TOTAL FORCE ADMINISTRATION QUALITY LEADERSHIP BOARD (QLB) AFTER ACTION REPORT 

R 231630Z MAY 01 ZYW
  FM CMC WASHINGTON DC//M&RA//
  TO MARADMIN
  BT
  UNCLAS  //N50000//
  MARADMIN 251/01
  MSGID/GENADMIN/CMC WASHINGTON DC/M&RA//
  SUBJ/TOTAL FORCE ADMINISTRATION QUALITY LEADERSHIP BOARD (QLB) AFTER
  /ACTION REPORT//
  REF/A/RMG/DC M-RA LTR 10/YMD: 010221 (NOTAL)//
  REF/B/RMG/MARADMIN 315/00//
  AMPN/REF A IS THE CHARTER FOR THE DEVELOPMENT AND IMPLEMENTATION OF
  TOTAL FORCE ADMINISTRATION//
  AMPN/REF B IS THE QLB AFTER ACTION REPORT FOR 4-5 APR 00
  CONFERENCE//
  RMKS/1.  PER REF A, THE TOTAL FORCE ADMINISTRATION QLB MET 18-19 APR
  IN NEW ORLEANS TO REVIEW PROGRAM PROGRESS, DISCUSS RELEVANT ISSUES
  AND MAKE APPROPRIATE DECISIONS REGARDING TOTAL FORCE ADMINISTRATION.
  THE PURPOSE OF THIS MARADMIN IS TO PUBLISH A PROGRESS REPORT ON THE
  TOTAL FORCE ADMINISTRATION INITIATIVE.
  2.  TOTAL FORCE ADMINISTRATION IS AN ENTERPRISE-WIDE INITIATIVE THAT
  WILL MOVE USMC PAY & PERSONNEL ADMINISTRATION TO A PREDOMINANTLY
  SELF-SERVICE, VIRTUALLY PAPERLESS, WEB-BASED ENVIRONMENT.
  3.  REF B ESTABLISHED A TARGET DATE OF SEP 01 FOR COMPLETION OF FIELD    
      -LEVEL CONSOLIDATION OF PERSONNEL ADMINISTRATION ABOVE THE
  TRADITIONAL BN/SQDN LEVEL THROUGHOUT THE OPERATING FORCES AND MAJOR
  BASES AND STATIONS.  MARFOR/MEF QLB REPS REPORTED THE FOLLOWING
  CONSOLIDATION STATUS:
      A.  I MEF - AS OF 30 JUNE 2000, ALL MSC PERSONNEL ADMINISTRATION
  WITHIN I MEF IS CONSOLIDATED AT OR ABOVE THE GROUP/REGIMENTAL LEVEL.
  THERE ARE TWO INSTALLATION CENTERS LOCATED AT MAGTF TRAINING
  COMMAND AND MCAS YUMA. I MEF CONTINUES TO REFINE AND ENHANCE MEU AND
  DEPLOYED UNIT 'REACH-BACK.'  FUTURE EFFORTS INCLUDE THE
  CONSOLIDATION OF 1ST FSSG AND I MHG GPAC'S, THE INCLUSION OF CE
  SCHOOL INTO THE MAGTF TRAINING COMMAND'S CENTER AND MCAS MIRAMAR
  INSTALLATION CONSOLIDATION OF COMCABWEST, MAG-11, MAG-16 AND
  COMPOSITE GROUP MACG-38/MWSG-37.
      B.  II MEF - PRESENTLY, PERSONNEL ADMINISTRATION WITHIN II MEF IS
  CONSOLIDATED IN 2D FSSG, MAG-14, MACG-28, AND II MHG.  2D MARDIV
  WILL BE COMPLETE DURING MAY 01.  THE FIRST 'REACH-BACK' DEPLOYMENT
  OCCURRED IN DEC 00 AND THE FIRST MEU 'REACH-BACK' OCCURRED DURING    
      APR 01.  II MEF IS WORKING ON 'REACH-BACK' CAPABILITIES WITH PROWLER
  SQUADRONS SUPPORTING JOINT OPS.  FUTURE CONSOLIDATION EFFORTS
  INCLUDE: 2D FSSG IS COORDINATING WITH 2D MAW TO ALLOW CSSD'S TO BE
  SUPPORTED REGIONALLY AT CHERRY POINT, NEW RIVER AND BEAUFORT;
  MWSG-27 IS STANDING UP; MCAS BEAUFORT IS IN THE PLANNING STAGE -
  WILL BE AN IPAC SUPPORTING ALL TENANT COMMANDS; MCAS NEW RIVER IS IN
  THE PLANNING STAGE - TRYING TO RELOCATE BOTH MAG 26 & 29 AND STATION
  INTO THE SAME BLDG.
