Federal Register Supplement


FINAL - 28 October 1986

DEPARTMENT OF DEFENSE

Corps of Engineers, Department of the Army

33 CFR Parts 320, 321, 322, 323, 324, 325, 326, 327, 328, 329 and 330

Final Rule for Regulatory Programs of the Corps of Engineers

AGENCY: Corps of Engineers, Army Department, DOD.

ACTION: Final rule.

************************************************************


SUMMARY: We are hereby issuing final regulations for the regulatory program of the Corps of Engineers. These regulations consolidate earlier final, interim final, and certain proposed regulations along with numerous changes resulting from the consideration of the public comments received. The major changes include modifications that provide for more efficient and effective management of the decision-making processes, clarifications and modifications of the enforcement procedures, modifications to the nationwide permit program, revision of the permit form, and implementation of special procedures for artificial reefs as required by the National Fishing Enhancement Act of 1984.

EFFECTIVE DATE: January 12, 1987.

FOR FURTHER INFORMATION CONTACT: Mr. Sam Collinson or Mr. Bernie Goode, HQDA (DAEN-CWO-N), Washington, DC 20314-1000, (202) 272-0199.

SUPPLEMENTARY INFORMATION:

Consolidation of Corps Permit Regulations

These final regulations consolidate and complete the six following rulemaking events affecting the Corps regulatory program:

1. Interim Final Regulations. These regulations contained Parts 320-330 and were published (47 FR 31794) on July 22, 1982, to incorporate policy and procedural changes resulting from legislative, judicial, and administrative actions that had occurred since the previous final regulations had been published in 1977. Because it had been almost two years since we had proposed changes to the 1977 regulations, we published the 1982 regulations as "interim final" and asked for public comments. We received nearly 200 comments.

2. Proposed Regulatory Reform Regulations. On May 12, 1983, we published (48 FR 21466) proposed revisions to the interim final regulations to implement the May 7, 1982, directives of the Presidential Task Force on Regulatory Relief. The Task Force directed the Army to reduce uncertainty and delay, give the states more authority and responsibility, reduce conflicting and overlapping policies, expand the use of general permits, and redefine and clarify the scope of the permit program. Since these regulations proposed changes to our existing nationwide permits and the addition of two new nationwide permits, a public hearing was held in Washington, DC, on October 12, 1983, to obtain comments on these proposed changes. As a result of the public comments received, nearly 500 in response to the proposed regulations and 22 at the public hearing, we have determined that some of the proposed revisions should be adopted and some should not. We have adopted some of the provisions that were designed to clarify policies for evaluating permit applications, to revise certain permit processing procedures, to add additional conditions to existing nationwide permits, and to modify certain nationwide permit procedures. We have not adopted some of the other proposed changes, including the two proposed new nationwide permits.

3. Settlement Agreement Final Regulations. On October 5, 1984, we published (49 FR 39478) final regulations to implement a settlement agreement reached in a suit filed by 16 environmental organizations in December of 1982 against the Department of the Army and the Environmental Protection Agency ( NWF v. Marsh ) concerning several provisions of the July 22, 1982, interim final regulations. The court approved the settlement agreement on February 10, 1984, and on March 29, 1984, we published (49 FR 12660) the implementing proposed regulations. We received over 150 comments on these proposed regulations covering a full range of views. Those comments which were applicable to the provisions of the March 29, 1984, proposals were considered and addressed in the final regulations published on October 5, 1984. The remaining comments have been considered in the development of the final regulations we are issuing today.

In the October 5, 1984, final rule there were several new provisions relating to the 404(b)(1) guidelines. In 33 CFR 320.4(a)(1) we clarified the fact that no 404 permit can be issued unless it complies with the 404(b)(1) guidelines. If a proposed action complies with the guidelines, a permit will be issued unless the district engineer determines that it will be contrary to the public interest. In 33 CFR 323.6(a) we stated that district engineers will deny permits for discharges which fail to comply with the 404(b)(1) guidelines, unless the economic impact on navigation and anchorage necessitates permit issuance pursuant to section 404(b)(2) of the Clean Water Act. Although no 404 permit can be issued unless compliance with the 404(b)(1) guidelines is demonstrated (i.e., compliance is a prerequisite to issuance), the 404(b)(1) evaluation is conducted simultaneously with the public interest review set forth in 33 CFR 320.4(a).

4. Proposed Permit Form Regulations. On May 23, 1985, we published (50 FR 21311) proposed revisions to 33 CFR Part 325 (Appendix A), which contains the standard permit form used for the issuance of Corps permits and the related provisions concerning special conditions. This proposal provided for the complete revision of the permit form and its related provisions to make them easier for permittees to understand. General permit conditions were written in plain English and greatly reduced in number; unnecessary material was deleted; and material which is informational in nature was reformatted under a "FURTHER INFORMATION" heading. We received 18 comments on this proposal.

