Revetment 2.0R |
8/26/98 12:09:34 PM Placement of random fill in Revetment 2.0R.
|
|
Revetment 2.0R |
8/26/98 12:07:26 PM Excavating material along alignment of Revetment 2.0R.
|
|
Cofferdam Cell Construction |
8/26/98 11:45:53 AM Driving Y-pile in Cell 28.
|
|
Project Site |
8/26/98 11:35:58 AM Looking upstream toward the right descending bank.
|
|
Cofferdam Cell Construction |
8/26/98 11:35:41 AM Cells 14, 15, 16, 17, and 18 (under construction).
|
|
Cofferdam Cell Construction |
8/26/98 11:35:24 AM View of Cells 28 (under construction), 29, 30, and 31. Cell fill has been placed in Cells 30 and 30.
|
|
Cell Fill |
8/26/98 11:33:39 AM Placement of cell fill in Cell 29.
|
|
Cofferdam Cell Construction |
8/26/98 11:21:28 AM Placement of template for Cell 28.
|
|
Excavating Cell Fill Material |
8/26/98 11:13:43 AM Luhr Brothers, Inc. Liebherr 944 excavating material for cell fill from the Mississippi River upstream from the mouth of the White River.
|
|
Cofferdam Cell Construction |
8/26/98 11:05:47 AM View from river of Cells 14, 15, 16, 17, and 18 (l to r). Crane driving sheets in Cell 18.
|
|
Cofferdam Cell Construction |
8/26/98 11:05:28 AM View from river of Cells 31, 30, and 29 (r to l). Note crane placing template for Cell 28 and placement of cell fill in Cell 29.
|
|
Diversion Channel Dredging |
8/26/98 11:01:47 AM Looking upstream at completed diversion channel revetment. Note the deposition in the revetment stone which occurred during periods of high water.
|
|
Diversion Channel Dredging |
8/26/98 10:59:24 AM Looking downstream at partially excavated diversion channel. Note cell construction on right.
|
|
Cofferdam Cell Construction |
8/26/98 10:58:21 AM Cells 14, 15, 16, 17, and 18 (r to l). Dredge ELCO in foreground.
|
|
Diversion Channel Dredging |
8/26/98 10:52:51 AM The dredge ELCO near station 33+00 of the diversion channel.
|