
Jeff Tripe
CESWF-PER
U.S. Army Corps of Engineers
Fort Worth District
P.O. Box 17300-0300
819 Taylor Street
Phone: 817-886-1716
These documents require the Adobe PDF Reader. Click here to download the reader.
A Detailed Project Report and integrated Environmental Assessment (DPR/EA) have been prepared to evaluate environmental restoration alternatives at the Aquarena Center and Spring Lake located on the Texas State University – San Marcos (TxSt) in San Marcos, Texas. The proposed project would restore valuable aquatic and terrestrial habitats throughout Spring Lake, which have been degraded by the construction, operation, and existence of the Aquarena Center, the surrounding golf course and other urban developments
- Spring Lake Integrated Detailed Project Report and Environmental Assessment (Draft)
- Appendix A - Site Photographs
- Appendix B - USFWS Coordination Report and BO
- Appendix C - Hydrologic and Hydraulic Information
- Appendix D - Habitat Eval Procedure Information
- Appendix E - TPWD Endangered Species
- Appendix F - Cultural Resource Coordination
- Appendix G - Hazardous, Toxic, and Radiological Waste (HTRW)
- Appendix H - Structural Demolition List
- Appendix I - Vegetation Planting Plan
- Appendix J - Incremental Cost Analysis Output
- Appendix K - Project Costs
- Appendix L - Real Estate Plan
- Appendix M - Project Cooperation Agreement
- Appendix N - Pertinent Correspondence