Public Notice No./
Project Name/
Application No./
Comment Period
|
Applicant |
Location,
Project Description & Project Manager |
PN 08-80
Chesapeake Resort LLC
Hyatt
Marina Expansion
2006-62883-M07
December 19, 2008 |
January 6, 2009 |
|
Chesapeake Resort LLC
c/o Andrews, Miller & Associates, Inc.
401 Academy Street
Suite One
Cambridge, Maryland 21613
|
Location: Located at the Chesapeake Resort Marina on the Choptank River in Cambridge, Dorchester County, Maryland.
To construct Phases 2 & 3 of an existing marina in the Choptank River within the City of Cambridge, Dorchester County, Maryland.
Project Manager:
Maria Teresi
410-962-4501 |
PN 08-78
US Coast Guard
Ocean City
Maintenance Dredging
2008-03940-M01
December 17, 2008 |
January 20, 2009 |
|
US Coast Guard
c/o Collins Engineers, Inc.
297 Alexander Street
Suite 204
Cleveland, Ohio 44199
|
Location: In Sinepuxent Bay at the US Coast Guard's Ocean City Station, 610 S. Philadelphia Avenue, Ocean City, Worcester County, Maryland.
To maintenance dredge
Project Manager:
Woody Francis
410-962-5689 |
PN 08-77
SPECIAL PUBLIC NOTICE 08-77
Atlantic and Gulf Coastal Plain Interim Regional Supplement
December 9, 2008 |
March 8, 2009 |
|
|
Subject: Atlantic and Gulf Coastal Plain Interim Regional Supplement to the 1987 Wetland Delineation Manual
Point of Contact:
Jennifer McCarthy
410-962-4503 |
SPN
08-76
SPECIAL PUBLIC NOTICE 08-76
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting Legal Authorities
to Support the Protection of Marine Corps Base Quantico During
Force Protection Conditions Alpha through Delta/Homeland Security
Threat Advisories Blue through Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-75
SPECIAL PUBLIC NOTICE 08-75
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting
Legal Authorities to Support the Protection of Military Assets
During
Force Protection Condition Charlie or Delta/Homeland
Security Threat Advisory Orange or Red
Project Manager:
Steve Elinsky
410-962-4503 |
PN
08-74
1-78/1-81 Logistics Park
2007-08639-P04
Enclosures:
1. Site Plan
2. Location Map
3. Conservation Area Plan
4. Wetland Mitigation Plan, A-1
5. Wetland Mitigation Plan, A-2
6. Wetland Mitigation Plan, A-3
7. Crossings and Impacts
November 17, 2008 |
December 17, 2008 |
|
Jeffrey Camp
Lickdale Associates
633 West Germantown Pike, Suite 104
Plymouth Meeting, PA 19462
|
Location: Located at a point northwest of the intersection of State Route 72 and Bordnersville Road in Union Township, Lebanon County, Pennsylvania.
To discharge dredged and/or fill material in approximately 1.2 acres of Waters of the United States including wetlands for the purpose of constructing a warehouse facility along with other related site improvements on a 272 acre site, zoned industrial.
Project Manager:
Patricia Strong
410-962-1847 |
PN
08-73
Maryland State Highway Administration
Contract No, BA458B21
I-695: MD
41 to MD 147
2008-64379-M24
November 8, 2008 |
December 8, 2008 |
|
Maryland State Highway Administration
707 N. Calvert Street
Baltimore, Maryland 21202
|
Location: Unnamed tributaries to White Marsh Run, Baltimore County, Maryland.
To permanently impact 500 square feet of palustrine emergent wetlands and 5,950 linear feet of stream, which are Waters of the U.S., incidental to the Beltway widening from MD 41 to MD 147. This includes the widening and reconstruction of the inner loop, removal and replacement of the existing median barrier, outer loop widening, realigning the horizontal and vertical alignment of Old Harford Road, and drainage and stormwater management improvements. The project purpose is to increase capacity and improve the safety of the Baltimore Beltway. The 5,950 linear feet of stream channel will be relocated to the proposed/new toe of road slope.
Project Manager:
Mary Frazier
410-962-5679 |
SPN
08-72
SPECIAL PUBLIC NOTICE 08-72
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting
Legal Authorities to Support the Protection of Military Assets
During
Force Protection Condition Charlie or Delta/Homeland
Security Threat Advisory Orange or Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-71
SPECIAL PUBLIC NOTICE 08-71
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting Legal Authorities
to Support the Protection of Marine Corps Base Quantico During
Force Protection Conditions Alpha through Delta/Homeland Security
Threat Advisories Blue through Red
Project Manager:
Steve Elinsky
410-962-4503 |
PN
08-70
Selby Bay Yacht Club
Bulkheads, Piers, Pilings & Dredging
2008-63171-M18
October 30, 2008 |
November 14, 2008 |
|
Selby Bay Yacht Club
Mr. Michael Prokopchak
1116 Turkey Point Road
Edgewater, Maryland 21037
|
Location: 1116 Turkey Point Road, in Selby Bay, Edgewater, Anne Arundel
County, Maryland.
Mechanically dredge an area, approximately
90,150 square feet, within an existing marina basin to a depth
of -7.0 mean low water (MLW). The dredging will result in approximately
5,010 cubic yards of dredged material from the marina which will
be deposited at the Pasadena Boatel site, an approved upland disposal
site in Anne Arundel County.