5. Proposed Regulations to Implement the National Fishing Enhancement Act of 1984 (NFEA). On July 26, 1985, we published (50 FR 30479) proposed regulations to implement a portion of the Corps regulatory responsibilities pursuant to the NFEA. Specialized procedures relative to the processing of Corps permits for artificial reefs were proposed for inclusion in Parts 322 and 325. Eight organizations commented on these proposed regulations. The NFEA also authorizes the Secretary of the Army to assess a civil penalty on any person who, after notice and an opportunity for a hearing, is found to have violated any provision of a permit issued for an artificial reef. Procedures for implementing such civil penalties will be proposed at a later date. In addition, we are hereby notifying potential applicants for artificial reef permits that the procedures contained in Part 323 relating to the discharge of dredged or fill materials and those in Part 324 relating to the transportation of dredged material for the purpose of dumping in ocean waters will be used in the processing of artificial reef permits when applicable.

6. Proposed Regulations (Portion of Part 323 and All of Part 326. On March 20, 1986, we published (51 FR 9691) a proposed change to 33 CFR 323.2(d), previously 323.2(j), to reflect the Army's policy regarding de minimis or incidental soil movements occurring during normal dredging operations and a proposed, complete revision of the Corps of Engineers enforcement procedures (33 CFR Part 326). Seventeen comment letters were received on these proposed regulations. These comments and the resulting changes reflected in the final regulations for 323.2(d) and Part 326 are discussed in detail below.

Environmental Documentation

We have determined that this action does not constitute a major Federal action significantly affecting the quality of the human environment. Appropriate environmental documentation has been prepared for all permit decisions. Environmental assessments for each of the nationwide permits previously issued or being modified today are available from the Corps of Engineers. You may obtain these assessments by writing to the address listed in this preamble. Considering the potential impacts, we have determined that none required an environmental impact statement.

Discussion of Public Comments and Changes

Part 320 - General Regulatory Policies

Section 320.1(a)(6): In order to provide clarity to the public, we have added a provision to codify existing practice that when a district engineer makes certain determinations under these regulations, the public can rely on that determination as a Corps final agency action.

Section 320.3(o): The National Fishing Enhancement Act of 1984 has been added to the list of related laws in Section 320.3.

Section 320.4: In the May 12, 1983, proposed rule and the March 29, 1984, proposed rule we proposed changes to 320.4(a)(1) - public interest review, 320.4(b)(5) - effect on wetlands, 320.4(c) - fish and wildlife, 320.4(g) - consideration of property ownership, and 320.4(j) - other Federal, state or local requirements. Changes to these paragraphs were adopted in the October 5, 1984, final rule. The various comments relating to these proposals have been fully discussed in the October 5, 1984 final rule (49 FR 39478).

Section 320.4(a)(3): Many commenters objected, some strongly, to the deletion in the October 5, 1984, final regulations of the term "great weight" from paragraph 320.4(c), the paragraph concerning the consideration of opinions expressed by fish and wildlife agencies. Many stated that fish and wildlife agencies had the expertise and knowledge to know the impact of work in wetlands; therefore, their opinions should be given strong consideration. Some commenters supported removal of the "great weight" statement expecting less value would be given fish and wildlife agency views. It is not our intention to reduce or discount the value or expertise of fish and wildlife agency comments or those of any other experts in any field. Comments also varied from support of to objection to the deletion of the "great weight" statement from the other policy statements such as energy and navigation in Section 320.4. Therefore, we added a new paragraph (a)(3) to clarify our position on how we consider comments from the public, including those from persons or agencies with special expertise on particular factors in the public interest review.

Section 320.4(b)(1): One commenter objected to the placement of the word "some" in this paragraph as a rewrite of E.O. 11990 which places no qualifier on "wetlands" indicating that all wetlands are vital. We have found through experience in administering the Section 404 permit program that wetlands vary in value. While some are vital areas, others have very little value; however, most are important. We recognize that "some wetlands are vital..." is being read by some people as "Some wetlands are important..." This was not our intent. To avoid this confusion we have revised this paragraph by deleting "some wetlands are vital areas..." and indicating that "most" wetlands are important.

Section 320.4(b)(2)(vi): We have included in the list of important wetlands those wetlands that are ground water discharge areas that maintain minimum baseflows important to aquatic resources. Scientific research now indicates that wetlands more often serve as discharge areas than recharge areas. Those discharge areas which are necessary to maintain a minimum baseflow necessary for the continued existence of aquatic plants and animals are recognized as important.

