Captain Meldahl (Lock & Dam)
Felicity, OH

Photo - Captain Anthony Meldahl Photos
General Information
River and Harbor Act of 3 March 1909, Sixtieth Congress, 2nd Session.
Estimated construction $74,082,900.
Non-navigable, high-lift, gated dam, top length 1,756' including 372-foot fixed weir with 310-foot open crest. Twelve tainter gates, clear span 100' between 14-Foot intermediate piers and 15-foot end piers, damming height 35' above sills, clearance above maximum high water when fully raised approximately 5'. There are two types of gates, submergible and non-submergible ogee sill units.
N/A
N/A
Ohio River, 436.2 miles below Pittsburgh, PA, and 1.7 miles below Chilo, OH. Replaced locks and dams Nos. 31, 32, 33 and 34 on Ohio River.
Two parallel locks, main lock 110' by 1,200', auxiliary lock 110' by 600', miter service gates, vertical-lift emergency gates.
198.4 acres fee at lock site. 81.4 acres fee at abutment site. 168.5 acres fee at recreation sites. 0.06 acres fee at FM radio facility site. 6,049.7 acres easements.
Normal upper pool elevation 485.0 m.s.l., upper pool length 95.2 miles to Greenup Dam, normal upper pool surface area 21,700 acres, normal lower pool elevation 455.0' m.s.l., (upper pool of Markland Dam), normal lift 30.0'.
A total of 11 public recreation areas either existing or proposed for development. (See R/H 1-A for locations and status).
No extensive relocations necessary, but remedial measures required to adapt certain facilities to new pool conditions. Facilities include railroad and highway drainage structures and embankment slopes, municipal and industrial sewer outfalls and water intakes.
Construction of the project was initiated in April 1958. Construction of the locks was started in March 1959 and they were placed in operation in November 1962. Construction of the dam was started in April 1961 and it was placed in operation 22 December 1964. The pool was raised to full height 31 March 1965.
Lock Photos
Description
7 Photos
Last Updated Mar. 19, 2004
Search
Other Lock and Dams
Announcements
No Items Available
Navigation Info
Center of Expertise for Inalnd Navigation
How and where to purchase navigation charts
On-line navigation charts available for download. This list will grow overtime to provide all charts in the LRD division.
Navigation Data Information System
The LRD website allows you to sign up for email notifications of Nav Notices that are only applicable to the tributaries of your choosing.
Locations of vessels (boats/tows/barges) on the rivers.
Page Options

HyperLink Disclaimer: The appearance of hyperlinks does not constitute endorsement by the U.S. Army of this Web site or the information, products or services contained therein. For other than authorized activities such as military exchanges and Morale, Welfare and Recreation sites, the U.S. Army does not exercise any editorial control over the information you may find at these locations. Such links are provided consistent with the stated purpose of this DoD Web site.

Freedom of Information Act:  The Chief Counsel's Office has developed a FOIA Requester Service Center Web Site, http://www.hq.usace.army.mil/CECI/FOIA/index.htm


LRH Operations
U.S. Army Corps of Engineers, Huntington District
502 Eighth Street
Huntington, WV 25701
(304) 399-5000
LRH.Operations@usace.army.mil
Back to Top  Page Top