Project Manager:
Richard Kibby
410-962-0694 |
SPN
08-69
SPECIAL PUBLIC NOTICE 08-69
Revision to the Pennsylvania State
Programmatic General Permit (PASPGP-3) Bog Turtle Habitat Clearance
Process and Nationwide Permit Regional Condition
|
|
Subject: Revision to the Pennsylvania State Programmatic General Permit
(PASPGP-3) Bog Turtle Habitat Clearance Process and Nationwide
Permit Regional Condition.
Project Manager:
Patricia Strong
410-962-1847 |
PN
08-68
Pennsylvania Power and Light (PPL)
Holtwood Hydroelectric Project
2006-10437-P04
(NOTE: Entire package can be retrieved as a zip file. Download
zip file here.)
October 17, 2008 |
November 17, 2008 |
Enclosures:
Enclosure
1 - Location Map
Enclosure
2 - Figure 1
Enclosure
3- Figure 2
Enclosure
4- Figure 3
Enclosure
5- Figure 4
Enclosure
6- Figure 5
Enclosure
7- Figure 6
Enclosure
8 - Exhibit 1
Enclosure
9- Exhibit 2
Enclosure
10 - Exhibit 3
Enclosure
11 - Exhibit 4
Enclosure
12 - Conceptual 2
Enclosure
13 - Conceptual 3
Enclosure
14 - Mitigation |
Pennsylvania Power and Light (PPL)
and
Holtwood Hydroelectric Project
|
Location: In the Susquehanna River between York and Lancaster Counties,
Pennsylvania.
To solicit comments from the Public
about the work described in the attached Public Notice.
Project Manager:
Patricia Strong
410-962-1847 |
PN
08-67
Maryland Port Administration,
Masonville DMCF
2006-63743-1
October 8, 2008 |
November 8, 2008 |
|
Maryland Port Administration (MPA)
c/o Mr. Nathaniel Brown Harbor Development 2310 Broening Highway
Baltimore, Maryland 21224
|
Location: Patapsco River, at Masonville, Baltimore City, Maryland
The MPA has requested a modification
to the referenced Department of the Army (DA) permit to mechanically
or hydraulically dredge in the previously-authorized borrow area
at the Masonville site to no more than -67 feet below mean low
water (MLW), rather than the previously-authorized depth of no
more than -60 feet below MLW. This request was made to insure
compliance with the terms and conditions of the DA permit should
dredging depths inadvertently exceed -60 feet below MLW.
Project Manager:
Jon Romeo
410-962-6079 |
PN
08-66
U.S. Navy, Naval Support Facility, Indian Head
2007-08519-M03
October 6, 2008 |
November 6, 2008 |
|
Naval Support Facility, Indian
Head
South Potomac
4271 Potomac Drive
Dahlgren, Virginia 22448-5100
|
Location: In tidal waters of the Potomac River, at the mouth of Mattawoman
Creek, Indian Head, Charles County, Maryland.
Protected shorelines from further
erosion, protected existing infrastructure, and wildlife habitat.
Project Manager:
Steven Harman
410-962-6082 |
SPN
08-65
SPECIAL PUBLIC NOTICE 08-65
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting
Legal Authorities to Support the Protection of Marine Corps Base
Quantico During Force Protection Conditions Alpha through Delta/Homeland
Security Threat Advisories Blue through Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-64
SPECIAL PUBLIC NOTICE 08-64
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting
Legal Authorities to Support the Protection of Military Assets
During Force Protection Condition Charlie or Delta/Homeland
Security Threat Advisory Orange or Red
Project Manager:
Steve Elinsky
410-962-4503 |
PN
08-63
Susquehanna Trail Distribution Project
2008-02248-P02
September 26, 2008 |
October 17, 2008 |
|
R. Michael Perot
White Rock Commercial, LLC
1501 LBJ Freeway
Suite 550
Dallas, Texas 75234
|
Location: Unnamed tributaries to Little Conewago Creek and adjacent wetlands,
Manchester Township, York County, Pennsylvania.
To discharge dredge and/or field
materials into waters of the USA including wetlands for the construction
of a 708,000 square foot class A warehouse distribution facility
and other associated infrastructure including truck parking areas,
double dock access, serviceable utilities, into storm water management
facilities on 58-acre parcel.
Project Manager:
Mike Danko
717-249-8730 |
PN
08-62
Anne Arundel County Department of
Public Works
Brady Cove
Dredging
2008-638239-M18
September 30, 2008 |
October 30, 2008 |
|
Anne Arundel County Department
of Public Works 2662 Riva Road Annapolis, Maryland 21401
|
Location: In Brady Cove, off Stony Creek, Anne Arundel County, Mayland.
To hydraulically or mechanically
maintenance dredge a 630-foot long by 30 foot wide main channel
to a depth of -3.5 feet to -4.5 feet mean low water (MLW) in Brady
Cove, a tributary to Stony Creek, Anne Arundel County, Maryland.
Additionally, 12 associated private spur channels, listed below,
are proposed fro dredging as further described below. The overall
dredging will result in approximately 4,672 cubic yards of dredged
material to be deposited at the approved CSX dredged material
placement (DMP) site in Anne Arundel County or other approved
County DMP site.