Section 320.4(b)(2)(viii): We have included in the list of important wetlands those which are unique in nature or scarce in quantity to the region or local area.

Section 320.4(d): We have revised this paragraph to clarify that impacts from both point source and non-point source pollution are considered in the Corps public interest review. However, Section 208 of the Clean Water Act provides for control of non-point sources of pollution by the states.

Section 320.4(j)(1): Clarifying language has been added to this section to eliminate confusion regarding denial procedures when another Federal, state, and/or local authorization or certification has been denied.

Section 320.4(p): Some commenters felt that environmental considerations should take precedence over other factors. Other commenters believed that guidance should be given as to who determines whether there are environmental benefits to a project. Many commenters indicated that the regulation does not define the possible range of environmental benefits that will be considered. Environmental benefits are determined by the district engineer and the district staff based on responses received from the general public, special interest groups, other government agencies and staff evaluation of the proposed activity. Defining the possible range of environmental benefits would be almost impossible to cover in the rules in sufficient detail, since circumstances vary considerably for each permit application. After considering all the comments we have decided to make the change as proposed on May 12, 1983.

Section 320.4(q): Some commenters believed that this rule would distort review criteria by inserting inappropriate economic assumptions and minimizing environmental criteria. Some commenters suggested that the Corps revise this paragraph to include a provision to challenge an applicant's economic data and that of governmental agencies as well. Other commenters believe that economic factors do not belong in these regulations since the intent of the Clean Water Act is: "to restore and maintain the chemical, physical, and biological integrity of the nation's waters"; therefore, any regulation under the CWA should have, as its primary objective, provisions which give environmental factors the greatest weight. They were concerned that this part may be applied to allow economic benefits to offset negative environmental effects. Some commenters, however, believed that the Corps should assume that projects proposed by state and local governmental interests and private industry are economically viable and are needed in the marketplace. They also believed that the Corps and other governmental agencies should not engage in detailed economic evaluations. Economics has been included in the Corps list of public interest factors since 1970. However, there has never been a specific policy on economics in the regulations. The Corps generally accepts an applicant's determination that a proposed activity is needed and will be economically viable, but makes its own decision on whether a project should occur in waters of the U.S. The district engineer may determine that the impacts of a proposed project on the public interest may require more than a cursory evaluation of the need for the project. The depth of the evaluation would depend on the significance of the impacts and in unusual circumstances could include an independent economic analysis. The Corps will balance the economic need for a project along with other factors of the public interest. Accordingly, paragraph 320.4(q) has been modified from the proposed rule to provide that the district engineer may make an independent review of the need for a project from the perspective of the public interest.

Section 320.4(r): Many comments were offered as to the intent, scope and implementation of the proposed mitigation policy. Comments were almost equally divided between those who felt that the policy should be expanded and those that felt it should be more limited. The issues that were raised include: mitigation should not be used to outweigh negative public interest factors; mitigation should not be integrated into the public interest review; mitigation should be on-site to the maximum extent practicable; off-site mitigation extends the range of concerns beyond those required by Section 404. A wide range of views were expressed on our proposed mitigation policy, but virtually all commenters expressed need for a policy. The Corps has been requiring mitigation as permit conditions for many years based on our regulations and the 404(b)(1) guidelines. Because of the apparent confusion on this matter, we have decided to clarify our existing policy at 320.4(r).

The concept of "mitigation" is many-faceted, as reflected in the definition provided in the Council on (Environmental Quality (CEQ) NEPA regulations at 40 CFR 1508.20. Viewing "mitigation" in its broadest sense, practically any permit condition or best management practice designed to avoid or reduce adverse effects could be considered "mitigation." Mitigation considerations occur throughout the permit application review process and are conducted in consultation with state and Federal agencies responsible for fish and wildlife resources. District engineers will normally discuss modifications to minimize project impacts with applicants at pre-application meetings (held for large and potentially controversial projects) and during the processing of applications. As a result of these discussions, district engineers may condition permits to require minor project modifications, even though that project may satisfy all legal requirements and the public interest review test without those modifications.

For applications involving Section 404 authority, mitigation considerations are required as part of the Section 404(b)(1) guidelines analysis; permit conditions requiring mitigation must be added when necessary to ensure that a project complies with the guidelines. To emphasize this, we have included a footnote to 320.4(r) regarding mitigation requirements for Section 404, Clean Water Act, permit actions. Some types of mitigation measures are enumerated in Subpart H of the guidelines. Other laws such as the Endangered Species Act may also lead to mitigation requirements in order to ensure that the proposal complies with the law. In addition to the mitigation developed in preapplication consultations and through application of the 404(b)(1) guidelines and other laws, these regulations provide for further mitigation should the public interest review so indicate.