      C.  III MEF - ISLAND-WIDE CONSOLIDATION EFFORTS CONTINUE IN A
  PHASED APPROACH.  GOAL IS A MEGA-CONAD LOCATED UNDER THE CONTROL
  OF MCB CAMP BUTLER.  TO DATE, 3D FSSG UNITS ARE FULLY CONSOLIDATED
  AT CAMP KINSER; HQBN, 3D MARDIV AND III MHG UNITS ARE CONSOLIDATED
  ABOARD CAMP COURTNEY; THE CONSOLIDATION OF WING, MCAS FUTENMA, AND
  MCB BUTLER UNITS AT CAMP FOSTER WAS COMPLETED DURING JAN 01; AND
  CONSOLIDATION OF UNITS ABOARD CAMP HANSEN ARE CURRENTLY UNDERWAY.
      D.  IN HAWAII, 3RD MARINES, CSSG-3, AND THE 1ST MAW ASEK
  HAVE CONSOLIDATED AT THE HIGHEST LEVEL WHILE MCBH AND MCAS HAVE    
      JOINTLY CONSOLIDATED.  HAWAII IS EXPANDING THE CAPABILITIES OF THE
  OAHU MANPOWER MANAGEMENT SERVICE CENTER.  CONSOLIDATION OF THE OAHU
  CONAD PROJECT CONTINUES BY PARTNERING WITH WESTPAC COMMANDS AND MCBH
  TENANTS (3RD MARINES, CSSG-3, 1ST MAW ASEK, 1ST RADIO BN,
  SNCO ACADEMY, H&S BN MARFORPAC, AND 4TH RECON BN, DISBURSING,
  HOUSING, TMO, MCCS, NAVY RELIEF AND RED CROSS) WITH COMPLETION
  DEPENDENT UPON FUNDING.
      E.  MARFORRES HAS NO IMMEDIATE PLAN FOR INTERIM CONSOLIDATION
  PAST THE SELECTED RESERVE UNITS INVOLVED IN THE RESERVE CENTRALIZED
  ADMINISTRATION INITIATIVE.  MCRSC HAS UNDERGONE A REORGANIZATION TO
  PROVIDE MORE RESPONSIVE ADMINISTRATIVE SUPPORT, PARTIALLY IN
  ANTICIPATION OF FOLLOW-ON RESERVE PERSONNEL ADMINISTRATION CENTER
  DESIGNATION.  MIGRATION TO A RESERVE PAC IS NOT EXPECTED UNTIL
  AUTOMATED ADMIN PROCESSES/CAPABILITIES ARE DEVELOPED, FIELDED AND
  EFFICIENCIES ARE REALIZED.
  4.  TOTAL FORCE STRUCTURE DIVISION, MCCDC WILL BRIEF PLANS FOR THE
  FIRST QUARTER FY02 STRUCTURE REVIEW AT THE NEXT QLB IN SEPTEMBER.    
      5.  RFL BRIEFED THE STATUS OF THE FOLLOWING INITIATIVES:
      A. STANDARD FINANCE SYSTEM REDESIGN SUBSYSTEM ONE (SRD-1) IS A
  DFAS DEVELOPED DISBURSING SYSTEM THAT IS BEING IMPLEMENTED ON A
  DISBURSING/FINANCE OFFICE BASIS MARINE CORPS WIDE.  DEPLOYMENT BEGAN
  IN JANUARY AND WILL BE COMPLETED THIS OCTOBER. SRD-1 PROVIDES THE
  MARINE CORPS WITH THE SPLIT-DISBURSEMENT CAPABILITY THAT ENABLES
  MARINES TO DIRECT A PORTION OF THEIR TRAVEL SETTLEMENT DIRECTLY TO
  THE BANK OF AMERICA TO PAY THEIR GOVERNMENT TRAVEL CARD BILLS.