Project Manager:
Richard Kibby
410-962-0694 |
PN
08-61
Harford County Department of Parks
& Recreation
Swan Harbor
Dredging
2008-63843-M06
September 24, 2008 |
October 24, 2008 |
|
Harford County Department of Parks
& Recreation
702 North Tollgate Road
Bel Air, Maryland 21014
|
Location: In the Chesapeake Bay, Havre de Grace, Harford County, Maryland.
To dredge, by hydraulic or mechanical
method, a 1995-foot long by 50-foot wide segment of the Swan Harbor
Back Channel to a maximum depth of -6.5 feet mean low water (MLW),
including -0.5 feet of allowable over dredge. The resulting approximately
7,742 cubic yards of dredged material is to be deposited at the
approved Tydings Island dredged material placement (DMP) site.
The proposed dredging project area is approximately 124,169 square
feet. The purpose of the project is to improve navigable access.
Project Manager:
Phil Cwiek
410-962-6010 |
PN
08-60
Calvert Cliffs 3 Nuclear Project,
LLC
Unistar Nuclear Operating Services, LLC
2007-08123-M05
September 3, 2008 |
October 3, 2008 |
|
Calvert Cliffs 3 Nuclear Project,
LLC
Mr. Thomas E. Roberts
1650 Calvert Cliffs Parkway
Lusby, Maryland 20657
and
Unistar Nuclear Operating Services, LLC
Mr. Dimitri Lutchenkov
750 E. Pratt Street, 14th Floor Baltimore, Maryland 21202
|
Location: In the Chesapeake Bay and unnamed tributaries to the Chesapeake
Bay, forested nontidal wetlands, Johns Creek and Goldstein Branch
and their unnamed tributaries at Unistar's Calvert Cliffs site
near Lusby, Calvert County, Maryland.
The applicant propose, in accordance
with the attached plans, to perform site preparation activities
and construct supporting facilities at the site of a proposed
nominal 1,710 MW nuclear power generation station (Unit 3).
Project Manager:
Kathy
Anderson
410-962-5690 |
PN
08-58
Anne Arundel County Department of
Public Works
Parish Creek
Dredging
2008-63294-M24
Attachments:
Main
Channel
Spur
1
Spur
2
Spur
3
Spur
4
Spur
5
Spur
6
Spur
7
Spur
8
Spur
9
Spur
10
September 2, 2008 |
October 2, 2008 |
|
Anne Arundel County Department
of Public Works 2662 Riva Road Annapolis, Maryland 21401
|
Location: In Parish Creek, near Shady Side, Anne Arundel County, Maryland
To hydraulically or mechanically
dredge a 1,322 foot by 50 foot main channel and 125 foot by 30-foot
wide channel to a depth of -6.0 feet mean low water (MLW) in the
North Fork of Parish Creek. To hydraulically or mechanically dredge
a 615-foot by 40-foot channel and a 160-foot by 30-foot wide channel
to a depth of -6.0 feet mean low water (MLW) in the South Fork
of Parish Creek. Additionally, 10 associated spur channels are
proposed for dredging. The overall dredging will result in approx.
18,255 cubic yards of dredged material to be deposited at the
Idlewilde dredged material placement (DMP) site or other approved
County DMP site.
Project Manager:
Mary Frazier
410-962-5679 |
PN
08-57
Anne Arundel County Department of
Public Works
Old Glory Cove
Dredging
2008-63232-M24
September 15, 2008 |
October 15, 2008 |
|
Anne Arundel County Department
of Public Works 2662 Riva Road Annapolis, Maryland 21401
|
Location: In Old Glory Cove, off Stony Creek, Anne Arundel County, Maryland
To hydraulically or mechanically
dredge a 300-foot by 30-foot main channel to a depth of -3.5 to
-4.5 feet mean low water (MLW) in Old Glory Cove, a tributary to
Stony Creek. Additionally, 5 associated spur channels, listed below,
are proposed for dredging. The overall dredging will result in
approximately 1392 cubic yards of dredged material to be deposited
at the CSX dredged material placement (DMP) site or other County
DMP site.
Project Manager:
Mary Frazier
410-962-5679 |
SPN
08-56
SPECIAL PUBLIC NOTICE 08-56
Establishment of Restricted Areas
|
|
Project
Name:U.S. Army Corps of Engineers’ Action Granting
Legal Authorities to Support the Protection of Military Assets
During Force Protection Condition Charlie or Delta/Homeland
Security Threat Advisory Orange or Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-55
SPECIAL PUBLIC NOTICE 08-55
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting
Legal Authorities to Support the Protection of Marine Corps Base
Quantico During Force Protection Conditions Alpha through Delta/Homeland
Security Threat Advisories Blue through Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-54
Local Processing Procedures for
Jurisdictional Determinations
Regulatory
Guidance Letter
No. 08-02
|
|
Local
Processing Procedures for Jurisdictional Determinations.
Project Manager:
Beth Bachur
410-962-4336 |
PN
08-53
Maryland State Highway Administration
Project No. AW896A21
MD 404: US 50 to Denton Bypass
2007-07817-M13
Overview
Plans 1-8
Sheets 1 - 8
Sheets 9-15
Sheets 16-19
Sheets 20-28
Sheets 29-36
July 28, 2008 |
August 28, 2008 |
|
Maryland Department of Transportation
State Highway Administration
Attn: Ms. Susan Ridenoir
707 N. Calvert Street
Mailstop C-306
Baltimore, Maryland 21201
|
Location: This corridor project spans approximately 11 miles through Caroline,
Queen Anne's, and Talbot Counties.