One form of mitigation is "compensatory mitigation," defined at 40 CFR 1508.20(e) to mean "compensating for the impact by replacing or providing substitute resources or environments." Federal and state natural resource agencies sometimes ask the Corps to require permit applicants to compensate for wetlands to be destroyed by permitted activities. Such compensatory mitigation might be provided by constructing or enhancing a wetland; by dedicating wetland acreage for public use; or by contributing to the construction, enhancement, acquisition or preservation of such "mitigation lands." Compensatory mitigation of this type is often referred to as "off-site" mitigation. However, it can be provided either on-site or off-site. Such mitigation can be required by permit conditions only in compliance with 33 CFR 325.4, and specifically with 33 CFR 325.4(a)(3). In addition to those restrictions, the Corps has for many years declined to use, and does now decline to use, the public interest review to require permit applicants to provide compensatory mitigation unless that mitigation is required to ensure that an applicant's proposed activity is not contrary to the public interest. If an applicant refuses to provide compensatory mitigation which the district engineer determines to be necessary to ensure that the proposed activity is not contrary to the public interest, the permit must be denied. If an applicant voluntarily offers to provide compensatory mitigation in excess of the amount needed to find that the project is not contrary to the public interest, the district engineer can incorporate a permit condition to implement that mitigation at the applicant's request.

Part 321 Permits for Dams and Dikes in Navigable Waters of the United States. The Secretary of the Army delegated his authority under Section 9 of the Rivers and Harbors Act of 1899, 33 U.S.C. 401 to the Assistant Secretary of the Army (Civil Works). The Assistant Secretary in turn delegated his authority under Section 9 for structures in intrastate navigable waters of the United States to the cheif of Engineers and his authorized representative. District engineers have been authorized in 33 CFR 325.8 to issue or deny permits for dams or dikes in intrastate navigable waters of the United States" under Section 9 of the Rivers and Harbors Act of 1899. This section of the regulation and Sections 325.5(d) and 325.8(a) have been revised to reflect this delegation.

Part 322 Permits for Structures or Work in or Affecting Navigable Waters of the United States.

Section 322.2(a): We have revised the term "navigable waters of the United States" to reference 33 CFR Part 329 since it and all other terms relating to the geographic scope of the Section 10 program are defined at 33 CFR Part 329. Section 322.2(b) : Commenters on the definition of structures indicated that several terms needed further amplification. It was suggested that the term "boom" be defined to exclude a float boom, as would be used in front of a spillway. The term was not redefined because those dams constructed in Section 10 waters do require a permit for a float boom. However, most dams in the United States are constructed in non-Section 10 waters and do not require a permit for a boom (floating or otherwise) unless it involves the discharge of dredged or fill material. It was suggested that the term "obstacle or obstruction" be modified to reinstitute the language from the July 19, 1977, final regulations. We have adopted the suggestion which will clarify our intent that obstacles or obstructions, whether permanent or not, do require a permit; it will also assist in jurisdictional decisions on enforcement. It was suggested that "boat docks" and "boat ramps" be included in the list of structures, since these are frequently proposed structures. These have been included. It was suggested that the term "artificial gravel island" be added, as Congress, by Section 4(e) of the Outer Continental Shelf Lands Act of 1953, extended the regulatory program to the Outer Continental Shelf, and specifically cited artificial islands as falling under Section 10 jurisdiction. This type of structure is also constructed on state lands within the territorial seas. Accordingly, artificial islands have been included.

Section 322.2(c): Two commenters discussed the definition of "work"; one stated that it was too broad and the other that it should be expanded. The present definition of the term "work" has remained unchanged for many years and has achieved general acceptance by the regulators and those requiring a permit. The present language has been retained.

Sections 322.2(f)(2) and 323.2(n)(2): Both of these sections are concerned with the definition of general permits. Several commenters expressed support for the additional criteria contained in the May 12, 1983 proposed rule. Other commenters expressed concern that the proposed criteria were illegal. Some commenters believed that the proposal would amount to a delegation of the Section 404 program to the states, and that this is not a prerogative of the Corps of Engineers. Many commenters expressed serious concern that state programs were not comprehensive enough to properly represent the public interest review. Still others objected to the proposal because there were no assurances that the state approved projects themselves were "similar in nature" or would have "minimal adverse environmental effects"; those objections extended to the proposal to assess the impacts of the differences in the State/Corps decisions. Some commenters suggested that an automatic "kick-out" provision, whereby concerned agencies could cause the Corps to require an individual application on a case-by-case basis, may provide sufficient safeguards for the proposal to go forward. Some commenters suggested that a preferred approach to reducing duplication would be for the Corps to express, in its regulations, direction for its districts to vigorously pursue joint processing, permit consolidation, pre- application consultation, joint applications, joint public notices and special area management planning. This change was proposed in 1983. At that time we believed that additional flexibility in the types of general permits which could be developed was necessary to effectively administer the regulatory program. Our experience since then has shown that the existing definitions of general permit at both of these sections is flexible enough to develop satisfactory general permits. Therefore we have decided not to adopt this proposed change. Because several definitions previously found in Part 323 have been moved to Part 328, paragraph 323.2(n) has been redesignated 323.2(h).

