TOTAL FORCE ADMINISTRATION SYSTEM (TFAS) QUALITY LEADERSHIP;BOARD (QLB) AFTER ACTION REPORT 

R 231317Z JUN 00  ZYW
  FM CMC WASHINGTON DC//MI//
  TO MARADMIN
  BT
  UNCLAS  //N01080//
  MARADMIN 315/00
  MSGID/GENADMIN/CMC/MI//
  SUBJ/TOTAL FORCE ADMINISTRATION SYSTEM (TFAS) QUALITY LEADERSHIP
  /BOARD (QLB) AFTER ACTION REPORT//
  REF/A/RMG/CMC WASHDC/YMD:000223/230800//
  AMPN/REF IS ANNOUNCEMENT OF TFAS QLB MEETING//
  RMKS/1.  THE PURPOSE OF THIS MARADMIN IS TO UPDATE MARINES AND THEIR
  COMMANDERS ON TFAS.  PER THE REF, THE TFAS QLB MET RECENTLY IN
  QUANTICO TO REVIEW PROGRAM PROGRESS, REFINE THE TFAS VISION/END
  STATE AND MAKE DECISIONS ABOUT ADMIN PROCESSES BEING REENGINEERED BY
  THE TFAS STEERING GROUP.
  2.  THE TFAS QUALITY LEADERSHIP BOARD (QLB) HAS DONE TREMENDOUS WORK
  TO ARTICULATE A CLEAR CONCEPT AND ROADMAP FOR THE TFAS INITIATIVE.
  THE CONCEPT AND ROADMAP THAT REFLECT THE LATEST WORK OF THE TFAS QLB
  INVOLVE EVOLUTIONARY STEPS THAT WILL PRODUCE REVOLUTIONARY CHANGES
  TO HOW WE CURRENTLY CONDUCT PAY AND PERSONNEL ADMINISTRATION.  THIS
  MARADMIN DISCUSSES THIS CONCEPT AND ROADMAP AND PROVIDES A PROGRESS
  UPDATE.  THE CONCEPT AND END STATE THAT HAVE BEEN DEVELOPED FOR PAY    AND PERSONNEL ADMINISTRATIVE SUPPORT IN THE 21ST CENTURY ARE SIMILAR
  TO THE FIVE ECHELONS OF EQUIPMENT MAINTENANCE:
      A. FIRST ECHELON OF PERSONNEL ADMINISTRATION WILL BE A
  SELF-SERVICE CAPABILITY ALLOWING MARINES TO ACCESS THEIR RECORDS AND
  MAKE ROUTINE RECORD CHANGES VIA A WEB SITE, INTERACTIVE VOICE
  RESPONSE SYSTEM OR BY TALKING DIRECTLY TO A REPRESENTATIVE AT A
  CORPS-WIDE CONTACT CENTER.  ANY TRANSACTION SUBMITTED BY THE
  INDIVIDUAL MARINE WILL GENERATE A FEEDBACK ADVISORY TO THE
  COMMANDER.  THE EMPLOYEE/MEMBER SELF SERVICE (E/MSS) CAPABILITY
  RECENTLY FIELDED BY DFAS IS AN EXCELLENT START FOR THIS ECHELON OF
  SUPPORT AND IS EXPANDABLE.  ALTHOUGH THERE MAY BE SOME RESISTANCE TO
  THE IDEA OF SELF-SERVICE CAPABILITY FOR ROUTINE ACCESS AND RECORDS
  CHANGES, OUR MARINES COME FROM A WORLD WHERE TECHNOLOGY IS
  COMMONPLACE AND INTO A CORPS WHERE THE COMMANDANT'S GUIDANCE IS
  CLEAR: 'IF WE BELIEVE THAT MARINES TRY TO DO THE RIGHT THING, IT
  FOLLOWS THAT OUR POLICIES AND DIRECTIVES SHOULD REFLECT THAT
  CONVICTION.  JUST AS WE TRUST ONE ANOTHER INSTINCTIVELY IN COMBAT,
     SO TOO CAN WE ENJOY THE SAME CONFIDENCE IN OUR DAILY LIVES.'
      B. SECOND ECHELON SUPPORT WILL BE PROVIDED BY SMALL UNIT LEADERS.
  THIS IS NOT ABOUT TURNING LEADERS INTO ADMIN CLERKS. THESE LEADERS
  WILL DO THE SAME WORK THEY ARE DOING TODAY, ONLY DIFFERENTLY.
