Center Hill Dam Seepage Reduction
 
bullet Click Here for the Current Center Hill Lake Elevation

Introduction

Welcome to the Nashville District's web site
for the Center Hill Dam Seepage Reduction Study.

Currently, Three issues are relevant:

bullet

Fixing The Dam

The Corps of Engineers, Nashville District has an approved plan to address serious seepage at Center Hill Dam and has obtained Federal funds for design and construction of a long term fix.  Construction will begin in 2008 and be completed by 2014.  Four large construction contracts are planned.  The first contract was recently awarded to address the most critical parts of the dam affected by seepage, the earthen embankment of the main dam and the left rim (to the southwest of the dam).  Throughout construction we will continue to closely monitor the dam.  


 

bulletLake Levels throughout Construction

The seepage problems are made worse during continual high lake levels; therefore, maintaining lower lake elevations is necessary until we get a permanent remedy in place.

Since March of 2005, we have attempted to keep fall, winter and early spring lake levels from extreme rises. We have also attempted to operate the lake on the low end of our normal annual operating band. During construction, however, the Corps plans to target Center Hill Lake levels between elevation 630 feet above mean sea level (msl) in the summer and no lower than elevation 618 msl during the late fall and early winter.

These elevations are approximately five to ten feet lower than recent pool operating levels, and as much as eighteen feet lower than normal operating levels. During the five year repair period, this interim pool operation will be periodically re-evaluated to determine if Center Hill Lake can be safely raised, maintained, or if further lowering is necessary to ensure safety.

The chosen levels are the result of an Environmental Impact Statement (EIS) developed over the past year. The EIS evaluated potential impacts caused by each of nine lake level alternatives.

The process included consideration of safety concerns, potential impact to project purposes, and the views of the State of Tennessee, other federal agencies, affected stakeholders, and the public. The goal of the EIS was to identify an alternative that balanced the safety of the downstream human and natural environment against the reduction of project benefits from water supply, water quality, recreation, navigation, and hydropower.

 
bullet

Emergency Action and Information

Although not anticipated, there are events that could cause the Corps to lower the lake as an emergency action.  Your County Emergency Managers have maps of areas which could flood if Center Hill Dam were to fail.  The Corps has an aggressive Dam Safety program to constantly monitor all of our dams in the Cumberland River system and Center Hill is being monitored constantly.  Lower lake levels have slowed the seepage progression.  The Corps will use news articles, websites, and public meetings to keep the public informed of the dam’s condition and of progress of the foundation remedy throughout construction.

 

Accurate and timely information is critical to the effective resolution of many issues associated with Corps of Engineers projects. This web site has been established to provide information you need to stay informed. The site will be updated, based on the needs of our site visitors. Please let us know what you need. Please share this site with others interested in this project.

Please provide your questions or comments about the Center Hill Dam Seepage Rehabilitation Project on the comments page. This email account  will be monitored by the Public Affairs Office and a response sent back within two working days.

Center Hill Gate Installation Rescheduled; Highway 96 Over Dam Closes August 4th
(News Release 07/11/08)

Orifice gate to be installed at Center Hill Dam
(News Release 06/27/08)

U.S. Army Corps of Engineers awards first construction contract at Center Hill Dam
(News Release 02/25/08)

Center Hill Lake Elevations to be Lower during Remediation Work
(News Release 02/25/08)


Center Hill Public Meeting Briefing


Center Hill Dam Brochure

 

Get Adobe Reader

 

PRINT MEDIA

For news accounts, click on the link below.

-MORE-


Points of Contact: 
Questions about this page: Public Affairs Officer
Questions about this website: Webmaster

Page Last Updated:
30 October 2008

Privacy and Security Notice
Information Quality Act (IQA)