Section 322.2(g): This section adds the definition of the term "artificial reefs" from the National Fishing Enhancement Act and clarifies what activities or structures the term does not include. Two commenters suggested modifications, or clarifications, to this definition to ensure that old oil and gas production platforms can be considered for use as artificial reefs. We agree with their suggestion. The definition would include the use of some production platforms, either abandoned in place or relocated, as artificial reefs as long as they are evaluated and permitted as meeting the standards of Section 203 of the Act.

Section 322.2(h): This section was proposed to add the definition of the term "outer continental shelf" from the Outer Continental Shelf Lands Act (OCSLA). Two commenters suggested that the territorial sea off the Gulf Coast of Florida and Texas is greater than three nautical miles from the coast line. We have determined that this is not the case, and have decided not to include a definition of the term "outer continental shelf" in these regulations and to rely instead on the definition of this term that is already in the OCSLA.

Sections 322.3(a) and 322.4: Activities which do not require a permit have been moved from Section 322.3 and included in Section 322.4. The limitation of the applicability of Section 154 of the Water Resource Development Act of 1976 in certain waterbodies has been deleted because no such limitation exists in that Act.

Section 322.5(b): This section addresses the policies and procedures for processing artificial reef applications. One commenter suggested that the opportunity for a general permit should not be precluded by this section. A general permit for artificial reefs is not precluded by this regulation change. Furthermore, the opportunity for the issuance of general permits may be enhanced with the implementation of the National Artificial Reef Plan by the Department of Commerce.

Section 322.5(b)(1): This section cites the standards established under section 203 of the National Fishing Enhancement Act. These standards are to be met in the siting and construction, and subsequent monitoring and managing, of artificial reefs. Two commenters insisted that these should be called goals or objectives, and several commenters said that more specific guidelines or criteria are needed to evaluate proposed artificial reefs against the standards or goals. Section 204 of the Act states that the Department of Commerce will develop a National Artificial Reef Plan which will be consistent with the standards established under Section 203, and will include criteria relating to siting, constructing, monitoring, and managing artificial reefs. Specification of such criteria in these rules would be inappropriate in view of the intent of Congress to have the Department of Commerce perform this function. The National Marine Fisheries Service (NMFS), acting for the Department of Commerce, has consulted with us in developing the National Artificial Reef Plan, and we will continue to consult with them to ensure permits are issued consistent with the criteria established in that plan. The Department of Commerce announced the availability of the National Artificial Reef Plan in the Federal Register on November 14, 1985.

The U.S. Coast Guard was particularly concerned that these rules be more specific with regard to information and criteria that will be used to ensure navigation safety and the prevention of navigational obstructions. Section 204 of the National Fishing Enhancement Act requires that the Department of Commerce consult the U.S. Coast Guard in the development of the National Artificial Reef Plan regarding the criteria to be established in the plan. One of the standards with which the criteria must be consistent is the prevention of unreasonable obstructions to navigation. In addition, the district engineer shall consult with any governmental agency or interested party, as appropriate, in issuing permits for artificial reefs. This includes pre-application consultation with the U.S. Coast Guard, and placing conditions in permits recommended by the U.S. Coast Guard to ensure navigational safety.

Section 322.5(b)(2) and (3): These sections state that the district engineer will consider the National Artificial Reef Plan, and that he will consult with governmental agencies and interested parties, as necessary, in evaluating a permit application. Two commenters supported this coordination. The NMFS requested notification of decisions to issue permits which either deviate from or comply with the plan. Paragraph (b)(2) requires the district engineer to notify the Department of Commerce of any need to deviate from the plan. In addition, the NMFS receives a monthly list of permit applications on which the district engineer has taken final action. This should be sufficient notification for those permits which do not deviate from the plan.

Section 322.5(b)(4): Although some commenters strongly supported this section describing the liability of permittees authorized to build artificial reefs, several expressed concern that this provision was not clearly written or required specific criteria to assist the district engineer in determining financial liability. This paragraph has been rewritten to correspond closely with the wording in the National Fishing Enhancement Act, and examples of ways an applicant can demonstrate financial responsibility have been added.