      B.  DOCUMENT TRACKING MANAGEMENT SYSTEM, FORMERLY KNOWN AS THE
  EQUAD, IS CURRENTLY UNDER DEVELOPMENT AND IS SCHEDULED FOR
  IMPLEMENTATION DURING OCTOBER 2001. THIS PAPERLESS SYSTEM WILL ALLOW
  ADMINISTRATORS TO SUBMIT AND TRACK NAVMC FORMS 11116 AND 11060 TO
  THEIR SERVICING DISBURSING OFFICER VIA THE INTRANET.
      C.  TTC REFORM. THE 29 PALMS FINANCE OFFICE AND IPAC BEGAN A TTC
  REFORM TEST ON 1 APRIL.  THIS TEST MAKES THE FINANCE OFFICER SOLELY
  RESPONSIBLE FOR THE COMMENCEMENT OF ALL PCS RELATED PAY AND    
      ALLOWANCES AND REMOVES THE PRESENT REQUIREMENT FOR THE COMMANDING
  OFFICER TO CONDUCT A JOIN AUDIT TO VALIDATE THE ACCURACY OF THESE
  PAYS AND ALLOWANCES.  THE COMMANDING OFFICER IS ONLY RESPONSIBLE
  FOR VALIDATING THE ACCURACY OF PERSONNEL RELATED ENTRIES.
      D.  EMAIL TRAVEL SETTLEMENT NOTIFICATION/MARINE ONLINE.  RFL
  CONTINUES TO WORK WITH MARINE ONLINE TO DEVELOP A METHOD TO NOTIFY A
  MARINE OF THE DATE AND AMOUNT OF THEIR TRAVEL SETTLEMENT. TESTS TO
  DATE HAVE BEEN RESTRICTED TO THE MARINES SERVICED BY THE HENDERSON
  HALL FINANCE OFFICE.
  6.  FOUR RESERVE SPECIFIC INITIATIVES WERE BRIEFED.  THE QLB
  CONCURRED WITH THE TOTAL FORCE ADMINISTRATION APPLICABILITY OF THESE
  INITIATIVES AND, ON 19 APR 01, COMMARFORRES APPROVED THE COMMENCEMENT
  OF PLANNING FOR THE TRANSITION OF FUNCTIONAL MANAGEMENT OF ROWS,
  MCEAS, AND ADAPT TO M&RA (MIP).  MCMEDS, A FORMAL PROGRAM MANAGED BY
  MARCORSYSCOM, WILL REMAIN UNDER THE FUNCTIONAL MANAGEMENT OF M&RA
  (RA).  HOWEVER, A TOTAL FORCE ADMINISTRATION LINK TO MCMEDS WILL BE
  EXPLORED IN THE FUTURE.    
          A.  RESERVE ORDER WRITING SYSTEM (ROWS)(MARFORRES). ROWS IS A
  WEB-ENABLED SYSTEM DESIGNED TO AUTOMATE AND INTEGRATE THE RESERVE
  ORDER WRITING PROCESS, GENERATE MCTFS TRANSACTIONS, MANAGE ALL
  COMPONENTS OF ORDERS GENERATION LIFECYCLE AND TRACK FUNDS
  ASSOCIATED WITH RESERVE ORDERS. ROWS IS SCHEDULED FOR MAY 01
  DEPLOYMENT.
      B.  MARINE CORPS ENLISTED ADMINISTRATIVE SEPARATIONS
  (MCEAS)(MARFORRES). MCEAS IS A WEB-ENABLED SYSTEM DESIGNED TO
  AUTOMATE INVOLUNTARY ENLISTED ADMIN SEPARATIONS BY PROCESSING,
  TRACKING, PROVIDING VISIBILITY AND ELIMINATING MAILING PACKAGES TO
  MMSB.  PROJECTED DEPLOYMENT IS MAY 01.
      C.  MARINE CORPS MEDICAL ENTITLEMENTS DATA SYSTEM (MCMEDS)(RA).
  MCMEDS IS A WEB-ENABLED, AUTOMATED SYSTEM THAT INTERFACES ALL
  ASPECTS OF NOTICE OF ELIGIBILITY (NOE).  MCMEDS TRACKS APPLICATIONS,
  PROVIDES VISIBILITY OF APPROVED NOE'S, GENERATES REPORTS, AND
  INTERFACES WITH MCTFS.  MCMEDS HAS BEEN IMPLEMENTED AND FULL
  OPERATIONAL CAPABILITY IS ANTICIPATED BY JUL 01.
