USACE Logo Relevant, Ready, Responsive, Reliable
Welcome to the Huntington District > Projects > Current Projects > Monday Creek Feasibility Study
Monday Creek Feasibility Study
Hocking River, Monday Creek Feasibility Study

Photos
Photo - Acid Mine Drainage
Acid Mine Drainage
Photo - Discharge at Essex Mine
Discharge at Essex Mine
Photo - Essex Mine
Essex Mine
Project Description

Project Manager  304-399-5083.

OVERVIEW: The Monday Creek watershed of the Hocking River Basin study area encompasses 116 square miles of Perry, Athens and Hocking Counties, Ohio. Extensive portions of the Monday Creek watershed have been subjected to underground and surface mining. Severe acid mine drainage has degraded over 100 miles of streams in the area. A number of stream reaches are essentially sterile and unable to support diverse aquatic life. The project being implemented is construction of various restoration activities to improve the overall ecosystem. Environmental restoration activities include limited stream restoration, wetland creation and wildlife habitat restoration involving both active and passive treatment of acid mine drainage. The Ohio Department of Natural Resources is the non-Federal sponsor.  

Project Status: The feasibility study is complete and was approved by the Civil Works Review Board for inclusion in the Chief's Report in September 2005. Authorization for construction was in the Water Resources Development Act (WRDA) '07, and an Omnibus Bill signed on 26 December 2007, appropriated $282,000 in federal Preconstruction Engineering and Design (PED) funds to initiate the PED phase.  Congressional authorization is still required for the Corps to use its funds to do work on U.S. Forest Service lands.

Fiscal Year 2008 Activities (Oct 07 - Sep 08):
  • Execute design agreement with ODNR
  • Initiate preconstruction, engineering and design
  • POINTS OF EMPHASIS:

    • The Monday Creek Restoration Project, a local citizens group, is working closely with the Corps of Engineers to improve Monday Creek Watershed. 
    • West Virginia University has developed a Total Acid Mine Drainage Load (TAMDL) computer model to model the results of various remedial treatments.
    • The U.S. Department of Energy's National Energy Technology Laboratory provided technical oversight and contract administration of the West Virginia University model study.
    • Congressional Interests: Senators Voinovich and Brown; Space (OH-18), Hobson (OH-7)

    Search
    News
    Jul. 29, 2005
    The Monday Creek Ecosystem Restoration Project Final Report and Environmental Assessment
    No questions available

    HyperLink Disclaimer: The appearance of hyperlinks does not constitute endorsement by the U.S. Army of this Web site or the information, products or services contained therein. For other than authorized activities such as military exchanges and Morale, Welfare and Recreation sites, the U.S. Army does not exercise any editorial control over the information you may find at these locations. Such links are provided consistent with the stated purpose of this DoD Web site.

    Freedom of Information Act:  The Chief Counsel's Office has developed a FOIA Requester Service Center Web Site, http://www.hq.usace.army.mil/CECI/FOIA/index.htm


    LRH Planning
    U.S. Army Corps of Engineers, Huntington District
    502 Eighth Street
    Huntington, WV 25701
    (304) 399-5636
    LRH.Planning@Lrh01.usace.army.mil
    Back to Top  Page Top