Section 322.5(g): We have revised this paragraph on canals and other artificial waterways by eliminating procedural-only provisions which are redundant with requirements in 33 CFR Parts 325 and 326.

Section 322.5(l): A new section on fairways and anchorage areas has been added. This section was formerly found at 33 CFR 209.135. We are moving this provision to consolidate all of the permit regulations on structures to this part. We will delete 33 CFR 209.135 by separate notice in the Federal Register.

Part 323 - Permits for Discharges of Dredged or Fill Material Into Waters of the United States.

Section 323.2: Several commenters supported moving the definitions relating to waters of the United States to a separate paragraph. As proposed on May 12, 1983, we have moved the term "waters of the United States" and all other terms related to the geographic scope of jurisdiction of Section 404 of the CWA to 33 CFR Part 328 which is titled "Definition of the Waters of the United States." We believe that, by setting these definitions apart in a separate and distinct Part of the regulation and including in that Part all of the definitions of terms associated with the scope of the Section 404 permit program, we are better able to clarify the scope of our jurisdiction. We have not changed any existing definitions nor added any definitions proposed on May 12, 1983. Comments related to these definitions are addressed in Part 328 below.

We have not changed the definition of fill material at Section 323.2(e). However, the Corps has entered into a Memorandum of Agreement with the Environmental Protection Agency to better identify the difference between Section 402 and Section 404 discharges under the Clean Water Act.

Section 323.2(d) - Previously 323.2(j): The proposed modification of this paragraph states that de minimis or incidental soil movement occurring during normal dredging operations" is not a "discharge of dredged material," the term defined by this paragraph.

Eight commenters raised concerns relating to this provision. Most of these supported the regulation of de minimis or incidental soil movement occurring during normal dredging operations" in varying degrees. Two specifically expressed a belief that the fallback from dredging operations constituted a discharge within the intent of Section 404 of the Clean Water Act. One of these stated that the proposed provision was contrary to a binding decision by the U.S. District Court for the Northern District of Ohio in Reid v. Marsh, No.C-81- 690 (N.D. Ohio, 1984). Another commenter objected to the provision on the basis that it would force states that perceived a need to regulate dredging operations to regulate such activities under their National Pollutant Discharge Elimination System authority. The recommendations of the above group of commenters included the regulation of dredging activities on an individual or general permit basis or on a selective basis that would take into account the scopes and anticipated effects of the projects involved. Two commenters expressed concern over the fact that discharge activities such as the sidecasting of dredged material might be considered "soil movement" that was "incidental" to a "normal dredging operation." The final concern raised related to the list of dredging equipment cited as examples. This list was seen, alternatively, as too limited or as not limited enough in reference to the types of equipment that may be used in a "normal dredging operation." Four commenters supported the proposed provision as a reasonable interpretation of the Section 404 authority of the Corps.

Section 404 clearly directs the Corps to regulate the discharge of dredged material, not the dredging itself. Dredging operations cannot be performed without some fallback. However, if we were to define this fallback as a "discharge of dredged material," we would, in effect, be adding the regulation of dredging to section 404 which we do not believe was the intent of Congress. We have consistently provided guidance to our field offices since 1977 that incidental fallback is not an activity regulated under section 404. The purpose of dredging is to remove material from the water, not to discharge material into the water. Therefore, the fallback in a "normal dredging operation" is incidental to the dredging operation and de minimis when compared to the overall quantities removed. If there are tests involved, we believe they should relate to the dredging operator's intent and the result of his dredging operations. If the intent is to remove material from the water and the results support this intent, then the activity involved must be considered as a "normal dredging operation" that is not subject to Section 404.

Based on the above discussion, we have not adopted any of the recommendations relating to the revision or deletion of this provision for the purpose of bringing about the regulation of "normal dredging operations" in varying degrees. We have replaced the "or" between the words " de minimis " and "incidental" with a comma to more clearly reflect the fact that the incidental fallback from a "normal dredging operation" is considered to be de minimis when compared to the overall quantities removed. In addition, we have deleted the examples of dredging equipment at the end of the proposed provision to make it clear that de minimis or incidental soil movement occurring during any "normal dredging operation" is not a "discharge of dredged material." However, we wish to also make it clear that this provision applies only to the incidental fallback occurring during "normal dredging operations" and not to the disposal of the dredged material involved. If this material is disposed of in a water of the United States, by sidecasting or by other means, this disposal will be considered to be a "discharge of dredged material" and will be subject to regulation under Section 404.

Section 323.4: We have made some minor corrections to this section to be consistent with EPA's permit exemption regulations at 40 CFR Part 233.