To permanently impact Waters of
the United States, including jurisdictional wetlands incidental
to the dualization of Maryland Rte. 404 as a four lane divided
highway from the intersection with U.S. Rte. 50 to the western
terminus of the Denton Bypass.
Project Manager:
Rod
Schwarm
410-820-8550 |
PN
08-52
Scheminant, Tracy
2008-00802-M13
July 31, 2008 |
August 21, 2008 |
|
Mr. Tracy Scheminant
1628 Postal Road
Chester, MD 21619
|
Location: In tidally influenced high marsh off Broad Creek and the Chesapeake
Bay, at Lots 27 & 28, Block 36, Wallman Way, Bay City, Queen
Anne's County, Maryland.
Fill high marsh to construct a private
shared driveway and install utility lines under the shared driveway.
Project Manager:
Rod
Schwarm
410-820-8550 |
SPN
08-51
SPECIAL PUBLIC NOTICE 08-51
Establishment of Restricted Areas
|
|
Project
Name:U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Marine Corps Base Quantico
During Force Protection Conditions Alpha through Delta/Homeland
Security Threat Advisories Blue through Red.
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-50
SPECIAL PUBLIC NOTICE 08-50
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action during the
Force Protection Condition Charlie or Delta/Homeland Security
Threat Advisory Orange or Red.
Project Manager:
Steve Elinsky
410-962-4503 |
PN
08-49
Dominion Cove Point LNG
Pier Reinforcement Project
2008-01241-M05
(2008-61276)
July 18, 2008 |
August 18, 2008 |
|
Dominion Cove Point LNG, LP
|
Location: Existing offshore pier in the Chesapeake Bay at the Cove Point
Liquefied Natural Gas (LNG) import terminal in Calvert County,
Maryland.
Notice to Intent to Prepare an Environmental
Assessment for the proposed Pier Reinforcement Project and request
for comments on Environmental issues.
Project Manager:
Kathy
Anderson
410-962-5690 |
PN
08-48
Anne Arundel County Department of
Public Works
Mill Creek
Dredging
2008-01709-M18
July 23, 2008 |
August 23, 2008 |
|
Anne Arundel County Department
of Public Works
C/O Kendra Scheminant (Agent) 1321 Mercedes Drive, Suite C Hanover,
Maryland 21076
|
Location: Mill Creek, Magothy River, Anne Arundel County, Maryland
To hydraulically or mechanically
maintenance dredge a 315-foot long by 50-foot wide main channel
to a depth of -6.5 feet below mean low water and a 976-foot long
by 30-50 foot wide main channel to a depth of -4.5 to -5.5 feet
deep mean low water in Mill Creek connecting to the Magothy River
and Chesapeake Bay. Additionally, 17 spur channels to be dredged.
Project Manager:
Richard Kibby
410-962-0694 |
SPN
08-47
SPECIAL PUBLIC NOTICE 08-47
|
|
Draft
Northcentral and Northeast Regional Supplement to the 1987 Corps
of Engineers Wetland Delineation Manual.
Point of Contact:
Jennifer McCarthy
CECW-CO |
PN
08-46
Baltimore County Department of Environmental
Protection and Resource
Shallow Creek
Dredging
2008-01942-M22
July 21, 2008 |
August 12, 2008 |
|
Baltimore County Department of
Environmental Protection and Resource Management 401 Bosley
Avenue, Suite 416 Towson, Maryland 21204-4488
|
Location: In the main channels of Shallow Creek, located directly off the
Chesapeake Bay between Back River and the Patapsco River in southeastern
Baltimore County, Maryland.
To maintenance dredge by hydraulic or mechanical
method a 4,595 foot by 50 foot main channel (Seg A) to -5.5 feet
mean low water (MLW); a 1,140 foot by 40 foot main channel (Seg
B) to -5.5 feet MLW; a 100 foot by 100 foot channel (Seg C-turning
basin) to -5.5 feet MLW; and a 700 foot by 40 foot main channel
(Seg D) to -4.5 feet MLWS. In addition, 14 private spur channels
are proposed for dredging.
Project Manager:
Joseph
DaVia
410-962-4527 |
PN
08-45
Anne Arundel County Department of
Public Works
Shady Cove
Breakwater
2008-01486-M27
July 14, 2008 |
August 14, 2008 |
|
Anne Arundel County
1 Harry Truman Parkway
Annapolis, MD 21401
|
Location: Shady Cove Peninsula, in Shadyside, Maryland on the West River
(Latitude: 380 50' 54"! Longitude: 76030'08")
To construct 690 linear feet of segmented stone
sills, place 8,000 cubic yards of sand, and install plantings
to create over 2.0 acres of tidal marsh. Five deteriorated pilings
(off-shore), fallen trees (off-shore) and a deteriorated bulkhead
would be removed.
Project Manager:
Erika Mark
410-962-6144 |
PN
08-44
Maryland Jockey Club,
Laurel Racetrack.
Phase III
2007-07041-M06
July 12, 2008 |
August 27, 2008 |
|
Maryland Jockey Club
1058 Thomas Jefferson Street, NW
Washington, D C 20007
|
Location: In non-tidal wetlands, streams, and floodplains of the Patuxent
River, Anne Arundel County, Maryland.