      D.  AUTOMATED DRILL ACCOUNTING PERSONNEL TRACKING (ADAPT)(MCRSC).    
      ADAPT IS ENVISIONED TO AUTOMATE DRILL ACCOUNTING AND FACILITATE
  PERSONNEL TRACKING.  ADAPT IS AWAITING FUNDING FOR CONCEPT TESTING
  AND DEMONSTRATION.
  7.  TOTAL FORCE ADMINISTRATION STEERING GROUP (SG) UPDATE:
      A.  THE SG BRIEFED THE RESULTS OF BUSINESS PROCESS RE-ENGINEERING
  TWO (BPR-2) THAT WAS CONDUCTED 26 FEB TO 09 MAR 2001.  THIRTEEN
  SUBJECT MATTER EXPERTS (SME) CONVENED AT QUANTICO TO DEFINE AND
  FLOWCHART THE 'TO-BE' BUSINESS RULES FOR THE 'PERSONAL REQUEST
  MODULE.'  THE SG SME ACCUMULATED OVER 800 MAN-HOURS WHILE REVIEWING
  AND MODIFYING THE BUSINESS RULES FOR 37 SUB-PROCESSES.
      B.  BPR-3 IS SCHEDULED FOR 10-23 JUNE IN QUANTICO TO RE-ENGINEER
  'SEPARATIONS' AND BPR-4 IS SCHEDULED FOR 15-28 JULY IN KANSAS CITY
  TO RE-ENGINEER 'PAY & ALLOWANCES.'
      C.  THE STATUS OF OTHER SG INITIATIVES FOLLOW: THERE ARE PACKAGES
  PENDING AT HQMC TO:
          (1) RESCIND THE REQUIREMENT FOR WET SIGNATURES
  ON PAPER UNIT DIARIES;
          (2) RESCIND THE REQUIREMENT TO USE FAMILY SEPARATION
  ALLOWANCE AND COST OF LIVING ALLOWANCE FORMS AND,    
              (3) ANNOUNCE AUTOMATED MEAL CARD APPLICATIONS.
      D.  THE NEXT SG MEETING IS SCHEDULED FOR 22-28 JULY IN KANSAS
  CITY.
  8.  M&RA (MIP) PROVIDED A FUNCTIONAL MANAGEMENT UPDATE.
      A.  AT THE JAN 01 QLB, THE QLB APPROVED A MODULAR APPROACH TO
  DOCUMENTING CAPABILITIES AND VISION STATEMENTS FOR MARINE CORPS
  FUTURE ADMINISTRATION PROCESSES.  EIGHTEEN MODULES WERE DEVELOPED BY
  THE SG THAT REPRESENT PROCESSES BEING RE-ENGINEERED BY THE TOTAL
  FORCE ADMINISTRATION STEERING GROUP AND WERE PRIORITIZED BY THE QLB.
  FIVE PRIMARY CONCERNS SURFACED RELATIVE TO THE MODULAR DEVELOPMENT
  APPROACH:
          (1) APPARENT DUPLICATION WITH DIMHRS;
          (2) MODULAR CLUSTERING AND A 'WATERFALL' APPROACH IS NOT THE
  PREFERRED METHOD FROM AN IT PERSPECTIVE;
          (3) ACCURATE MODULAR ('PARENT') LEVEL COSTS ESTIMATES ARE NOT
  POSSIBLE;
          (4) THE MAGNITUDE OF POLICY CHANGES INVOLVED AS A RESULT OF
  BPR; AND,
          (5) THE FUTURE OF MARINE ONLINE.