Part 324 Ocean Disposal

Section 324.4(c): The language of this section on the EPA review process has been rewritten to clarify the procedures the district engineer will follow when the Regional Administrator advises that a proposed dumping activity does not comply with the criteria established pursuant to section 102(a) of the Marine Protection, Research and Sanctuaries Act (MPRSA), or the restrictions established pursuant to section 102(c) thereof, in accordance with the provisions of 40 CFR 225.2(b).

Part 325 Permit Processing

Several minor changes have been made in this part. These changes involve requesting additional information from an applicant, providing for a reasonable comment period, combining permit documentation, and documenting issues of national importance.

Section 325.1(b): This section has been rewritten to clarify the pre-application consultation process for major permit applications. No significant changes have been made in the content of this section.

Section 325.1(d)(1): One commenter on this content of applications paragraph asked that where, through experience, it has been found that specific items of additional information are routinely necessary for permit review, the district engineer should be allowed to develop supplemental information forms. Another observed that restricting production of local forms may inhibit joint permit application processes. If it becomes necessary to routinely request additional information, the Corps can change the application form, but that must be done at Corps headquarters with the approval of the Office of Management and Budget. This change does not place any additional restrictions on developing local forms. As is now the case, local forms may be developed for joint processing with a Federal or state agency.

Section 325.1(d)(8): This is a new section requiring an applicant to include provisions for siting, construction, monitoring and managing the artificial reef as part of his application for a permit. One commenter suggested that the criteria for accomplishing these activities must be completed in the National Artificial Reef Plan before establishment of such reefs can be encouraged. Another recommended that the regulation describe more specifically the information to be supplied by an applicant with regard to monitoring and maintaining an artificial reef. The plan includes general mechanisms and methodologies for monitoring the compliance of reefs with permit requirements, and managing the use of those reefs. It can be used as a guide for the information to be supplied by the permit applicant. Specific conditions for monitoring and managing, as well as for maintaining artificial reefs generally need to be site-specific and should be developed during permit processing.

The U.S. Coast Guard requested that they be provided copies of permit applications for artificial reefs, and that a permittee be required to notify the Coast Guard District Commander when reef construction begins and when it is completed so timely information can be included in notices to mariners. The district engineer may elect to consult with the Coast Guard, when appropriate, during the pre-application phase of the permit process. At any rate, the Coast Guard will receive public notices of permit applications, and may make recommendations to ensure navigational safety on a case-by-case basis. Appropriate conditions can be added to permits to provide for such safety.

Section 325.1(e): Several commenters expressed concern with language changes requiring only additional information "essential to complete an evaluation" rather than the former requirement for information to "assist in evaluation of the application." They felt this change would reduce the data base on which decisions would be made. They indicated further that without necessary additional information, district engineers would not be able to make a reasonable decision, the public's ability to provide meaningful comments would be limited, and resource agencies would have to spend more time contacting the applicant and gathering information. They felt this could increase delays rather than limiting them. Several commenters asked that the regulations be altered to specifically require submission of information necessary for a 404(b)(1) evaluation. Similar concerns were expressed with the change stating that detailed engineering plans and specifications would not be required for a permit application. Commenters advised that without adequate plans or the ability to routinely require supplemental information it may be impossible to insure compliance with applicable water quality criteria or make reasonable permit decisions. Other commenters wanted further restrictions placed on the district engineer's ability to request additional information. Suggestions included altering the regulations to specify the type, need for, and level of detail which could be requested, and requiring the district engineer to prepare an analysis of costs and benefits of such information. Some commenters objected to requirements for providing information on project alternatives and on the source and composition of dredged or fill material.

This paragraph has been changed as proposed. The intent of this change was to assure that information necessary to make a decision would be obtained, while requests for non-essential information and delays associated with such requests would be limited.

Section 325.2(a)(6): The new requirement to document district engineer decisions contrary to state and local decisions was adopted essentially as proposed. The reference to state or local decisions in the middle of this paragraph incorrectly did not reference paragraph 320.4(j)(4) in addition to paragraph 320.4(j)(2). The adopted paragraph references state and local decisions in both of these paragraphs.

Section 325.2(b)(1)(ii): The May 12, 1983, proposed regulations sought to speed up the process by reducing the standard 60 day comment/waiver period to 30 days for state water quality certifications. Commenters on this paragraph offered a complete spectrum of views from strong support for the proposed changes to strong opposition to the proposal. Comments within this spectrum included opinions that: states must have 60 days; certification time should be the same as allowed by EPA (i.e. 6 months); the proposal is illegal; it conflicts with some state water quality certification regulations and procedures; and it would reduce state and public input to the decision-making process. Most states objected to this reduction with many citing established water quality certification procedures required by statute and/or regulations which require notice to the public (normally 30 days) and which allow requests for public hearings which cannot be completed within the 30-day period. We have, therefore, retained the 60 day period in the July 22, 1982, regulations. Some Corps districts have developed formal or informal agreements with the states, which identify procedures and time limits for submittal of water quality certifications and waivers. Where these are in effect, problems associated with certifications are minimized.

