Willow Island (Lock & Dam)
Newport, OH

Photo - Willow Island Locks and Dams aerial view looking upstream
General Information
River and Harbor Act of 3 March 1909, Sixtieth Congress, 2nd Session.
Estimated construction $76,520,800.
Non-navigable, high-lift, gated dam, top length 1,128' including 111-foot fixed weir with 84-foot open crest. Eight tainter gates, clear span 110' between piers, damming height 26' above sills, clearance above maximum high water when fully raised approximately 5'.
Of an estimated 1,750 acres in the project, approximately 92.8 acres fee required for the lock site, 32.1 acres fee at the abutment site, 13.3 acres fee for recreation site, .06 acre fee at radio site and flowage easements or other lesser interests over the remaining area.
N/A
Ohio River, 161.7 miles downstream from Pittsburgh, PA, and 3.4 miles upstream from Waverly, WV, replaced Locks and Dams Nos. 15, 16 and 17.
Two parallel locks, main lock 110' by 1200', auxiliary lock 110' by 600', miter service gates, vertical-lift emergency gates.
92.8 acres fee at lock site. 32.1 acres fee at abutment site. 13.3 acres fee at recreation sites. 0.06 acres fee at radio relay site. 1612.1 acres flowage easements which includes 63.12 acres flowage rights by special use permit from D.O.A., U.S. Forest Service.
Normal upper pool elevation 602.0' m.s.l., upper pool length 35.3 miles to Hannibal Dam, normal upper pool surface area 6,400 acres, normal lower pool elevation 582.0' m.s.l., (upper pool of Belleville Dam) normal lift 20.0'.
Three recreation areas are existing or proposed for development. (See R/H 1-A for location and status).
No extensive relocations necessary, but remedial measures required to adapt certain facilities to new pool conditions. Facilities include railroad and highway drainage structures and embankment slopes, municipal sewer outfalls and water intakes, pipe lines, power and communication lines, and water terminals.
Construction began in January 1967 and the total project is 100 percent complete. The locks construction contract was awarded in October 1968 and placed in operation in January 1972. Dam construction was initiated in December 1971 and completed in 1976. The pool was raised to full height in September 1975.
Lock Photos
Description
6 Photos
Last Updated Mar. 10, 2004
Search
Other Lock and Dams
Announcements
No Items Available
Navigation Info
Center of Expertise for Inalnd Navigation
How and where to purchase navigation charts
On-line navigation charts available for download. This list will grow overtime to provide all charts in the LRD division.
Navigation Data Information System
The LRD website allows you to sign up for email notifications of Nav Notices that are only applicable to the tributaries of your choosing.
Locations of vessels (boats/tows/barges) on the rivers.
Page Options

HyperLink Disclaimer: The appearance of hyperlinks does not constitute endorsement by the U.S. Army of this Web site or the information, products or services contained therein. For other than authorized activities such as military exchanges and Morale, Welfare and Recreation sites, the U.S. Army does not exercise any editorial control over the information you may find at these locations. Such links are provided consistent with the stated purpose of this DoD Web site.

Freedom of Information Act:  The Chief Counsel's Office has developed a FOIA Requester Service Center Web Site, http://www.hq.usace.army.mil/CECI/FOIA/index.htm


LRH Operations
U.S. Army Corps of Engineers, Huntington District
502 Eighth Street
Huntington, WV 25701
(304) 399-5000
LRH.Operations@usace.army.mil
Back to Top  Page Top