NEWSROOM | WHO WE ARE | MISSIONS | HISTORY | RELATED LINKS | Kids Corner
USACE Logo Seattle District In Action Relevant, Ready, Responsive and Reliable
 
Need Help or Assistance ???
 
Contact the Content Provider
 
 
Notice
 
This page was last updated by the Content Provider on 08-Jan-2009
 
 
Compliance
 
This site is 508 CompliantThis site is 508 Compliant
 
News Room Headline
      
 
Small lock closure March 10-21 at Chittenden Locks in Ballard

Contact:  Dick Devlin at 206.766.6447

March 3, 2008

 

SEATTLE--The small lock at the Hiram M. Chittenden Locks in Ballard will close to marine traffic for 12 days starting at 7 a.m. March 10 through 4 p.m. March 21 for annual maintenance, according to the Seattle District, U.S. Army Corps of Engineers, which operates the project.  

     Mariners may experience some delay during the period depending upon how heavy the demand for passage becomes.

     The small lock is capable of handling vessels up to 25 feet wide and 100 feet long while the large lock can be configured to be handle vessels as large as 760 feet by 80 feet.

     The large lock will remain open for boat traffic throughout this period and boaters should be prepared to use the large lock with appropriate equipment and crew.

     The scheduled repairs to the small lock are part of an annual general maintenance program.

     The Chittenden Locks safely transits well over 60,000 vessels each year between Lake Washington and Salmon Bay in Seattle’s Ballard neighborhood.

      If you have any questions or concerns, please contact the Project Control Tower at 206-783-7000.  A Lockmaster can help you with any questions you may have.

      For current information about activities at the Locks or “Locking Through”, check the Corps of Engineers website at: http://www.nws.usace.army.mil and select “Dams and Locks” then “Lake Washington Ship Canal” from the leftmost column.

 

###