  ELECTRONIC DEVICES WILL REPLACE CLIPBOARDS AND PAPER ALPHA ROSTERS
  AND ALLOW SMALL UNIT LEADERS TO ACCESS AND INITIATE CHANGED
  INFORMATION IN MCTFS THAT THEY CURRENTLY REPORT EVERY DAY.
  EXAMPLES OF SECOND ECHELON REPORTING INCLUDE INDIVIDUAL TRAINING
  INFORMATION, PRO/CON MARKS, ANNUAL LEAVE, BILLET MOS AND OTHER
  NON-TECHNICAL INFORMATION THAT DOES NOT REQUIRE SCHOOL-TRAINED
  ADMINISTRATORS TO REPORT.  TODAY, OUR SMALL UNIT LEADERS COLLECT
  THIS INFORMATION AND USHER IT THROUGH A LABORIOUS PROCESS THAT
  CULMINATES WITH UNIT DIARY CLERKS KEYING THE INFORMATION INTO MCTFS.
  SECOND ECHELON REPORTING WILL STREAMLINE THESE PROCESSES AND REDUCE
  ERRORS.  WHILE TFAS ACTIONS TO DATE HAVE CENTERED AROUND
  CONSOLIDATING ADMIN CAPABILITY, THESE TWO ECHELONS OF SUPPORT
  REPRESENT AN ENORMOUS DECENTRALIZATION OF ADMINISTRATION.
         C. THIRD ECHELON SUPPORT WILL HAVE TRAINED PERSONNEL
  ADMINISTRATORS TO REPORT INFORMATION INTO MCTFS.  A SMALL NUMBER OF
  PERSONNEL ADMINISTRATORS LOCATED AT THE BATTALION/SQUADRON S-1
  OFFICE, OR IN A SIMILAR CAPACITY AT OTHER COMMANDS, WILL REPORT
  LIMITED TECHNICAL TRANSACTIONS WITH THE ABILITY TO REACH BACK
  (IN GARRISON OR DEPLOYED) TO THE FOURTH ECHELON CAPABILITY FOR
  ASSISTANCE WITH MORE TECHNICAL PROCESSES/TRANSACTIONS. THIRD ECHELON
  CAPABILITY WILL BE SUFFICIENTLY ROBUST TO PROVIDE FIRST AND SECOND
  ECHELON SUPPORT IN A DEPLOYED ENVIRONMENT AND IN GARRISON.
      D. FOURTH ECHELON SUPPORT WILL BE PROVIDED BY A SINGLE MARINE
  CORPS TOTAL FORCE ADMINISTRATION CENTER.  THIS CENTER WILL SUPPORT
  PROCESSES THAT REQUIRE IN-DEPTH TECHNICAL KNOWLEDGE AND HIGHER-LEVEL
  CONTROL/OVERSIGHT FOR REGULAR, RESERVE AND RETIRED MARINES.  THIS
  FOURTH ECHELON CAPABILITY WILL BE PART OF THE MAGTF. IT WILL SUPPORT
  OMFTS CONCEPTS BY SIGNIFICANTLY REDUCING THE FOOTPRINT ABOARD SHIP
  AND ASHORE. A PRELIMINARY ESTIMATE IS THAT 25 TO 30 PERCENT OF
     THE TRANSACTIONS CONDUCTED IN TODAY'S CONSOLIDATED ADMIN OFFICES
  WILL BE CONDUCTED BY THE FOURTH ECHELON.
      E.  FIFTH ECHELON SUPPORT WILL CONTINUE TO BE PROVIDED BY HIGHER
  HEADQUARTERS ORGANIZATIONS LIKE THE PERSONNEL MANAGEMENT DIVISION AT
  HQMC (E.G.,AOWP AND PROMOTION ENTRIES) AND FINANCIAL MANAGEMENT
  OFFICES.  ABOUT 20 PERCENT OF TODAY'S TRANSACTION REPORTING IS DONE
  THROUGH THIS ECHELON OF SUPPORT.
  3.  THE ROADMAP TO IMPLEMENT TFAS INCLUDES FOUR PHASES:
      A.  PHASE ONE HAS TWO PARTS:  FIELD-LEVEL CONSOLIDATIONS AND
  PROGRAM DEVELOPMENT.  FIELD-LEVEL CONSOLIDATION ABOVE THE
  TRADITIONAL BN/SQDN LEVEL THROUGHOUT THE OPERATING FORCES AND MAJOR
  BASES AND STATIONS IS A MEASURE TO MAKE ENDS MEET AS WE ABSORB THE
  IMPACT OF THE 1,067 BILLET CUT FOR ADMINISTRATORS.  THE TARGET
  DATE FOR THE COMPLETION OF THESE CONSOLIDATIONS IS SEP 2001. IN THE
  FIRST QUARTER OF FY02, WE WILL CONDUCT A STRUCTURE REVIEW TO PROVIDE
  THE INTERIM STANDARDS FOR PERSONNEL ADMINISTRATION T/O REQUIREMENTS.