The purpose of this PN is to request public comment
on the upgrade of the existing Laurel Race Park and construction
of a mixed-use development and to announce the date, time and
location of a Maryland Department of the Environment/Corps joint
public hearing.
Project Manager:
Phil Cwiek
410-962-6010 |
PN
08-43
Revised
Charles County Government
Cross County Connector, Phases 6 & 7
Road Crossing & Bridge
2005-60531
June 30, 2008 |
September 15, 2008 |
|
|
Subject: Public Hearing regarding construction of a new four-lane
road system to connect Middletown Road and Indian Head Highway.
The U.S. Army Corps of Engineers (COE) and Maryland
Department of the Environment (MDE) public hearing will be held
on Thursday, July 31, 2008, at the Charles County Government Building
Auditorium, 200 Baltimore Street, La Plata, Maryland.
Project Manager:
Steve Harman
410-962-6082 |
PN
08-42
Maryland Maritime, Inc.
Dredging
2008-01481-M02
June 30, 2008 |
July 30, 2008 |
|
Maryland Maritime, Inc.
c/o Barnes Engineering, Inc.
119 Rosewood Drive
Metairie, LA 70005
|
Location: Patapsco River, at 396 East Cromwell Street, Baltimore
City, Maryland.
The applicant proposes to mechanically dredge a
1,010 foot by 160 foot area to 32 feet below mean lower low water,
and to deposit the approximately 10,000 cubic yards of dredged
material at the Hart Miller Island Dredged Material Containment
Facility in Baltimore County, Maryland.
Project Manager:
Jon Romeo
410-962-6079 |
SPN
08-41
SPECIAL PUBLIC NOTICE 08-41
Final Compensatory Mitigation Rule
|
|
Project
Name: Final Compensatory Mitigation Rule
Project Manager:
Beth Bachur
410-962-4336 |
SPN
08-40
SPECIAL PUBLIC NOTICE 08-40
Establishment of Restricted Areas
|
|
Project
Name:U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Marine Corps Base Quantico
During Force Protection Conditions Alpha through Delta/Homeland
Security Threat Advisories Blue through Red.
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-39
SPECIAL PUBLIC NOTICE 08-39
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action during the
Force Protection Condition Charlie or Delta/Homeland Security
Threat Advisory Orange or Red.
Project Manager:
Steve Elinsky
410-962-4503 |
PN
08-38
Charles County
Planning & Growth Management
Upper Port Tobacco River Dredge
2008-01545-M27
June 24, 2008 |
July 24, 2008 |
|
Charles County Commissioners
Attn: Mr. Wayne Cooper
Department of Planning & Growth Management
P.O. Box 2150
La Plata, MD 20646
|
Location: The Upper Port Tobacco River, Charles County, Maryland.
The applicant proposes to hydraulic or mechanically
maintenance dredge in the Upper Port Tobacco River, Charles County,
MD. The project would involve dredging a 53 foot wide, 7,400-linear
foot channel to a depth of -5 MLW for a total of 423,200 square
feet (17,520 cubic yards) of dredge spoil.
Project Manager:
Erika Mark
410-962-6144 |
PN
08-37
Baltimore County
Department of Environmental Protection and Resource Management
Tabasco Cove
Dredging
2008-01527-M22
June 30, 2008 |
July 30, 2008 |
|
Baltimore County
Department of Environmental Protection and Resource Management
401 Bosley Avenue
Suite 416
Towson, MD 21204-4488
|
Location: In the main channel, east fork and west fork of Tabasco
Cove, upper reaches of Bear Creek in Southeastern Baltimore County,
Maryland.
To maintenance dredge by hydraulic or mechanical
method a 590-foot (approximately 23, 600 square feet) main channel
segment (A) to -4.5 feet mean low (MLW), a 1,060-foot by 50-foot
(approximately 53,000 square feet) main channel segment (B) to
-4.5 feet MLW, and a 415-foot by a varied width of 25 to 50-foot
main channel segment (C) (approximately 16,526 square feet) to
-3.5 feet MLW. The total length of the main channel is 2,065 linear
feet (93,126 square feet), resulting in approximately 3,034 cubic
yards of silt and clay.
Project Manager:
Joseph DaVia
410-962-4527 |
PN
08-36
Boy Scouts of America
DEL-MAR-VA Council 81
Camp Rodney
Stone Sill
2008-00975-M12
June 24, 2008 |
July 24, 2008 |
|
Del-Mar-Va Council 81
Boy Scouts of America
801 N. Washington Street
Wilmington, Delaware 19801
|
Location: On the grounds of the Boy Scouts of America's Rodney Scout Reservation
located to the north of Turkey Point on the Chesapeake Bay in
Cecil County, Maryland.
To construct a segmented stone sill along the shoreline
of Camp Rodney measuring approximately 1,000 feet in length along
1,125 feet of the shore, extending a maximum of 96 feet channelward
of the mean high water line (MHW). Approximately 3,150 cubic yards
of clean sand would be deposited behind the sill where a low mars,
scrub/shrub wetland and riparian floodplain forest would be created.
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-35
SPECIAL PUBLIC NOTICE 08-35
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action during the
Force Protection Condition Charlie or Delta/Homeland Security
Threat Advisory Orange or Red.
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-34
SPECIAL PUBLIC NOTICE 08-34
Establishment of Restricted Areas
|
|
Project
Name:U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Marine Corps Base Quantico
During Force Protection Conditions Alpha through Delta/Homeland
Security Threat Advisories Blue through Red.