Many commenters objected to the May 12, 1983, proposal to delete from the July 22, 1982, regulations the statement, "The request for certification must be made in accordance with the regulations of the certifying agency." Deleting this statement will not delete the requirement that valid requests for certification must be made in accordance with State laws. However, we have found that, on a case-by-case basis in some states, the state certifying agency and the district engineer have found it beneficial to have some flexibility to determine what constitutes a valid request. Furthermore, we believe that the state has the responsibility to determine if it has received a valid request. If this statement were retained in the Corps regulation, it would require the Corps to determine if a request has been submitted in accordance with state law. To avoid this problem, we have decided to eliminate this statement.

Section 325.2(d)(2): Numerous commenters expressed concern with comment periods of less than 30 days. They were concerned that, in order to expedite processing times, 15 day notices would become the norm. These commenters stated that 15 days was insufficient to prepare substantive comments and would not allow the public adequate participation in the permit process as mandated by Section 101 of the CWA. State agencies noted that, with internal and external mail requiring as much as a week each for the Corps and the state, 15 days would not provide any time for consideration of a project. Several commenters noted that such expedited review times might actually be counter-productive, as Federal and state agencies might routinely oppose projects and request permit denial so that they would then have sufficient time to review a project and to work with an applicant to resolve conflicts. We recognize that 15 days is a very short comment period considering internal agency processing and mail time. We expect that comment periods as short as 15 days would be used only for minor projects where experience has shown there would be little or no controversy. Some districts have been routinely using comment periods of less than 30 days (20 and 25 days) while others have used such procedures in only a limited number of special cases. In adopting this provision, we have modified the May 12, 1983, proposal to require the district engineer to consider the nature of the proposal, mail time, the need to obtain comments from remote areas, comments on similar proposals, and the need for site visits before designating public notice periods of less than 30 days. Additionally, after considering the length of the original comment period as well as those items noted above, the district engineer may extend the comment period an additional 30 days if warranted. We believe this provides the desired flexibility with the necessary restraints on when to use comment periods of less than 30 days.

Sections 325.2(e)(1) and 325.5(b)(2): Commenters supporting the use of letters of permission (LOP) for minor Section 404 activities stated that applicants will realize significant time savings for minor requests while there will be no loss in environmental protection. Objectors believe that the Corps is seeking administrative expediency at the cost of environmental protection. Issues raised by commenters include: the legality of the 404 LOP procedure without providing for notice and opportunity for public hearing (Section 404(a) of the CWA); the legality of issuing a permit which would become effective upon the receipt or waiver of 401 certification and/or a consistency certification under the CZMA; the need to be more definitive as to the criteria for making a decision as to the categories of activities eligible for authorization under the LOP; and the lack of coordination with Federal and state resource agencies. A few commenters were concerned that the notice in the May 12, 1983, Proposed Rules was insufficient because it did not give the scope and location of the work to be covered. The commenting states also indicated that the notice was insufficient for water quality certification and coastal zone consistency determination purposes. Other commenters were concerned that, while LOP's would be coordinated with Federal and state fish and wildlife agencies, other resource agencies such as EPA should also review Section 404 LOP's. Based on the comments on the proposed 404 LOP procedures, we have decided not to adopt the 404 LOP procedures as proposed. We are not changing Section 325.5(b)(2), LOP format, nor are we changing the section 10 LOP provisions. Rather, we have revised Section 325.2(e)(1) to describe a separate section 404 LOP process. Unlike the section 10 LOP process, the section 404 process involves the identification of categories of discharges and a generic public notice. This LOP process is a type of abbreviated permit process which could and has been developed under the July 22, 1982, interim final regulations. These procedures will avoid unnecessary paperwork and delays for many minor section 404 projects in accordance with the intent of Section 101(f) of the Clean Water Act.

Section 325.7(b): We have added a provision that, when considering a modification to a permit, the district engineer will consult with resource agencies when considering a change to terms, conditions, or features in which that agency has expressed a significant interest.

Section 325.9: One commenter generally supported this section on the district engineer's authority to determine jurisdiction but indicated that paragraph 325.9(c) should not be adopted because it reflects the provisions of a Memorandum of Understanding (MOU) with EPA and would not be applicable if the MOU is revised or deleted. We have determined that this paragraph is not now needed and have decided not to adopt it.