  IT IS IMPORTANT THAT COMMANDERS MEET THE SEP 01 TARGET AS EARLY AS
     POSSIBLE SO THEY HAVE THE EMPIRICAL DATA TO CONTRIBUTE TO THE
  STRUCTURE REVIEW.  THE SECOND PART OF PHASE ONE IS PROGRAM
  DEVELOPMENT.  THIS INCLUDES DEVELOPING THE ACQUISITION STRATEGY FOR
  THE TECHNOLOGY ENABLERS AND IDENTIFYING THE MILCON REQUIREMENTS
  DISCUSSED BELOW.  WE EXPECT PHASE ONE TO BE COMPLETE IN EARLY FY02.
     B.  PHASE TWO IS THE DECENTRALIZATION PHASE.  PROCESS ENHANCEMENTS
  AND TECHNOLOGIES WILL BE FIELDED TO THE FIRST THROUGH THIRD ECHELON.
  PHASE TWO WILL BE COMPLETE WHEN THE SRB/OQR IS COMPLETELY AUTOMATED
  AND THE FIRST THROUGH THIRD ECHELON REPORTING CAPABILITIES ARE FULLY
  IMPLEMENTED.  PHASE TWO WILL START IN FY02 AND BE LARGELY COMPLETED
  BY FY05.
     C.  PHASE THREE IS THE CORPS-WIDE CONSOLIDATION OF OUR FOURTH
  ECHELON SUPPORT CAPABILITY INTO A SINGLE TOTAL FORCE ADMINISTRATION
  CENTER FOR THE MARINE CORPS. THE ADMINISTRATIVE FUNCTIONS REMAINING
  AT THE REGIMENTAL/GROUP/INSTALLATION CONSOLIDATED ADMINISTRATION
  OFFICES WILL MIGRATE TO THE CENTER.  WE WILL ASSESS THE NEED FOR
  LIMITED FOURTH ECHELON CAPABILITIES AT OTHER LOCATIONS DEPENDING ON
     LOCAL REPORTING REQUIREMENTS.  TECHNICAL SUPPORT OFFICES, SIMILAR TO
  TODAY'S MARINE CORPS ADMINISTRATIVE ANALYSIS TEAMS AND THE MANPOWER
  INFORMATION SYSTEMS SUPPORT OFFICES, WILL BE ESTABLISHED AT MAJOR
  INSTALLATIONS. THESE OFFICES WILL ALSO PROVIDE LIMITED REDUNDANCY
  FOR THE MARINE CORPS TOTAL FORCE ADMINISTRATION CENTER IN CASE OF
  CATASTROPHIC FAILURE/ASYMMETRIC ATTACK.  THIS PHASE WILL COMMENCE
  IN FY05 AND BE COMPLETED IN THE FY07/08 TIMEFRAME.
      D.  PHASE FOUR IS AN OPTIMIZATION PHASE FOR REFINEMENTS AND
  PROCESS IMPROVEMENTS AS WE INSTITUTIONALIZE AND MATURE TFAS.
  4.  CONSIDERABLE PROGRESS HAS BEEN MADE IN PHASE ONE OF THIS ROADMAP.
  WE HAVE AN APPROVED REQUIREMENT IN THE COMBAT DEVELOPMENT PROCESS
  AND HAVE RECEIVED A FAVORABLE MILESTONE 0 DECISION IN THE
  ACQUISITION PROCESS. THE ASSESSMENT OF THE TECHNOLOGY ARCHITECTURE
  IS UNDERWAY AND IS EXPECTED TO BE COMPLETED BY THE END OF THIS
  SUMMER. THE SUPPORT FOR THIS INITIATIVE IN THE FY02 POM PROCESS
  HAS BEEN TREMENDOUS.  THERE IS STRONG RECOGNITION THROUGHOUT THE
     MARINE CORPS THAT WE NEED A SUBSTANTIAL CHANGE IN OUR OVERALL
  ADMINISTRATIVE SUPPORT PROCESS FOR MARINES AND COMMANDERS.  THE
  INITIATIVE IS CURRENTLY ABOVE THE LINE FOR FUNDING IN POM-02.  WE
  EXPECT TO DEFINE THE MILCON REQUIREMENT FOR A TOTAL FORCE
  ADMINISTRATION CENTER BY THE END OF FY01.