Project Manager:
Steve Elinsky
410-962-4503 |
PN
08-33
MES
Garner Scrap Tire Site
Tire Removal & Veg Stabilization
2008-01248
(2008-61177)
May 28, 2008 |
June 18, 2008 |
|
Mr. Wallace Gamer
c/o Ms. Gwen Gibson
ARCADIS
326 First Street, Suite 200
Annapolis, Maryland 21403
|
Location: In nontidal wetlands and unnamed tributaries and Tom Walls Branch
at Brandywine, Prince Georges County, Maryland.
Project Manager:
Kathy Anderson
410-962-5690 |
PN
08-32
Kingman Island
2008-09245-M27
June 9, 2008 |
June 30, 2008 |
|
Office of the Deputy Mayor for
Planning & Economic Development
Attn: Mr. Jay Juergensen
John Wilson Building
1350 Pennsylvania Avenue
Washington, DC 20004
|
Project
Location: In tidal waters of Kingman Lake and Kingman
Island, within the Anacostia River, Washington, DC.
To construct an environmental education
center (EEC) and associated recreational facilities requiring
the installation of 20 pilings channelward of the approximate
mean high water (MHW) shoreline of Kingman Island in the Anacostia
River.
Project Manager:
Erika Mark
410-962-6144 |
PN
08-31
SPECIAL PUBLIC NOTICE 08-31
Pennsylvania Consultants Workshop
June 18, 2008
|
|
Project
Name: Pennsylvania Consultant Workshop, June 18, 2008
Project Manager:
Mary Lou Martin
814-235-0576
Conference
Presentations can be found here. |
PN
08-30
Choptank Electric Cooperative
07-61305-7/07-01001-M07
May 19, 2008 |
June 3, 2008 |
|
Choptank Electric Cooperative
Mr. Robert Collier
P.O. Box 430
Denton, Maryland 21629
|
Location: Located off Hip Roof Road near Golden Hill, Dorchester County,
Maryland.
To construct a power line transmission
access road and ditch.
Project Manager:
Maria Teresi
410-962-4501 |
PN
08-29
George Matthews
07-08329-M05/07-63589
May 12, 2008 |
June 3, 2008 |
|
Mr. George Matthews
695 Seagull Beach Road
Prince Frederick, Maryland 20678
|
Location: In the Patuxent River near Hallowing Point, Calvert County, Maryland.
To construct revetment with backfill.
Project Manager:
Kathy Anderson
410-962-5690 |
PN
08-28
United States Naval Academy
Santee Basin
Dredging
08-01234-M18
|
Mr. Daniel P. King, Capt., CEC
USN
NA VFAC -Annapolis, United States Naval Academy
181 Wainwright Road
Annapolis, Maryland 21402
|
Location: Holloway Road, Santee Basin/Severn River, United States Naval
Academy (USNA), Anne Arundel County, Maryland.
To hydraulically or mechanically dredge
a 126,324 square foot (2.9 acres) marina basin. The southern part
of the basin will be dredged to a depth of -12.0 mean low water
(MLW) at 10-feet from the existing bulkhead wall. The eastern
section of the basin is proposed to be dredged to a depth of -14.0
feet at MLW at 10-feet from the existing bulkhead wall.
Project Manager:
Richard Kibby
410-962-0694 |
PN
08-27
Pleasure Cove Marina, LLC
Travel Lift, Pier & Walkway
05-61701-M27
|
Mr. Gerald Herson
Pleasure Cove Marina, LLC
15525 Frederick Road
Rockville, MD 20855-2110
|
Location: Main Creek, Pleasure Cove Marina, 1701 Poplar Ridge Road, Pasadena,
Maryland.
To mechanically maintenance dredge
110,500 square foot marina basin to the -6.0 feet at mean low
water (MLW), a 100-foot long by 30-foot wide travel lift area
to the -7.0 depth at MLW.
Project Manager:
Erika Mark
410-962-6144 |
PN
08-26
AES Sparrows Point LNG & Midatlantic
Express LLC
Dredging & Pipeline
07-01644-M16
April 25, 2008 |
June 26, 2008 |
|
AES Sparrows Point LNG, LLC
|
Description: The purpose of this PN is to request public comments on the proposed
project, to announce the availability of a draft environmental
impact statement for the proposed project, and to announce the
dates, locations, and times of joint Federal Energy Regulatory
Commission/Corps public hearing. The Draft Environmental Impact
Statement can be found here.
Project Manager:
Joseph DaVia
410-962-4527 |
PN
08-25
Virginia Electric & Power Company
Possum Point Power Station
Dredging
07-64780
April 28, 2008 |
May 29, 2008 |
|
Virginia Electric & Power
Company
5000 Dominion Boulevard
Glen Allen, VA 23060
|
Location: In the Potomac River, at Dumfries, Prince William County, Virginia,
and Charles County, Maryland.
To maintenance dredge an existing
cooling water intake channel and oil barge access channel.