      B.  THE QLB CONCURRED WITH THE FOLLOWING RECOMMENDATIONS:
          (1) IDENTIFY SPECIFIC TOTAL FORCE ADMINISTRATION CAPABILITIES    
      FOR DIMHRS DEVELOPMENT;
          (2) DEVELOP BUNDLED CAPABILITIES PACKAGES (BCP) IN LIEU OF
  MODULAR DEVELOPMENT TO ALLOW FOR A 'HORIZONTAL' CUT OF CLOSELY
  INTERRELATED PROCESSES [SOME CAPABILITIES WILL BE IDENTIFIED AND
  BUNDLED FOR MCTFS SYSTEM CHANGE REQUESTS, SOME CAPABILITIES WILL BE
  IDENTIFIED AND BUNDLED FOR OTHER PROGRAM SYSTEM CHANGE REQUESTS,
  AND THE REMAINING CAPABILITIY WILL BE BUNDLED FOR NEW DEVELOPMENT];
          (3) COST ESTIMATES, FOR EACH BCP, WILL BE COMPLETED AFTER
  THE BPR FOR THE ASSOCIATED MODULE IS COMPLETE.  THIS COSTING
  APPROACH WILL REDUCE THE TIME BETWEEN PLANNING AND INITIAL
  DEVELOPMENT, AND ALLOWS FOR AN EVOLUTIONARY PROCUREMENT STRATEGY;
          (4) POLICY CHANGES THAT REQUIRE CONCURRENCE/APPROVAL OUTSIDE
  OF M&RA WILL BE FLAGGED, PARTICULARLY THOSE INVOLVING DFAS; AND,
          (5) MARINE ONLINE WILL TRANSITION FROM A TECHNOLOGY
  DEMONSTRATOR TO THE OFFICIAL MARINE CORPS TOTAL FORCE ADMINISTRATION
  WEB-ENABLER, PENDING SUCCESSFUL NETWORK, OPERATING SYSTEM AND
  HARDWARE TESTING.
      C.  THE QLB CONCURRED WITH THE RECOMMENDATION TO MERGE MARINE    
      ONLINE INTO THE TFAS PROGRAM AT MILESTONE B AS A TECHNICAL READINESS
  LEVEL SEVEN (TRL-7) PROTOTYPE.
      D.  THE ISSUE OF A 'UNIVERSAL/ONCE-IN-A-CAREER' EMAIL ACCOUNT FOR
  EVERY MARINE WAS REEMPHASIZED.  C4 ACKNOWLEDGES THE URGENT NATURE OF
  THE REQUIREMENT AND HAS THE LEAD TO PURSUE WITHIN THE CONSTRUCT OF
  NMCI.
  9.  MARCORSYSCOM PM-IS PROVIDED A TFAS PROGRAM UPDATE.  THE TOTAL
  FORCE ADMINISTRATION PROGRAM IS APPROACHING MILESTONE B, WHICH IS
  SCHEDULED FOR SEP 01, WHICH WILL LEAD TO SYSTEM DEMONSTRATION AND
  SYSTEM INTEGRATION.  AT MILESTONE B, THE MILESTONE DECISION
  AUTHORITY WILL BE ASKED TO APPROVE THE TECHNICAL ARCHITECTURE STUDY
  REPORT, ACQUISITION STRATEGY, ACQUISITION PROGRAM BASELINE
  AGREEMENT, LIFE CYCLE COST ESTIMATE, TEST AND EVALUATION MASTER
  PLAN, AND THE SYSTEM SECURITY AUTHORIZATION AGREEMENT.
  10.  PROGRAM OBJECTIVES AND MILESTONES ARE ON TRACK.  IN SUMMARY,
  FIELD LEVEL CONSOLIDATIONS ARE NEARING COMPLETION, PROGRAM
  DEVELOPMENT AND BUSINESS PROCESS RE-ENGINEERING ARE PROGRESSING
  ACCORDING TO PLAN.  DISCUSSIONS ARE UNDERWAY TO IMPLEMENT BCP'S ON    
      MARINE ONLINE IN FY02 WHICH WILL PROVIDE FIRST THROUGH THIRD
  ECHELON FUNCTIONALITY.
  11.  THE QLB APPROVED ADDITIONS TO THE QLB AS REFLECTED BELOW;
  ANNOTATE THE FOLLOWING CHANGES TO REF A, PARA 3.E ACCORDINGLY:
      A.  ADD: "REPRESENTATIVE DFAS-KC MCTFS PAY," AS A QLB MEMBER.
      B.  ADD: "REPRESENTATIVE TECHNOLOGY SERVICES ORGANIZATION (TSO)
  - KANSAS CITY," AS A NON-VOTING PARTICIPANT, RECOGNIZING THEM AS A
  STRATEGIC PARTNER WITH THE MISSA AND DFAS FOR MCTFS DEVELOPMENT.
  12.  THE NEXT QLB IS SCHEDULED FOR 10-11 SEP 01 IN KANSAS CITY.  NOTE
  THE CHANGE IN DATES FROM 13-14 SEP DUE TO THE MCTFS CONF.
  13.  POC ARE LTCOL KATZ, MR. JAMES D. KENKEL, OR CWO4 BINNS (MIP),
  DSN 278-9060, COML (703)784-9060.//
  BT