  5.  SUBSTANTIAL PROGRESS HAS ALSO BEEN MADE THROUGHOUT THE OPERATING
  FORCES TO CONSOLIDATE ABOVE THE TRADITIONAL BN/SQDN LEVEL. THE
  MARFOR G-1S REPORT THAT THE SEP 01 TARGET DATE WILL BE MET. I MEF,
  WITH SUPPORT FROM REPRESENTATIVES OF OTHER CONSOLIDATED UNITS
  THROUGHOUT THE CORPS, IS DEVELOPING AN INTERIM SET OF AUTOMATED
  TOOLS AND PROCESSES THAT WILL BE MADE AVAILABLE CORPS-WIDE BY THE
  END OF FY00.  THESE INTERIM TOOLS AND PROCESSES ARE INTENDED TO
  BRIDGE THE GAP AS WE PURSUE THE LONG-TERM PROCESS AND TECHNOLOGY
  SOLUTIONS THROUGH THE ACQUISITION PROCESS.  AT THE HQMC LEVEL, WE
  NEED TO BETTER UNDERSTAND LOCAL RESOURCE SHORTFALLS AND, WHERE
  POSSIBLE, HELP IDENTIFY RESOURCES FOR PHASE ONE CONSOLIDATION
  EFFORTS.
  6.  WE HAVE A GOOD DEAL OF WORK TO DO BEFORE WE CAN FULLY IDENTIFY
     THE STRUCTURE REALIGNMENTS THAT WILL RESULT FROM THIS INITIATIVE. IT
  IS CLEAR, HOWEVER, THAT STRUCTURE REALIGNMENT, BEYOND THE INITIAL
  1,067, IS POSSIBLE WITH TFAS.  THE INITIAL GOAL WAS AN OVERALL
  REALIGNMENT OF 33 PERCENT OF OUR ADMIN STRUCTURE AND INDICATIONS ARE
  THAT WE WILL MEET OR EXCEED THAT GOAL.  IT IS EXTREMELY IMPORTANT
  THAT WE NOT EXECUTE THOSE REALIGNMENTS UNTIL THE NECESSARY
  ORGANIZATIONAL, PROCESS AND TECHNOLOGY ENHANCEMENTS HAVE BEEN PUT IN
  PLACE.  IDENTIFYING THESE REALIGNMENTS AND EXECUTING THEM IN AN
  ORDERLY FASHION WILL ALSO BETTER POSITION US TO FORMULATE THE
  MANPOWER INVENTORY MANAGEMENT PLANS THAT WILL MINIMIZE THE IMPACT
  ON THOSE MARINES AFFECTED.
  7.  THIS IS A MAJOR CHANGE IN HOW WE CONDUCT PERSONNEL
  ADMINISTRATION. IT WILL TAKE UP-FRONT INVESTMENTS, INFRASTRUCTURE
  ENHANCEMENTS, CHANGES TO TRAINING AND A SIGNIFICANT MINDSET CHANGE
  IN HOW WE PROVIDE ADMINISTRATIVE SUPPORT TO MARINES AND COMMANDERS.
  THIS IS A PROACTIVE, FORWARD-LOOKING PLAN THAT WILL TAKE US WELL
  INTO THE 21ST CENTURY.  IT INCORPORATES STATE-OF-THE-ART METHODS TO
     TAKE CARE OF OUR MARINES, LEVERAGES THE TECHNOLOGICAL TALENTS OF
  INDUSTRY AND OUR NEWEST GENERATIONS OF MARINES AND PROVIDES
  TREMENDOUS POTENTIAL TO REDUCE OUR TOOTH-TO-TAIL RATIO IN THE MAGTF.
  8.  FOR PLANNING PURPOSES THE NEXT QLB CONFERENCE IS TENTATIVELY
  SCHEDULED TO BE HOSTED BY MCRSC KANSAS CITY 13-15 SEPT 2000.
  9.  POC:  MR J. D. KENKEL OR CWO4 T. TORRESRAMOS (HQMC MIP) DSN
  278-9060, COML (703)784-9060, EMAIL KENKELJD@MANPOWER.USMC.MIL OR
  TORRESRAMOST@MANPOWER.USMC.MIL.//
  BT