Project Manager:
Steve Harman
410-962-6082 |
SPN
08-24
SPECIAL PUBLIC NOTICE 08-24
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Marine Corps Base Quantico
During Force Protection Conditions Alpha through Delta/Homeland
Security Threat Advisories Blue through Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-23
SPECIAL PUBLIC NOTICE 08-23
Establishment of Restricted Areas
|
|
Project
Name:U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Military Assets During
Force Protection Condition Charlie or Delta/Homeland Security
Threat Advisory Orange or Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-22
SPECIAL PUBLIC NOTICE 08-22
Revision to the Pennsylvania State Programmatic General
Permit (PASPGP-3) Bog Turtle Habitat Clearance Process.
|
|
Project
Name: The Corps of Engineers is providing notification
to the public regarding updates to lists of counties requiring
screening procedures for endangered species. This notice affects
proposed projects that may be authorized by the Corps or Pennsylvania
Department of Environmental Protection through the PASPGP-3.
Project Manager:
Patricia Strong
410-962-1847 |
PN
08-21
Charlestown Commissioners
Dredging
08-00606-M12
April 25, 2008 |
May 25, 2008 |
|
Town Commissioners of Charlestown
P. O. Box 154
Charlestown, Maryland 21914
|
Location: At Charlestown' s Town Pier off of Water Street on the Northeast
River located in Charlestown, Cecil County, Maryland.
To provide mechanical maintenance
dredging in and around Charlestowns Town Pier into the waters
of the Northeast River as depicted on the attached plans dated
March 2008. Within the footprint of the proposed project, an area
of approximately 57,560 square feet (1.32 acres) would be dredged
to a depth of -4.0 feet at mean low water.
Project Manager:
Steve Elinsky
410-962-4503 |
PN
08-20
Howard County Department of Public
Works
Little Patuxent Parallel Sewer Interceptor
Utility Line
07-07575-M16
March 31, 2008 |
May 14, 2008 |
|
Howard County Department of Public
Works
Attention: Mr. Kin Siew
9250 Bendix Road
Columbia, Maryland 21045
|
Location: In the Little Patuxent River and unnamed tributaries, and adjacent
wetlands, parallel to the existing Little Patuxent Sanitary Sewer
right-of-way, from Savage to Columbia, Howard County, Maryland.
The purpose of this Public Notice
is to annouce the date, location, and time of a public hearing
for the proposed Howard County Department of Public Works, Little
Patuxent Parallel Sewer Interceptor Project.
Project Manager:
Joseph DaVia
410-962-4527 |
SPN
08-19
SPECIAL PUBLIC NOTICE 08-19
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Marine Corps Base Quantico
During Force Protection Conditions Alpha through Delta/Homeland
Security Threat Advisories Blue through Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-18
SPECIAL PUBLIC NOTICE 08-18
Establishment of Restricted Areas
|
|
Project
Name:U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Military Assets During
Force Protection Condition Charlie or Delta/Homeland Security
Threat Advisory Orange or Red
Project Manager:
Steve Elinsky
410-962-4503 |
PN
08-16
PA DOT - S.R. 0879, Section A02
- Bridge Replacement over the West Branch of the Susquehanna River
06-02601-P12
March 24, 2008 |
April 7, 2008 |
|
Pennsylvania Department of Transportation
Engineering District 2-0
1924 Daisy Street Extension
Clearfield, PA 16830
|
Location: S.R. 0879, Section A02 - Bridge Replacement over the West Branch
of the Susquehanna River, in Lawrence Township, Clearfield County,
Pennsylvania
To discharge dredged or fill material
into waters of the United States, including jurisdictional wetlands,
associated with the replacement of the S.R. 0879 three-span steel
thru-girder bridge, including minor approach roadway improvements.
Project Manager:
Mike Dombroskie
814-235-0571 |
PN
08-15
PA DOT - S.R. 1021, Section 370
- 8th Street Bridge Replacement over the Susquehanna River
07-09475-P12
March 24, 2008 |
April 7, 2008 |
|
Pennsylvania Department of Transportation
District 4-0
55 Keystone Industrial Park
Dunmore, PA 18512
|
Location: The proposed bridge replacement project carries S.R. 1021, locally
known as Eighth Street, over the Susquehanna River, in Jenkins
Township and Wyoming Borough, Luzerne County, Pennsylvania
The project is to replace the existing
Eighth Street Bridge over the Susquehanna River.
Project Manager:
Mike Dombroskie
814-235-0571 |
PN
08-14
Anne Arundel County Department of
Public Works
Main Creek
Dredging
07-08058-M18
March 17, 2008 |
April 17, 2008 |
|
Anne Arundel County Department
of Public Works
1321 Mercedes Drive, Suite C
Hanover, Maryland 21076
|
Location: Main Creek, Pasadena, Anne Arundel County, Maryland
To hydraulically or mechanically maintenace
dredge a 1,090 foot long by 30 foot wide main channel in Main
Creek to depths of -5.0 to -4.0 feet below mean low water connecting
to the Bodkin Creek and Chesapeake Bay. Additiionally, 14 spur
channels listed below are proposed.
Project Manager:
Richard Kibby
410-962-0694 |
SPN
08-13
SPECIAL PUBLIC NOTICE 08-13
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Marine Corps Base Quantico
During Force Protection Conditions Alpha through Delta/Homeland
Security Threat Advisories Blue through Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-12
SPECIAL PUBLIC NOTICE 08-12
Establishment of Restricted Areas
|
|
Project
Name:U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Military Assets During
Force Protection Condition Charlie or Delta/Homeland Security
Threat Advisory Orange or Red
Project Manager:
Steve Elinsky
410-962-4503 |
PN
08-11
Columbia Realty Venture LLC,
Dredging
07-08040-M18
March 3, 2008 |
April 3, 2008 |
|
Columbia Realty Venture LLC
5301 Wisconsin Avenue, N.W.,
Suite 600
Washington, DC 20015
|
Location: In the waters of Back Creek in the City of Annapolis, Anne Arundel
County, Maryland
To provide maintenance dredging in
six areas as elaborated below and depicted on the attached plans.
Project Manager:
Richard Kibby
410-962-0694 |
PN
08-10
MD DNR, Fisheries Service
Oyster Seed Planting
08-00512-M24
February 19, 2008 |
March 19, 2008 |
|
Maryland Department of Natural
Resources
Fisheries Service
580 Taylor Avenue, B-2
Annapolis, Maryland 21401
|
Location: Chesapeake Bay and tributaries
This project will permit the planting
of oyster seed in Maryland's Chesapeake Bay, its tributaries and
Maryland's Coastal Bays. Seed oysters will be planted by a variety
of groups: DNR, ORP, CBF, MWA and other organizations, all operating
under this permit granted to the Department of Natural Resources.
The plantings will predominantly take place on Natural Oyster
Bars and Historic Oyster Bars. Seed will be planted in harvest,
reserve and sanctuary areas.
Project Manager:
Mary Frazier
410-962-5679 |
PN
08-08
US Navy, Patuxent River NAS
East Basin
Dredging
08-00045
February 6, 2008 |
February 28, 2008 |
|
U.S. Navy Patuxent Naval Air Station
Mr. Kyle Rambo
c/o St. Mary's Soil Conservation District
22660 Washington Street
Leonardtown, Maryland 20650
|
Location: In East Basin off the Patuxent River at Patuxent River Naval Air
Station, St. Mary's County, Maryland.
To maintenance dredge by hydraulic
mehtod an approximate 679,000 square foot area to -14 feet mean
low water resulting in approximately 84,500 cubic yards of sand
and gravel to be deposited at an existing upland (non-wetland)
disposal area on site.
Project Manager:
Kathy Anderson
410-962-5690 |
SPN
08-07
SPECIAL PUBLIC NOTICE 08-07
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Marine Corps Base Quantico
During Force Protection Conditions Alpha through Delta/Homeland
Security Threat Advisories Blue through Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-06
SPECIAL PUBLIC NOTICE 08-06
Establishment of Restricted Areas
|
|
Project
Name:U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Military Assets During
Force Protection Condition Charlie or Delta/Homeland Security
Threat Advisory Orange or Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-05
SPECIAL PUBLIC NOTICE 08-05
Agreement with Pennsylvania Department of Transportation
|
|
Project
Name:Agreement with Pennsylvania Department of Transportation
to Accept Non-Federal Agency Funds for Section 404 and Section
10 Permit Review.
Project Manager:
John Gibble
717-249-9457 |
PN
08-04
Howard County Department of Public
Works
Little Patuxent Parallel Sewer Interceptor
Utility Line
07-07575-M1
January 22, 2008 |
February 22, 2008 |
|
Howard County Department of Public
Works
Attention: Mr. Kin Siew
9250 Bendix Road
Columbia, Maryland 21045
|
Location: In the Little Patuxent River and unnamed tributaries, and adjacent
wetlands, parallel to the existing Little Patuxent Sanitary Sewer
right-of-way, from Savage to Columbia, Howard County, Maryland.
Discharges of dredged or fill material
into waters of the US, including jurisdictional wetlands, associated
with construction of approximately 55,000 linear feet (10.4 miles)
of parallel sewer interceptor pipeline within/adjacent to the
existing Little Patuxent Sewer interceptor utility right-of-way.
The proposed pipeline would deviate from a strict parallel alignment
only in areas where a parallel sewer could conflict with existing
infrastructure, historic/cultural, or natural resource constraints.
Project Manager:
Joseph DaVia
410-962-4527 |
PN
08-03
DEENAH LLC
Fishing Point Marine Terminal
07-09626-M02
January 22, 2008 |
February 22, 2008 |
|
DEENAH LLC
529 Terminal Avenue
New Castle, Delaware 19720
|
Location: Patapsco River and Curtis Bay, at Fishing Point, Baltimore City,
Maryland.
The applicant proposes to construct
a total of 2,675 linear feet of stone revetment, 1,100 feet of
which is to extend no more than 5 feet channelward of the approximate
mean high water (MHW) shoreline, and 1,565 linear feet to extend
no more than 18 feet channelward of the approximate MHW shoreline.
The purpose of this work is to control shoreine erosion and to
protect an existing bulkhead from further damage.
Project Manager:
Jon Romeo
410-962-6079 |
SPN
08-02
SPECIAL PUBLIC NOTICE 08-02
Establishment of Restricted Areas
|
|
Project
Name: U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Marine Corps Base Quantico
During Force Protection Conditions Alpha through Delta/Homeland
Security Threat Advisories Blue through Red
Project Manager:
Steve Elinsky
410-962-4503 |
SPN
08-01
SPECIAL PUBLIC NOTICE 08-01
Establishment of Restricted Areas
|
|
Project
Name:U.S. Army Corps of Engineers’ Action Granting Legal
Authorities to Support the Protection of Military Assets During
Force Protection Condition Charlie or Delta/Homeland Security
Threat Advisory Orange or Red
Project Manager:
Steve Elinsky
410-962-4503 |